Attachment 7 - 668-23-101 Divisional Price Breakout.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26026R0003
About this file
This is a Price Schedule Breakdown template for a fixed-price construction contract to construct a chiller plant and cooling tower facility at Mann-Grandstaff VA Medical Center in Spokane, Washington. The RFQ number is 36C26026R0003, and the project number is 668-23-101, with a period of performance of 630 days.
The template requires contractors to provide itemized pricing across 21 Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Thermal and Moisture Protection, Openings, Finishes, Specialties, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. Additionally, contractors must price Mobilization/Demobilization, Insurance/Bonds, Taxes/Other Fees, O&M Manuals and Red Line Drawings, and other line items not specifically requested. The template includes fields for applying overhead rates (as a percentage or daily rate), subcontract mark-up rates, and profit rates. The instructions clarify that the price schedule breakdown is for information purposes only and does not constitute separate billable deliverables, that field office overhead and general conditions are applied only once to the contract, and that the awardee is responsible for ensuring formula accuracy and proper transposition of totals to the Price Summary.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 36C26026R0003 |
Project Number / Title: 668-23-101 Construct Chiller Plant and Cooling Tower Project Location: Mann-Grandstaff VA Medical Center, Spokane, WA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 5 Metals | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 10 Specialties | ||
| Division 13 Special Construction | ||
| Division 21 Fire Suppression | ||
| Division 22 Plumbing | ||
| Division 23 HVAC | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements | ||
| Division 33 Utilities |
SubTotals N/A $0.00
Period of Performance 630 days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
File details come from the government source that posted it. Updated .