36C26119B0015-0007000.docx
DOCX document 21 KB Posted
- Attached to
- 654-19-1-6059-0008 project 654-17-706 Electrical & HVAC Improvements to MRI Wing & Bldg 12 (VA-19-00023067)
- Solicitation number
- 36C26119B0015
About this file
36C26119B0015 0007 36C26119B0015 0007.docx
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-04-2019 654-19-1-6059-0008 654-17-706 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno
NV
89502-2597 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno
NV
89502-2597 To all Offerors/Bidders
36C26119B0015 01-28-2019
X X X
March 14, 2019 10:30 AM Pacific Time 654-19-1-6059-0008 X The purpose of this amendment is to extend the closing date to March 14, 2019 at 10:30 AM Pacific Time, location will be conference room D2427, 975 Kirman Avenue, Reno, NV 89502, and to post responses to Request For Information (RFI).
All other terms and conditions shall remain unchanged.
Charee Harris Contract Specialist
36C26119B0015 Amendment 0007
RFI #10: Drawing E211 note 9 refers to Panel M as existing to remain. Drawing E004 Panel M, panel schedule indicates Panel to be a new panel. Which is Correct?
RFI 10 Answer - Panel M is an existing 225 Amp panel that is to be replaced with a 400 Amp panel. Note 9 changed on drawing E211 to clearly indicate we are replacing a 225A panel with a 400A panel. The panel name will remain Panel “M”.
RFI #11: Please review the entire one-line diagram on plan sheet E002 and Key notes on Sheet E201. It appears that there are undersized feeders to ATS PH. There appears to be double up on the #750MCM conduit runs to panels “M”, “EHLS”, and distribution board “HNMA”. All electrical pull boxes seem to be too small by code.
RFI 11 Answer - A) the Feeders to ATS PH should be have (2) in the description for parallel feeders. Drawings revised to show this. B) the feeders to the ATSs are running parallel feeders for the normal and generator power to each of the ATSs due to the voltage drop. Revised notes to help clarify that we are requiring parallel feeders. C) Electrical pull box call outs revised to meet NEC 314.28. Changes shown on drawings.
RFI #12: Plan sheet E201 – There is a conduit and cable conflict between sheet note #4 and #6.
Please specify what cable is actually required.
RFI 12 Answer - Feeder call out should be “NEW (2)SETS (4)#250CU AND (1)#3CU GND IN 2-1/2”C”. Revised note #4 to match riser note #6.
RFI #13: Sheet E201, note #12 – The Junction box is too small for this application. Please provide a detail and part numbers for how this tension box is to be put together and how the cable loops are to be supported with the springs.
RFI 13 Answer - A) the junction box sized per NEC 314.28 and shown on revised drawings. B) provided new detail on sheet E501.
RFI #14 - Sheet E202, note #2 – Please provide part #’s and a detail of how to install the tension springs with the cable loops. Junction boxes are too small to loop cables.
RFI 14 Answer - A) Provided new detail on sheet E501. B) the junction box sized per NEC 314.28 and shown on revised drawings.
RFI #15: Sheet E211, note #4 – Why does this box need tension springs? Is this box too small for this application? Please provide a detail for the tension spring system you are suggesting.
RFI 15 Answer - A) tension springs are not required. B) the junction box sized per NEC 314.28 and shown on revised drawings.
RFI #16 - 1. Referencing the Spec section 01 45 00 par 3.4B: The CQC System Manager qualification seems incomplete for the number of years and experience required. Please clarify.
RFI 16 Answer – Please see updated spec section 01 45 00 Par 3.4B
RFI #17 - Referencing the Spec section 01 45 00 par 3.4C: The CQC Personnel requirement seems incomplete and unedited. Please confirm what discipline for CQC personnel is required or applicable as stated in the Experience Matrix.
RFI 17 Answer – See update spec section 01 45 00 par 3.4C the experience matrix is provided as the base specification. The contractor shall use what is applicable per the project/specifications.
RFI 18 - Referencing the Spec section 01 45 35, Qualifications table beginning on page 7 and ending on page 11: The “Special Inspector” area seems unedited as it asks for 17 special inspectors to include pre-stressed, post-tensioned concrete construction and masonry construction. The RFP does not have pre-stressed, post-tension concrete or masonry activities. Please advise what are the minimum special inspection/inspector requirements.
RFI 18 Answer – Specification section 01 45 35 shall be removed in its entirety.
RFI #19 - Referencing the project duration as stated in the SF1442: It states 180 calendar days. There are major equipment requirements that will require a long lead time to fabricate. Is it the intent of the VA to issue an administrative NTP to allow for procurement, material submittal approval and fabrication lead time before issuing a construction NTP? If so, please advise how many days.
Answer RFI 19 – Period of performance is changed to 210 calendar days.
5. Referencing the 36C26119B0015-000.doc, Statement of Work for Construction Services, Section 4: Administrative, specifically 4.4 (page 4 of 52): ”… The contractor’s proposal will list the breakdown of all materials and labor and time required to complete the above-mentioned work.” Please confirm if this is required to be submitted with the proposal.
RFI #20: Please provide the existing distribution and panel schedule for “GNHDP-2” and “HNMA” to add new 400A 277/480 3PH breakers to. These are not shown in E-003 & E-004 Electrical Schedules.
RFI 20 Answer - Copies of one single lines for each is being provided. Distribution Panels chosen have Spare and Space for project’s new breakers. We can take photos of existing Distribution Panel’s name plates if desired.
RFI #21 - Please confirm it MHLS as stated in the Single Line Diagram (E-002) is the same as EHLS in E211 electrical key note#15.
RFI 21 Answer - Yes, change made to sheet E-002.
RFI #22 - Please provide AIC rating for the Panel boards as series rating is not allowed on this job.
RFI 22 Answer - The highest AIC we are connected to is 65KAIC, please size panel boards and equipment as 65KAIC. Added information to sheets E-002, E-003, and E-004.
RFI #23 - The largest gap is in the HVAC side of the project; we need detailed photos of the entire existing HVAC unit including all controls and all data plates. We also need detailed measurements of the units base, duct attachment points and entry points of the electrical and steam lines. Some of this is on the plans but not all.
RFI 23 Answer – Pictures of the HVAC are attached as 0643, 0645, 0645 and 0647. HVAC Specifications are also attached.
See attached document: VA RENO MRI ADDEND#1 ELECTRICAL SHEETS.
See attached document: Updated Mechanical Sheet M801.
See attached document: 000110 TOC Rev1.
See attached document: 014500 Quality Control Rev1.
See attached document: IMG_0643 AHU.
See attached document: IMG_0645 AHU.
See attached document: IMG_0646 AHU.
See attached document: IMG_0647 AHU.
See attached document: S02 5875-VA CURRENT AHU Specifications.