Attachment 7 - 668-23-101 Divisional Price Breakout.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1NB--CON-NRM-668-23-101 Construct Chiller Plant & Cooling Towers
Solicitation number
36C26026R0003
Issued by

About this file

This is a Price Schedule Breakdown template for a fixed-price construction contract to construct a chiller plant and cooling tower facility at Mann-Grandstaff VA Medical Center in Spokane, Washington. The RFQ number is 36C26026R0003, and the project number is 668-23-101, with a period of performance of 630 days.

The template requires contractors to provide itemized pricing across 21 Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Thermal and Moisture Protection, Openings, Finishes, Specialties, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. Additionally, contractors must price Mobilization/Demobilization, Insurance/Bonds, Taxes/Other Fees, O&M Manuals and Red Line Drawings, and other line items not specifically requested. The template includes fields for applying overhead rates (as a percentage or daily rate), subcontract mark-up rates, and profit rates. The instructions clarify that the price schedule breakdown is for information purposes only and does not constitute separate billable deliverables, that field office overhead and general conditions are applied only once to the contract, and that the awardee is responsible for ensuring formula accuracy and proper transposition of totals to the Price Summary.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ: 36C26026R0003

Project Number / Title: 668-23-101 Construct Chiller Plant and Cooling Tower Project Location: Mann-Grandstaff VA Medical Center, Spokane, WA

RatesBase Item
Price
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 7 Thermal and Moisture Protection
Division 8 Openings
Division 9 Finishes
Division 10 Specialties
Division 13 Special Construction
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Divison 26 Electrical
Division 27 Communications
Divison 28 Electronic Safety and Security
Division 31 Earthwork
Division 32 Exterior Improvements
Division 33 Utilities

SubTotals N/A $0.00

Period of Performance 630 days

Mobilization / Demobilization
Insurance / Bonds
Taxes / Other Fees (provide itemized list)
O&M Manuals and Red Line Drawings
OverheadRate _______%
Overhead (daily rate)Per Day $0.00
SubContract Mark-UpRate _______%
ProfitRate _______%
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00

File details come from the government source that posted it. Updated .