Attachment 2.3 668-24-108 Drawings.pdf

PDF 24 MB Posted

Attached to
Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center
Solicitation number
36C26027R0021
Issued by

About this file

This document is a set of construction drawings and specifications for repair of sanitary waste piping at the Mann-Grandstaff VA Medical Center. The project covers multiple floors (Fourth through Eighth) and includes replacement and installation of new sanitary pipe and bottle fill stations.

The scope of work encompasses demolition of existing elements including plaster walls, clay block, access doors, metal blank-off plates, and vinyl base, with selective retention and reuse of plastic bumper rails, handrails, wall finishes, and corner guards where undamaged. New work includes installation of 12-gauge framing with Unistrut supports, CMU filling of cavities, ceiling patching and replacement of ceiling pads within ICRA enclosures, wall preparation and painting to Level 5 finish, and installation of new base materials. Critical requirements include compliance with asbestos-containing materials (ACM) abatement practices and lead-based paint management, with ground-penetrating radar (GPR) scanning by contractors possessing five years of experience required prior to wall cutting. All existing cable trays, piping, and ducts must be replaced if damaged, and fire-rated assemblies must be maintained with proper labeling and draft stops. The contractor must notify the VA Contracting Officer's Representative (COR) if conditions are unsuitable for construction at the required pre-construction meeting, given that the VA has elected to proceed without comprehensive remediation of identified wall and door frame deficiencies observed during field investigation. Paint work includes HEPA-approved dust collection methods and fire-sealant closure of all chase cavity gaps to achieve UL-approved 1-hour fire-rated systems for insulated piping.

View the file

Other files

File Type Posted
Attachment 13 - Site Visit Sign-in Sheet.pdf PDF
Amendment 36C26027R0021 0004.docx DOCX document
Amendment 36C26027R0021 0003.docx DOCX document
Attachment 12 - 668-24-108 - Combined Specs. - Final Conformed Set.pdf PDF
Attachment 11 - 668-24-108 Drawings - Final Conformed Set.pdf PDF
Answers to Questions - 668-24-108.docx DOCX document
Attachment 6 - 668-24-108 Limitations on Subcontracting Certificate of Compliance.pdf PDF
Amendment 36C26027R0021 0002.docx DOCX document
Amendment 36C26027R0021 0001.docx DOCX document
Attachment 10 - 668-24-108 Site Visit Area Map (Revised).pdf PDF
Attachment 2.1 668-24-108 Drawings.pdf PDF
Attachment 2.2 668-24-108 Drawings.pdf PDF
Attachment 10 - 668-24-108 - Site Visit Area Map.pdf PDF
Attachment 9 668-24-108 Wage Determination.pdf PDF
Attachment 4 668-24-108 PCRA.pdf PDF
Solicitation 36C26027R0021.docx DOCX document
Attachment 5 668-24-108 DESIGN NARRATIVE.pdf PDF
Attachment 8 - 668-24-108 - Past Performance Questionnaire.docx DOCX document
Attachment 7 - 668-24-108 - Contractor Rules of Behavior.pdf PDF
Attachment 1 - 668-24-108 Construction SOW R2.docx DOCX document
Attachment 3 668-24-108 Bid Set Specifications.pdf PDF
Attachment 6 - 668-24-108 - Limitations on Subcontracting-Construction.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .