Attachment 8 - 663-21-100 - Division Price Schedule v1.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26026R0029
About this file
This is a Price Schedule Breakdown template for a fixed-price construction contract. The document is Attachment 8 to Solicitation 36C26026R0029 for Project 663-21-100, which involves upgrading the exterior security system at the Puget Sound VA Medical Center in Seattle, Washington. The price schedule is structured according to Construction Specification Institute (CSI) Division classifications and includes line items for General Requirements, Existing Conditions, Thermal and Moisture Protection, Finishes, Specialties, Electric, Communications, Electric Safety and Security, Earthwork, Exterior Improvements, and Transportation. The template also provides spaces for pricing of Insurance/Bonds, Taxes/Other Fees, O&M Manuals and Red Line Drawings, Overhead, Subcontract Mark-Up, and Profit.
The document serves as an instruction template for contractors to complete during proposal submission. All pricing is fixed-price, and contractors are responsible for ensuring accuracy of formulas and transposition of totals to the Price Summary. The template notes that field office overhead and general conditions are treated as a single cost category applied once to the contract and any potential changes. The contract line item price breakdown is for informational purposes only and does not constitute separate billable deliverables. This is a blank template document with all line items showing $0.00 values, requiring contractors to populate actual pricing during their proposal response.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| Solicitation 36C26026R0029 - Project 663-21-100 |
Upgrade Exterior Security Systems Puget Sound VA Medical Center - Seattle, WA
| Site & Infrastructure Subgroup | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 2 Existing Conditions (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 9 Finishes (furnish and install) | N/A | $0.00 |
| Division Item 10 Specialties (furnish and install) | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
| Division Item 27 Communications | N/A | $0.00 |
| Division Item 28 Electric Safety and Security | N/A | $0.00 |
| Division Item 31 Earthwork | N/A | $0.00 |
| Division Item 32 Exterior Improvements | N/A | $0.00 |
| Division Item 34 Transportation | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |
File details come from the government source that posted it. Updated .