36C26119B0026-081.docx

DOCX document 21 KB Posted

Attached to
VAPAHCS - Correct Facility Deficiencies Menlo Park Division & Mountain View Center
Solicitation number
36C26119B0026
Issued by

About this file

36C26119B0026 P09 - Specification 024100 - Demolition.docx

View the file

Other files

File Type Posted
36C26119B0026-0002003.xlsx XLSX spreadsheet
36C26119B0026-0002002.dwg DWG drawing
36C26119B0026-0002001.dwg DWG drawing
36C26119B0026-0002000.docx DOCX document
36C26119B0026-0001000.docx DOCX document
36C26119B0026-089.docx DOCX document
36C26119B0026-069.pdf PDF
36C26119B0026-084.docx DOCX document
36C26119B0026-076.docx DOCX document
36C26119B0026-085.docx DOCX document
36C26119B0026-064.docx DOCX document
36C26119B0026-072.pdf PDF
36C26119B0026-066.pdf PDF
36C26119B0026-082.docx DOCX document
36C26119B0026-077.docx DOCX document
36C26119B0026-090.docx DOCX document
36C26119B0026-071.pdf PDF
36C26119B0026-078.pdf PDF
36C26119B0026-073.pdf PDF
36C26119B0026-093.docx DOCX document
36C26119B0026-070.pdf PDF
36C26119B0026-092.docx DOCX document
36C26119B0026-079.doc DOC document
36C26119B0026-065.pdf PDF
36C26119B0026-067.pdf PDF
36C26119B0026-074.docx DOCX document
36C26119B0026-075.doc DOC document
36C26119B0026-087.docx DOCX document
36C26119B0026-088.docx DOCX document
36C26119B0026-068.pdf PDF
36C26119B0026-080.pdf PDF
36C26119B0026-063.docx DOCX document
36C26119B0026-083.docx DOCX document
36C26119B0026-091.docx DOCX document
36C26119B0026-086.docx DOCX document
36C26119B0026-000.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-01-17

SECTION 02 41 00

DEMOLITION

Correct Building Deficiencies Project Number: 640-19-112M

PART 1 GENERAL

1.1 DESCRIPTION:

This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.
To see specification 02 41 00 general and subcontractor workers shall remove all construction job debris and all their personal debris example drink bottles, daily lunches into contractor own dumpster not on Veterans Affairs dumpster or garbage bins.

1.2 RELATED WORK:

A. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).

B Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.

C. Reserved items that are to remain the property of the Government: Section 01 00 00, GENERAL REQUIREMENTS.

D. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.

E. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.

H. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.

1.3 PROTECTION:

A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT PREVENTION.

B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.

C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.

D. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum.

E. In addition to previously listed fire and safety rules to be observed in performance of work, include following:

1. No wall or part of wall shall be permitted to fall outwardly from structures.

2. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.

F. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Veterans Affairs Health Care System; any damaged items shall be repaired or replaced as approved by the C.O.R. – Contracting Officer Representative. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

G. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.

H. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.

PART 3 – EXECUTION

3.1 DEMOLITION:

A. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by general contractor on daily, off the Veterans Affairs Health Care System to avoid accumulation at the demolition site. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations. If the dumping ground site that VENDOR required general contractor more on soil testing before they can take the debris, soil, all costs shall incur by General Contractor not on the Veterans Affairs.

All soils are hauling from the Veterans Affairs Health Care System Livermore, Menlo Park, Palo Alto Division: “General Contractor shall bear all costs including all soil testing that Vendor land field Dump Site required more testing. Addition, all City, State California, Federal rules contractor shall obey, follow, all above costs will be on general contractor responsibility.”

3.2 CLEANUP:

On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to C.O.R. Contracting Officer Representative.

Cleanup shall be done daily with wet mop not dry mop, work shall be done 30 minutes before the end of shift work. Also sticky mats shall be replaced at least once a day. Negative Air machines shall be on 24 hours, 7days per week.

E N D 02 41 00 - 5