36C26119B0015-009.pdf
PDF 6 MB Posted
- Attached to
- 654-19-1-6059-0008 project 654-17-706 Electrical & HVAC Improvements to MRI Wing & Bldg 12 (VA-19-00023067)
- Solicitation number
- 36C26119B0015
About this file
36C26119B0015 654-17-706 - Final Dwg's_Part7.pdf
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTS (CABLE BRACE OPTION)
NTS (CABLE BRACE OPTION)
NTS (SOLID BRACE OPTION)
SEISMIC RESTRAINT REQUIREMENTS
SEISMIC RESTRAINT GUIDELINES FOR SEISMIC DESIGN CATEGORY D:
1. SEISMIC BRACING SPECIFIED IN SPECIFICATIONS SECTION
"SEISMIC BRACING OF NON-STRUCTURAL COMPONENTS" IS
REQUIRED FOR ALL MECHANICAL SYSTEMS IN THIS PROJECT.
DETAILS INCLUDED HEREIN ARE FOR THE CONTRACTORS
REFERENCE TO PROVIDE GENERAL GUIDANCE TO THE EXTENT OF
THE BRACING NECESSARY. THE CONTRACTOR SHALL EMPLOY THE
SERVICES OF THE SEISMIC BRACING COMPONENT
MANUFACTURER'S SEISMIC ENGINEER FOR FINAL BRACING
DETAILS.
2. ALL MECHANICAL PIPING AND EQUIPMENT ON THIS PROJECT HAS A
COMPONENT IMPORTANT FACTOR OF 1.5 AND SHALL BE
SEISMICALLY BRACED UNLESS IT MEETS ONE OF THE FOLLOWING
EXCEPTIONS:
2.1. SEISMIC BRACES CAN BE EXCLUDED FROM HIGH
DEROMABILITY PIPING WITH A NOMIBAL PIPE SIZE OF 1 INCH
OR LESS WHERE PROVISIONS ARE MADE TO PROTECT THE
PIPING FROM IMPACT OF LARGER PIPING OR OTHER
EQUIPMENT
2.2. PIPING SUPPORTED BY ROD HANGERS PROVIDED THAT ALL
HANGERS IN THE PIPE RUN ARE 12 INCHES OR LESS IN LENGTH
FROM THE TOP OF THE PIPE TO THE SUPPORTING
STRUCTURE, HANGERS ARE DETAILED TO AVOID BENDING OF
THE HANGERS AND THEIR ATTACHMENTS, AND PROVISIONS
ARE MADE FOR PIPING TO ACCOMMODATE EXPECTED
DEFLECTIONS.
GENERAL SEISMIC BRACING NOTES:
1. SEISMIC BREAKING MAY CONSIST OF SOLID BRACING DESIGNED
TO ACCEPT LOADS IN TENSION AND COMPRESSION OR CABLE
BRACING DESIGNED TO ACCEPT TENSION LOADS ONLY. EACH
BRACE METHOD REQUIRES A VERTICAL HANGER AT OR WITHIN
4-INCHES OF HEIR ATTACHMENT TO THE MECHANICAL SYSTEM.
THE VERTICAL HANGER MAY OR MAY NOT REQUIRE STIFFENING OR
ADDITIONAL ANCHORAGE TO THE STRUCTURE.
2. EACH STRAIGHT PIPE OR DUCT RUN WITH TWO OR MORE
SUPPORTS REQUIRES A MINIMUM OF TWO TRANSVERSE BRACES.
3. EACH STRAIGHT PIPE OR DUCT RUN REQUIRES A MINIMUM OF ONE
LONGITUDINAL BRACE PARALLEL TO THE RUN.
4. TRANSVERSE AND LONGITUDINAL BRACES SHALL BE INSTALLED UP
TO 45 DEGREE BRACE ANGLE FROM THE HORIZONTAL OR (1)
BRACE HORIZONTAL AND (1) BRACE VERTICAL. BRACE SPACING
CAN BE REDUCED TO ALLOW BRACE DIFFERENT BRACE ANGLES
AT THE DISCRETION OF THE SEISMIC ENGINEER.
5. DO NOT MIX SOLID BRACING WITH CABLE BRACING IN THE SAME
DIRECTION.
6. DO NOT BRACE SYSTEM TO TWO DIFFERENT PARTS OF A BUILDING
WHICH MAY ACT DIFFERENTLY IN RESPONSE TO AN EARTHQUAKE.
FOR EXAMPLE, AVOID CONNECTING A TRANSVERSE BRACE TO A
WALL AND LONGITUDINAL BRACE TO A FLOOR OR ROOF AT SAME
BRACE LOCATION. ANY SYSTEM THAT CROSSES A BUILDING
SEISMIC JOINT MUST BE DESIGNED TO ACCOMMODATE 2 TIMES
THE JOINT WIDTH DISPLACEMENTS.
7. TRAPEZE HANGERS WITH MULTIPLE COMPONENTS ARE
DISCOURAGED BUT IF REQUIRED EACH MEMBER MUST BE
CLAMPED OR BOLTED TO THE TRAPEZE. MULTIPLE OR STACKED
TRAPEZES THAT SHARE SUPPORT RODS MUST BE BRACED
INDEPENDENTLY FROM ON ANOTHER.
8. THREADED ROD HANGERS DESIGNED TO CARRY GRAVITY LOADS
MAY REQUIRED ADDITIONAL ANCHORAGE OR STIFFENING AS
DETERMINED BY SEISMIC MANUFACTURER'S ENGINEER. THE USE
OF "C-CLAMPS" DESIGNED TO ATTACH THREADED ROD TO ONE
SIDE OF STEEL BEAM FLANGE FLANGE SHALL NOT BE USED
UNLESS THEY ARE PROVIDED WITH A RESTRAINING STRAP OR
HOOK TO THE OPPOSITE SIDE OF THE BEAM.
9. BRACING CABLES SHALL BE PRE-STRETCHED GALVANIZED 7X19
STRAND CORE AIRCRAFT CABLE WITH NO LIMIT TO THEIR
INSTALLED LENGTH. CABLE SHALL NOT BE DESIGNED TO SUPPORT
GRAVITY LOAD AND ONLY SLACK SHALL BE DUE TO THE CABLE'S
OWN WEIGHT.
MAXIMUM BRACE SPACING
OF STEEL METAL DUCTWORK
SEISMIC
ACCELERATION
INPUT (G)
MAXIMUM
TRANSVERSE
BRACE
SPACING-FT(M)
MAXIMUM
LONGITUDINAL
BRACE
SPACING-FT (M)
0.598 G
30 (9.1)
60 (18.2)
STEEL & COPPER PIPE
MAXIMUM BRACE SPACING
0.598 G
40 (12.2)
80 (24.4)
NO-HUB PIPE
MAXIMUM BRACE SPACING
0.598 G 20 (6.1)
40 (12.2)
SEISMIC
ACCELERATION
INPUT (G)
MAXIMUM
TRANSVERSE BRACE
SPACING-FT(M)
MAXIMUM
LONGITUDINAL
BRACE
SPACING-FT (M)
MAXIMUM
SEISMIC
ACCELERATION
INPUT (G)
MAXIMUM
TRANSVERSE BRACE
SPACING
FT(M)
MAXIMUM
LONGITUDINAL
BRACE
SPACING - FT (M)
NTS (CABLE BRACE OPTION)
ROD COUPLING
IF REQUIRED
SEISMIC CLAMP
IF REQUIRED
ROD STIFFENER ANGLE
IF REQUIRED
THREADED ROD
SWIVEL FASTNER
STEEL BRACE OR
STRUT CHANNEL
MAIMUM 9'-6" (2.9 m)
SEISMIC SOLID BRACE
CLEVIS CROSS BRACE
PIPE HANGER
SUPPORT ANCHORAGE
NOTE: 1, DESIGN RESTRAINING DEVICES (ANGLES & BOLTS) TO WITHSTAND
1.0 G LATERAL AND VERTICAL LOADS.
2. INSTALL LATERAL RESTRAINING DEVICES ON ALL SIDES OF EQUIPMENT BASE.
NOTE:
1. SNUBBERS SHALL BE DESIGNED TO WITHSTAND 1.0 G LATERAL AND VERTICAL
LOADS.
2. SNUBBERS SHALL BE SERIES Z-1001 AS MANUFACTURED BY MASON INDUSTRIES
INC. OR APPROVED EQUAL.
3. INSTALL 4 ALL-DIRECTION SNUBBERS THAT ARE DOUBLE ACTING AND LOCATED
AS CLOSE TO THE VIBRATION ISOLATORS AS POSSIBLE.
4. SNUBBERS SHALL CONSIST OF INTERLOCKING STEEL MEMBERS RESTRAINED BY
3/4" MIN, REMOVABLE NEOPRENE COMPOUNDED TO BRIDGE BEARING
SPECIFICATIONS.
5. SNUBBERS SHALL BE MANUFACTURED WITH AN AIR GAP BETWEEN STEEL AND
NEOPRENE OF NOT LESS THAN 1/8" NOR MORE THAN 1/4" .
RESILIENT PADS TO RETARD
IMPACT LOADS (TYP.)
EQUIPMENT
BASE
OPERATING GAP EQUAL TO HALF OF
STATIC DEFLECTION OF THE
ISOLATION MOUNTS (5/8" MAX.)
STEEL ANGLES TOP ANGLE MAY BE
WELDED IN FIELD TO ADJUST
OPERATING GAP OPERATING GAP
1/16" OVERSIZE HOLE OR
IF LARGER USE WASHER
AND WELD ALL AROUND
ANCHOR BOLTS OR
EXPANSION BOLTS
FLOOR
SIDE VIEW
( TYP.) VIBRATION ISOLATION ASSEMBLY
BOLTED TO EQUIPMENT BASE AND
STRUCTURAL SUPPORT
EQUIPMENT
BASE
ISOLATION MOUNTS SHALL BE DESIGNED
TO WITHSTAND 1.0 G LOADS IN THE
VERTICAL DIRECTION ONLY
OPERATING GAP EQUAL TO HALF
OF STATIC DEFLECTION OF THE
ISOLATION MOUNTS (5/8" MAX.)
RESILIENT PADS TO
RETARD IMPACT LOADS
(TYP.)
1/16" OVERSIZE HOLE OR IF
LARGER USE WASHER AND WELD
ALL AROUND
ANCHOR BOLTS OR
EXPANSION BOLTS
SIDE VIEW
FLOOR OR FLOOR MOUNTED EQUIPMENT W/VIBRATION ISOLATION
EQUIPMENT
BASE
FLOOR OR
ROOF
ANCHOR BOLT OR EXPANSION BOLT
NEOPRENE WASHER AND SLEEVE
STAINLESS STEEL BONDED PLATE
RESILIENT PAD DESIGNED FOR
1/4" MAX. STATIC DEFLECTION
ISOLATION ASSEMBLY SHALL BE DESIGNED TO
WITHSTAND 0.5 G LATERAL AND VERTICAL LOADS
EQUIPMENT RESTRAINED BY RESILIENT PADS OR NEOPRENE ISOLATORS
RESTRAINING DEVICES FOR LATERAL AND VERTICAL LOADS
EQUIPMENT RESTRAINED BY SNUBBERS
SUPPORT STRUCTURE
ROD COUPLING
IF REQUIRED
SEISMIC CLAMP
IF REQUIRED
ROD STIFFENER ANGLE
IF REUIRED
THREADED ROD
ANCHORAGE
AIRCRAFT CABLE
SEISMIC CABLE BRACE
PIPE CLAMP
PIPE HANGER
MAXIMUM 4 IN. (102 mm)
PIPE CLAMP MAY BE
ROTATED TO GAIN ACCESS
TO STRUCTURE ABOVE
THREADED ROD
ROD COUPLING
IF REQUIRED
SEISMIC CLAMP
IF REQUIRED
ROD STIFFENER ANGLE
IF REQUIRED
THREADED ROD
SWIVEL FASTNER
AIRCRAFT CABLE
SEISMIC CABLE BRACE HOOK
CLEVIS CROSS BRACE
PIPE HANGER
FLOOR
NOTE: 1, DESIGN RESTRAINING DEVICES (ANGLES & BOLTS) TO WITHSTAND
1.0 G LATERAL AND VERTICAL LOADS.
2. INSTALL LATERAL RESTRAINING DEVICES ON ALL SIDES OF EQUIPMENT BASE.
RESTRAINING DEVICES FOR LATERAL AND VERTICAL LOADS
FLOOR OR ROOF
SNUBBER
ASSEMBLY
VIBRATION
ISOLATION
ASSEMBLY
EQUIPMENT BASE
ANCHOR BOLTS OR
EXPANSION BOLTS
SIDE VIEW
Architecture, Engineering, and Sustainable Design design
AESUS
group
Architecture, Engineering, and Sustainable Design design
AESUS
group
Architecture, Engineering, and Sustainable Design design
AESUS
group
AHU CONTROL DIAGRAM
SEQUENCE OF CONTROLS
RUN CONDITIONS - REQUESTED:
THE UNIT SHALL RUN WHENEVER:
• ANY ZONE IS OCCUPIED.
• OR A DEFINABLE NUMBER OF UNOCCUPIED ZONES NEED HEATING OR COOLING.
EMERGENCY SHUTDOWN:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING AN EMERGENCY SHUTDOWN SIGNAL.
FREEZE PROTECTION:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A FREEZESTAT STATUS.
HIGH/LOW STATIC SHUTDOWN:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING AN HIGH OR LOW STATIC
SHUTDOWN SIGNAL.
RETURN AIR SMOKE DETECTION:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A RETURN AIR SMOKE DETECTOR STATUS.
SUPPLY AIR SMOKE DETECTION:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A SUPPLY AIR SMOKE DETECTOR STATUS.
AHU OPTIMAL START:
THE UNIT SHALL START PRIOR TO SCHEDULED OCCUPANCY BASED ON THE TIME NECESSARY FOR THE ZONES TO
REACH THEIR OCCUPIED SETPOINTS. THE START TIME SHALL AUTOMATICALLY ADJUST BASED ON CHANGES IN
OUTSIDE AIR TEMPERATURE AND ZONE TEMPERATURES.
SUPPLY FAN (12 FANS):
THE SUPPLY FANS SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN, UNLESS SHUTDOWN ON SAFETIES. TO
PREVENT SHORT CYCLING, THE SUPPLY FANS SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME. SUPPLY
FANS SHALL RAMP UP AS ONE FAN.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• SUPPLY FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• SUPPLY FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• SUPPLY FAN RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
SUPPLY AIR DUCT STATIC PRESSURE CONTROL:
THE CONTROLLER SHALL MEASURE DUCT STATIC PRESSURE AND MODULATE THE SUPPLY FAN VFD SPEED TO
MAINTAIN A DUCT STATIC PRESSURE SETPOINT. THE SPEED SHALL NOT DROP BELOW 30% (ADJ.). THE STATIC
PRESSURE SETPOINT SHALL BE RESET BASED UPON THE POSITION OF THE ZONE DAMPERS, WITH A GOAL OF
REDUCING THE STATIC PRESSURE UNTIL AT LEAST ONE ZONE DAMPER IS NEARLY WIDE OPEN.
• THE INITIAL DUCT STATIC PRESSURE SETPOINT SHALL BE 1.5IN H2O (ADJ.).
• IF NO ZONE DAMPER IS NEARLY WIDE OPEN, THE SETPOINT SHALL INCREMENTALLY RESET DOWN TO A
MINIMUM OF 1.3IN H2O (ADJ.) .
• AS ONE OR MORE DAMPERS NEARS THE WIDE OPEN POSITION, THE SETPOINT SHALL INCREMENTALLY RESET
UP TO A MAXIMUM OF 1.8IN H2O (ADJ.).
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.) GREATER THAN
SETPOINT.
• LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.) LESS THAN SETPOINT.
• SUPPLY FAN VFD FAULT.
RETURN FANS (12 FANS):
THE RETURN FANS SHALL RUN WHENEVER THE SUPPLY FANS RUN. RETURN FANS SHALL RAMP UP AND DOWN AS
ONE FAN AND NOT BE STAGED.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• RETURN FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• RETURN FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• RETURN FAN RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
• RETURN FAN VFD FAULT.
RETURN PLENUM STATIC PRESSURE CONTROL:
THE CONTROLLER SHALL MEASURE RETURN PLENUM STATIC PRESSURE AND MODULATE THE RETURN FAN VFD
SPEED TO MAINTAIN A RETURN PLENUM STATIC PRESSURE SETPOINT OF 0.2IN H2O (ADJ.). THE RETURN FAN VFD
SPEED SHALL NOT DROP BELOW 20% (ADJ.).
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH RETURN PLENUM STATIC PRESSURE: IF THE RETURN AIR PLENUM STATIC PRESSURE IS 25% (ADJ.)
GREATER THAN SETPOINT.
• LOW RETURN PLENUM STATIC PRESSURE: IF THE RETURN AIR PLENUM STATIC PRESSURE IS 25% (ADJ.) LESS
THAN SETPOINT.
ENERGY RECOVERY - RUN-AROUND LOOP COILS:
THE CONTROLLER SHALL MODULATE THE RUN-AROUND LOOP MIXING VALVE FOR ENERGY RECOVERY AS FOLLOWS.
COOLING RECOVERY MODE:
THE CONTROLLER SHALL MEASURE THE RUN-AROUND LOOP COIL DISCHARGE AIR TEMPERATURE (DOWNSTREAM OF
THE OUTSIDE AIR COIL) AND MODULATE THE RUN-AROUND LOOP MIXING VALVE TO MAINTAIN A SETPOINT 2°F (ADJ.)
LESS THAN THE UNIT SUPPLY AIR TEMPERATURE SETPOINT. THE RUN-AROUND LOOP SHALL RUN FOR COOL
RECOVERY WHENEVER:
• UNIT RETURN AIR TEMPERATURE IS 5°F (ADJ.) OR MORE BELOW THE OUTSIDE AIR TEMPERATURE.
• AND THE UNIT IS IN A COOLING MODE.
• AND THE ECONOMIZER IS OFF.
• AND THE SUPPLY FAN IS ON.
HEATING RECOVERY MODE:
THE CONTROLLER SHALL MEASURE THE RUN-AROUND LOOP COIL DISCHARGE AIR TEMPERATURE (DOWNSTREAM
OF THE OUTSIDE AIR COIL) AND MODULATE THE RUN-AROUND LOOP MIXING VALVE TO MAINTAIN A SETPOINT
2°F (ADJ.) GREATER THAN THE UNIT SUPPLY AIR TEMPERATURE SETPOINT. THE RUN-AROUND LOOP SHALL RUN
FOR HEAT RECOVERY WHENEVER:
UNIT RETURN AIR TEMPERATURE IS 5°F (ADJ.) OR MORE ABOVE THE OUTSIDE AIR TEMPERATURE.
AND THE UNIT IS IN A HEATING MODE.
AND THE ECONOMIZER IS OFF.
AND THE SUPPLY FAN IS ON.
FROST PROTECTION:
THE RUN-AROUND LOOP PUMP SHALL RUN AND THE RUN-AROUND LOOP MIXING VALVE SHALL CLOSE TO 0% (ADJ.) IN
ORDER TO CIRCULATE WATER THROUGH THE RUN-AROUND LOOP EXHAUST AIR COIL WHENEVER:
• RUN-AROUND LOOP TEMPERATURE DROPS BELOW 33°F (ADJ.)
• OR THE EXHAUST AIR TEMPERATURE DROPS BELOW 30°F (ADJ.).
PREHEATING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE MIXED AIR TEMPERATURE AND MODULATE THE PREHEATING COIL VALVE TO
MAINTAIN ITS SETPOINT 5°F (ADJ.) LESS THAN THE SUPPLY AIR TEMPERATURE SETPOINT.
THE PREHEATING SHALL BE ENABLED WHENEVER:
• OUTSIDE AIR TEMPERATURE IS LESS THAN 60°F (ADJ.).
• AND THE ECONOMIZER IS DISABLED.
• AND THE SUPPLY FAN STATUS IS ON.
THE PREHEATING COIL VALVE SHALL OPEN FOR FREEZE PROTECTION WHENEVER:
• MIXED AIR TEMPERATURE DROPS FROM 40°F TO 35°F (ADJ.).
• OR THE FREEZESTAT IS ON.
SUPPLY AIR TEMPERATURE SETPOINT - OPTIMIZED:
THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE AND SHALL MAINTAIN A SUPPLY AIR
TEMPERATURE SETPOINT RESET BASED ON ZONE COOLING AND HEATING REQUIREMENTS
THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET FOR COOLING BASED ON ZONE COOLING REQUIREMENTS
AS FOLLOWS:
• THE INITIAL SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 55°F (ADJ.).
• AS COOLING DEMAND INCREASES, THE SETPOINT SHALL INCREMENTALLY RESET DOWN TO A MINIMUM
OF 53°F (ADJ.).
• AS COOLING DEMAND DECREASES, THE SETPOINT SHALL INCREMENTALLY RESET UP TO A MAXIMUM OF
72°F (ADJ.) .
IF MORE ZONES NEED HEATING THAN COOLING, THEN THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET
FOR HEATING AS FOLLOWS:
• THE INITIAL SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 82°F (ADJ.).
• AS HEATING DEMAND INCREASES, THE SETPOINT SHALL INCREMENTALLY RESET UP TO A MAXIMUM OF
85°F (ADJ.).
• AS HEATING DEMAND DECREASES, THE SETPOINT SHALL INCREMENTALLY RESET DOWN TO A MINIMUM OF
72°F (ADJ.).
SEQUENCE OF CONTROLS (CONT.)
COOLING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND MODULATE THE COOLING COIL VALVE TO
MAINTAIN ITS COOLING SETPOINT.
THE COOLING SHALL BE ENABLED WHENEVER:
• OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ.).
• AND THE ECONOMIZER IS DISABLED OR FULLY OPEN.
• AND THE SUPPLY FAN STATUS IS ON.
• AND THE HEATING IS NOT ACTIVE.
THE COOLING COIL VALVE SHALL OPEN TO 50% (ADJ.) WHENEVER THE FREEZESTAT IS ON.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ.) GREATER THAN SETPOINT.
LOW SUPPLY AIR TEMPERATURE ALARM:
THE CONTROLLER SHALL ALARM IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
ECONOMIZER:
THE CONTROLLER SHALL MEASURE THE MIXED AIR TEMPERATURE AND MODULATE THE ECONOMIZER DAMPERS IN
SEQUENCE TO MAINTAIN A SETPOINT 2°F (ADJ.) LESS THAN THE SUPPLY AIR TEMPERATURE SETPOINT. THE OUTSIDE
AIR DAMPERS SHALL MAINTAIN A MINIMUM ADJUSTABLE POSITION OF 20% (ADJ.) OPEN WHENEVER OCCUPIED.
THE ECONOMIZER SHALL BE ENABLED WHENEVER:
• OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).
• AND THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE RETURN AIR TEMPERATURE.
• AND THE SUPPLY FAN STATUS IS ON.
THE ECONOMIZER SHALL CLOSE WHENEVER:
• MIXED AIR TEMPERATURE DROPS FROM 40°F TO 35°F (ADJ.).
• OR THE FREEZESTAT IS ON.
• OR ON LOSS OF SUPPLY FAN STATUS.
THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL CLOSE AND THE RETURN AIR DAMPER SHALL OPEN WHEN THE UNIT
IS OFF. IF OPTIMAL START UP IS AVAILABLE THE MIXED AIR DAMPER SHALL OPERATE AS DESCRIBED IN THE OCCUPIED
MODE EXCEPT THAT THE OUTSIDE AIR DAMPER SHALL MODULATE TO FULLY CLOSED.
MINIMUM OUTSIDE AIR VENTILATION - FIXED PERCENTAGE:
THE OUTSIDE AIR DAMPERS SHALL MAINTAIN A MINIMUM ADJUSTABLE POSITION DURING BUILDING OCCUPIED HOURS
AND BE CLOSED DURING UNOCCUPIED HOURS.
HUMIDIFIER CONTROL:
THE CONTROLLER SHALL MEASURE THE RETURN AIR HUMIDITY AND MODULATE THE HUMIDIFIER TO MAINTAIN A
SETPOINT OF 50% RH (ADJ.). THE HUMIDIFIER SHALL BE ENABLED WHENEVER THE SUPPLY FAN STATUS IS ON.
THE HUMIDIFIER SHALL TURN OFF WHENEVER:
• SUPPLY AIR HUMIDITY RISES FROM 90% RH TO 95% RH (ADJ.).
• OR ON LOSS OF SUPPLY FAN STATUS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR HUMIDITY: IF THE SUPPLY AIR HUMIDITY IS GREATER THAN 90% RH (ADJ.).
• LOW SUPPLY AIR HUMIDITY: IF THE SUPPLY AIR HUMIDITY IS LESS THAN 30% RH (ADJ.).
PREFILTER DIFFERENTIAL PRESSURE MONITOR:
THE CONTROLLER SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE PREFILTER.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• PREFILTER CHANGE REQUIRED: PREFILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE LIMIT
(ADJ.).
FINAL FILTER DIFFERENTIAL PRESSURE MONITOR:
THE CONTROLLER SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE FINAL FILTER.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• FINAL FILTER CHANGE REQUIRED: FINAL FILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE LIMIT
(ADJ.).
MIXED AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE MIXED AIR TEMPERATURE AND USE AS REQUIRED FOR ECONOMIZER
CONTROL OR PREHEATING CONTROL .
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.).
• LOW MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
RETURN AIR HUMIDITY:
THE CONTROLLER SHALL MONITOR THE RETURN AIR HUMIDITY AND USE AS REQUIRED FOR ECONOMIZER CONTROL
OR HUMIDITY CONTROL .
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS GREATER THAN 70% (ADJ.).
• LOW RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS LESS THAN 35% (ADJ.).
RETURN AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE RETURN AIR TEMPERATURE AND USE AS REQUIRED FOR SETPOINT CONTROL
OR ECONOMIZER CONTROL .
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.).
• LOW RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
SUPPLY AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS GREATER THAN 120°F (ADJ.).
• LOW SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
H L
TH
OA
BI - Freezestat
M
M
AO - Mixed Air Dampers
AI - Mixed Air Temp
AI - Return Air Temp
AO - Preheating Valve
HWS
HWR
RA
H L
BI - Return Air Smoke Detector
M
BO - Return Fan Start/Stop
BI - Return Fan Status
AO - Return Fan VFD Speed
BI - Return Fan VFD Fault
CT
VFD
H L
AI - Return Plenum Static Pressure
AI - Return Air Humidity
T
AI - Supply Air Temp
BI - Supply Air Smoke Detector
AI - Supply Air Humidity
AO - Humidifier
BO - Humidifier Enable
BI - High Static Shutdown
M
CT
VFD
BO - Supply Fan Start/Stop
BI - Supply Fan Status
AO - Supply Fan VFD Speed
BI - Supply Fan VFD Fault
AO - Cooling Valve
CHWS
CHWR
AI - Prefilter Differential Pressure
AI - Final Filter Differential Pressure
SA
Locate ¾ distance down longest duct
H
L
AI - Supply Air Static Pressure
H
STM
M
MM
M
EA
T
T
M
AI - Run-Around Loop Coil Discharge Air Temp
AI - Outside Air Temp
AI - Exhaust Air Temp
AI - Run-Around Loop Temp
AO - Run-Around Loop Mixing Valve
T
T
T T
SF
RF
N.C.
N.O.
N.C.
CHWHW
H L
GENERAL NOTES
1. CONTROLS CONTRACTOR SHALL ADD A LINK ON THE FRONT END THE SHOWS THE SEQUENCE OF OPERATION
AND CONTROLS DIAGRAM FOR THE EQUIPMENT INSTALLED IN THIS PROJECT. THE CLIENT SHALL HAVE THE
CAPABILITY TO SELECT THE EQUIPMENT AND REVIEW THE SOC AND DIAGRAM FOR THE EQUIPMENT.
2. ALL NEW CONTROLS TO COMMUNICATE WITH EXISTING EMS. FIELD INVESTIGATE EXISTING CONTROLS
EQUIPMENT TO DETERMINE CAPACITIES AND NETWORK LAYOUT PRIOR TO BID. SUBMIT DETAILED NETWORK
DIAGRAM AS REQUIRED BY SPECIFICATIONS.
3. PROVIDE CONTROL CABINET WHERE REQUIRED (SUITABLE FOR INTENDED LOCATION) COMPLETE WITH
POWER SUPPLIES, CONDUIT, SENSOR WIRING, COMMUNICATION WIRING AND RELATED HARDWARE AND
SOFTWARE. UNLESS NOTED OTHERWISE, THE BUILDING CONTROL SYSTEM SHALL BE CONNECTED TO
EMERGENCY POWER.
4. ALL SETPOINTS INDICATED SHALL BE ADJUSTABLE AT THE HOST COMPUTER WORKSTATION AND VIA A LAPTOP
COMPUTER CONNECTED TO ANY EMS CONTROL PANEL OR CONTROLLER. ACTUAL POINT NAMES SHALL
MATCH NAMING CONVENTION OF EXISTING EMS. POINT NAMES LISTED ON THE CONTROL DIAGRAMS ARE FOR
REFERENCE ONLY.
5. COORDINATE ALL SENSOR INSTALLATIONS WITH THE MECHANICAL CONTRACTOR AND SUBMIT PROPOSED
LOCATIONS ON PIPING COORDINATION DRAWING SUBMITTAL. COORDINATE TO INSURE THAT THE SENSOR
MANUFACTURER'S RECOMMENDED UPSTREAM AND DOWNSTREAM PIPE DIAMETERS ARE PROVIDED
(ESPECIALLY FLOW ELEMENTS AND TRANSMITTERS).
6. WHENEVER A UNIT IS SHUTDOWN BECAUSE OF ONE OF ITS SAFETIES, THE BAS SHALL RETAIN IN MEMORY THE
READING AND SET POINT OF EACH DEVICE TO HELP THE OPERATOR TO ISOLATE THE CAUSE OF THE
SHUTDOWN.
7. IF ANY LOCAL, TERMINAL, OR UNITARY CONTROLLER OR EQUIPMENT MANUFACTURER'S CONTROL SYSTEM
LOSES COMMUNICATION WITH THE BAS NETWORK, AN ALARM SHALL BE GENERATED BY THE BAS INDICATING
THE LOCATION OF THE FAULT.
8. UNLESS NOTED OTHERWISE, ALL CONTROL VALVES SHALL HAVE PROPORTIONAL CONTROL. NO
FLOATING-POINT CONTROLS SHALL BE ALLOWED. VALVES SHALL UTILIZE A 0-10 VDC CONTROL SIGNAL.
9. VFD'S SHALL BE CONNECTED TO THE EMS NETWORK THROUGH A DIRECT NETWORK CONNECTION AS WELL AS
THROUGH THE HARDWIRED POINTS INDICATED. IT IS THE RESPONSIBILITY OF THE EMS CONTRACTOR TO
COORDINATE AND ADAPT THE EMS NETWORK TO THE COMMUNICATIONS PROTOCOLS AVAILABLE FROM THE
VFD MANUFACTURER. THE FOLLOWING POINTS SHALL BE INTEGRATED INTO THE EMS: SPEED FEEDBACK, FREQUENCY OUTPUT, CURRENT, TORQUE, POWER, DC BUS VOLTAGE, OUTPUT VOLTAGE, KWH COUNTER, DRIVE TEMPERATURE, ALARMS, STATUSES
10. DUCT SMOKE DETECTORS PROVIDED AND INSTALLED BY THE FIRE ALARM CONTRACTOR (BELOW IN SPACE).
WIRE AND CONDUIT TO THE MOTOR CONTROLLER AND THE FACP BY THE FIRE ALARM CONTRACTOR. POWER
TO THE DETECTOR, WIRE, AND CONDUIT BY THE ELECTRICAL CONTRACTOR. COORDINATE WITH ELECTRICAL
PLANS AND FIRE ALARM CONTRACTOR FOR REQUIRED POWER.
11. VFD'S SHALL BE CONNECTED TO THE EMS NETWORK THROUGH A RS486 OR BACNET IP CONNECTION AS WELL
AS THROUGH THE HARDWIRED POINTS INDICATED. IT IS THE RESPONSIBILITY OF THE EMS CONTRACTOR TO
COORDINATE AND ADAPT THE EMS NETWORK TO THE COMMUNICATIONS PROTOCOLS AVAILABLE FROM THE
VFD MANUFACTURER.
12. CONTROLS SHALL BE SCHNEIDER ELECTRIC BUILDING AUTOMATION SERVER OR APPROVED EQUAL BY VA FT.
HARRISON ENGINEERING DEPARTMENT.
CONTROLS POINTS LIST
| 654-17-706 - Final Mech Drawings |
| 654-17-706 - Final Mech Drawings |
| Sheets and Views |
| M-501 MECHANICAL DETAILS-M-502 |
| M-601 MECHANICAL SCHEDULES-M601 |
| M-801 MECHANICAL CONTROLS-M801 |
| Sheets and Views |
| M801 |
File details come from the government source that posted it.