About this file

36C26119B0015 0001 36C26119B0015 0001.docx

View the file

Other files

File Type Posted
36C26119C0066-000.docx DOCX document
36C26119B0015-0010000.docx DOCX document
36C26119B0015-0010002.pdf PDF
36C26119B0015-0010001.pdf PDF
36C26119B0015-0009005.pdf PDF
36C26119B0015-0009000.docx DOCX document
36C26119B0015-0009004.pdf PDF
36C26119B0015-0009003.pdf PDF
36C26119B0015-0009001.pdf PDF
36C26119B0015-0009002.docx DOCX document
36C26119B0015-0008002.docx DOCX document
36C26119B0015-0008000.docx DOCX document
36C26119B0015-0008001.docx DOCX document
36C26119B0015-0007009.pdf PDF
36C26119B0015-0007006.jpg JPG image
36C26119B0015-0007001.pdf PDF
36C26119B0015-0007003.pdf PDF
36C26119B0015-0007004.pdf PDF
36C26119B0015-0007008.jpg JPG image
36C26119B0015-0007005.jpg JPG image
36C26119B0015-0007000.docx DOCX document
36C26119B0015-0007002.pdf PDF
36C26119B0015-0007007.jpg JPG image
36C26119B0015-0006006.pdf PDF
36C26119B0015-0006004.pdf PDF
36C26119B0015-0006002.pdf PDF
36C26119B0015-0006005.pdf PDF
36C26119B0015-0006007.pdf PDF
36C26119B0015-0006008.pdf PDF
36C26119B0015-0006009.pdf PDF
36C26119B0015-0006000.docx DOCX document
36C26119B0015-0006003.pdf PDF
36C26119B0015-0006001.pdf PDF
36C26119B0015-0005001.pdf PDF
36C26119B0015-0005000.docx DOCX document
36C26119B0015-0004000.docx DOCX document
36C26119B0015-0003001.pdf PDF
36C26119B0015-0003000.docx DOCX document
36C26119B0015-0002000.docx DOCX document
36C26119B0015-0001001.pdf PDF
36C26119B0015-005.pdf PDF
36C26119B0015-004.pdf PDF
36C26119B0015-000.docx DOCX document
36C26119B0015-011.docx DOCX document
36C26119B0015-001.pdf PDF
36C26119B0015-009.pdf PDF
36C26119B0015-013.docx DOCX document
36C26119B0015-012.docx DOCX document
36C26119B0015-006.pdf PDF
36C26119B0015-008.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26119B0015 Amendment 0001 Request for Information

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-29-2019 654-19-1-6059-0008 654-17-706 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System Kirman Avenue Reno NV 89502-2597 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders

36C26119B0015 01-28-2019

X X X

654-19-1-6059-0008 X The purpose of this amendment is to post responses to request for information (RFI) and to provide a copy of the hazardouse material report.

All other terms and conditions shall remain unchanged.

Charee Harris Contract Specialist Proposal Inquiry: (Type inquiry below)

1. Section 01 91 00 – General Commissioning Requirements, Part 1.8-C1 states that the VA will engage the Commissioning Agent (CxA) under a separate contract. Will the VA confirm that they will hire the CxA under a separate contract and that this will not be a cost to the Contractor? General Commissioning Requirements will not be a separate contract, it shall fall under the construction contract.

1. Section 01 00 00, Part 1.2 – Statement of Bid Items lists Item II, Alternate No. 1 as “TBD”. Will there be any Bid Alternates for this Solicitation? No Bid Alternates for this requirement, it will be all or none.

1. Will the VA designate an area for on-site storage / office trailer for this project? No space is available on-site for the storage / office trailer, trash dumpster or sani-hut. We will allow use of the restrooms in the hospital, which will be designated at the pre-construction meeting. We will also be providing a space within the hospital for a table and filing cabinet.

1. Section 01 00 00, Part 1.13 – Professional Surveying Services requires the Contractor to hire a registered land surveyor for this project. If a Surveyor is required for this project, will the VA describe the tasks and deliverables expected? Not required.

1. Section 01 00 00, Part 1.19 – Temporary Use of Existing Elevators is marked “N/A”. Will existing elevators be permitted to be utilized by the Contractor for this project? An existing elevator will be made available, the contractor will not have exclusive use. Contractor shall protect the elevator from damage.

1. Section 01 00 00, Part 1.31 – Photographic Documentation requires the Contractor to hire a Commercial Photographer for this project. Will the VA require the Contractor to include the costs of hiring a Commercial Photographer for this project or will in-house photographs be sufficient? Contractor may perform in-house provided the quality of photographs meets what is laid out in the specifications.

1. Will the Site Supt. be able to also serve in the roles of SSHO and CQC or will separate individuals be required for either of those two roles? The Site Supt. may be the SSHO or the CQC but not all three.

1. Section 02 82 11 – Traditional Asbestos Abatement was never edited by the Specification Writer. Will the VA provide a properly edited Specification Section 02 82 11, and importantly including Part 1.1.2 – Extent of Work? The Specification Section 02 82 11 will not be edited at this time. A Hazardous Material Survey will be provided. It appears that extent of work is none.

1. A Hazardous Material Survey was not included in this solicitation. Will the VA provide a current Hazardous Material Survey that covers the areas of work for this project? Yes

See attached document: Complete Volume 1 Hazardous Materials.