This file is a comprehensive set of construction documents for a federal project. Project 668-23-101 involves construction of a new 4,000 gross square foot chiller plant addition with cooling towers at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The Department of Veterans Affairs is the federal agency involved. The project is at 100% Construction Documents phase, issued May 23, 2025. The design team includes AESUS Design Group (Architecture and Sustainable Design), Thornton Tomasetti (Structural Engineering), SWS Engineering (Civil Engineering), and MES Group (Fire Protection and Special Systems). The facility addition will be constructed adjacent to an existing boiler plant with new equipment including chiller units, cooling towers, HVAC systems, electrical systems, plumbing, and fire protection systems. The building will be Type IIB construction with full sprinkler protection, consisting of mechanical equipment rooms (occupancy F1), electrical rooms, water treatment room, control room, and office space totaling approximately 12,013 square feet when combined with existing 8,500 square feet. The design incorporates new precast concrete panels matching existing exterior finishes, TPO roofing with R-38 rigid insulation, new structural steel framing and concrete foundations, and complete MEP (mechanical, electrical, plumbing) systems. All work must comply with VA Master Construction Specifications, 2021 International Building Code, accessibility standards, and NFPA codes. The contractor must coordinate with the Contracting Officer Representative (COR) for scheduling, equipment staging, roof work, and utility coordination. Work is restricted to regular daytime hours (8 AM-4:30 PM) unless approved otherwise.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:5
:4
P
M
G-001
COVER SHEET
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
APPROVED FOR CONSTRUCTION
Project No: 668-23-101
Spokane, WA 99205-6197
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
GENERAL NOTES
VICINITY MAP
THIS PROJECT IS LOCATED AT THE SPOKANE, WASHINGTON VA MEDICAL CENTER. THIS
PROJECT WILL BUILD A NEW 4000 GSF CHILLER PLANT AS AN ADDITION TO THE EXISTING
BOILER PLANT WITH TOWERS ON THE ROOF TO MEET FACILITY DEMAND.
THIS WORK SHALL INCLUDE ARCHITECTURAL, CIVIL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL.
DESCRIPTIONSYMBOL
CONSTRUCT CHILLER PLANT AND COOLING TOWER 668-23-101
Spokane, Washington VA Medical Center Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
Mann-Grandstaff Spokane Medical Center
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COVERED STORAGE FOR MATERIALS WILL NOT BE PROVIDED BY THE
CLIENT.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
BUILDING CODE:
2021 IBC - INTERNATIONAL BUILDING CODE
2018 IEBC - EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2021 IMC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2021 IPC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 NEC - NATIONAL ELECTRICAL CODE
THIS IS AN EXISTING 1 STORY BUILDING WITH A NEW CHILLER PLANT
ADDITION.
BUILDING OCCUPANCY:
IIB
CONSTRUCTION TYPE:
EXISTING = TYPE IIB
PROPOSED CHILLER PLANT ADDITION = TYPE IIB
-FIRE RESISTANCE IN ACCORDANCE WITH IBC TABLES 601 & 602
-ENTIRE BUILDING TO BE FULLY SPRINKLER THE ENTIRE BUILDING
-NO FIRE SEPARATION REQUIRED
-ENTIRE BUILDING TO RECEIVE FIRE ALARM SYSTEM UTILIZING A TOTAL
EVACUATION STRATEGY.
-ENTIRE BUILDING TO RECEIVE EMERGENCY LIGHTING.
BUILDING AREA:
ACTUAL
EXISTING 8,500 SF
ADDITION 3,992 SF
TOTAL 12,013 SF
BUILDING IS WITHIN 62,000 ALLOWABLE AREA FOR TYPE IIB (IBC 506.2)
BUILDING HEIGHT:
ACTUAL
HEIGHT (EXISTING) 32 FT
HEIGHT (ADDITION) 20 FT
STORIES 1
BUILDING IS WITHIN 75FT AND 3 STORIES ALLOWABLE AREA FOR TYPE IIB
(IBC 504.3 & 504.4)
OCCUPANCY LOAD FACTORS (IBC TABLE 1004.5):
F1 - MECHANICAL EQUIPMENT ROOM = 1:300
MINIMUM NUMBER OF EXITS (TABLE 1006.3.2)
OCCUPANT LOAD PER STORY MIN EXITS PER STORY
1:300 1 REQ'D, 2 PROVIDED
EXIT ACCESS TRAVEL DISTANCE (TABLE 1017.2)
F1 OCCUPANCY WITH SPRINKLERS = 250 FEET
DEAD END CORRIDORS (IBC 1020.4)
F1 OCCUPANCY WITH SPRINKLERS = 250 FEET
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
NFPA 70
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Chad Spencer (cspencer@aesusdesign.com)
480-454-2861
PROJECT AREA
Structural Engineers
225 Broadway, Suite 1250, San Diego, CA 92101
Thorton Tomasetti
Ross Cussen (rcussen@thortontomasetti.com
619-550-5900
Civil Engineers
4001 N. 3rd St, #165
Phoenix, Arizona 85012
SWS Engineering
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
G-001 COVER SHEET
LS-101 LIFE SAFETY PLAN
ARCHITECTURAL
AS-100 SITE PLAN / SCOPE OF WORK
AE-101 LEVEL 1 FLOOR PLAN
AE-102 ROOF PLANS
AE-200 LEVEL 1 ENLARGED FLOOR PLAN
AE-201 ENLARGED REFLECTED CEILING PLAN
AE-401 BUILDING ELEVATIONS
AE-402 BUILDING SECTIONS
AE-500 DOOR, SAFETY GLAZING AND LOUVER INFORMATION
AE-501 DOOR & WINDOW DETAILS
AE-502 WALL TYPES & DETAILS
AE-503 SINGLE PLY ROOFING DETAILS
CIVIL
C-100 EXISTING CONDITIONS - SITE PLAN
C-110 DEMOLITION PLAN
C-120 GRADING AND UTILITY PLAN
STRUCTURAL
S0.00 COVER SHEET
S0.01 GENERAL STRUCTURAL NOTES
S0.02 GENERAL STRUCTURAL NOTES
S0.03 GENERAL STRUCTURAL NOTES
S0.04 LEGEND AND ABBREVIATIONS
S0.05 SPECIAL INSPECTIONS AND STRUCTURAL TESTING
S0.10 LOADING PLANS
S0.20 MODEL VIEWS
S1.00 OVERALL FRAMING PLAN
S2.00 FOUNDATION ENLARGED FRAMING PLAN
S2.01 GOUND LEVEL ENLARGED FRAMING PLAN
S2.02 ROOF LEVEL ENLARGED FRAMING PLAN
S2.03 HIGH ROOF DUNNAGE ENLARGED FRAMING PLAN
S4.00 OVERAL BUILDING SECTIONS
S4.10 STRUCTURAL WALL ELEVATIONS
S4.11 STRUCTURAL WALL ELEVATIONS
S4.20 SECTIONS AND DETAILS
S4.21 SECTIONS AND DETAILS
S5.00 TYPICAL FOUNDATION DETAILS
S5.01 TYPICALSLAB ON GRADE DETAILS
S5.10 TYPICAL STEEL BEAM DETAILS
S5.11 TYPICAL STEEL BEAM DETAILS
S5.12 TYPICAL STEEL BEAM DETAILS
S5.20 TYPICAL METAL DECK DETAILS
S5.21 TYPICAL METAL DECK DETAILS
S5.22 TYPICAL METAL DECK DETAILS
S5.30 TYPICAL PRECAST PANEL DETAILS
S5.31 TYPICAL PRECAST PANEL DETAILS
S5.32 TYPICAL PRECAST PANEL DETAILS
S5.40 TYPICAL STEEL COLUMN DETAIL
S5.50 TYPICAL NON-BEARING MASONRY DETAILS
S5.51 TYPICAL NON-BEARING MASONRY DETAILS
Fire Protection Engineers and Special Systems
550 North Reo Street
Tampa, FL 33609
MES Group
813-289-4700
Revisions: Date:
ISSUED SHEETS
Sheet Number Sheet Name
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
M-201 MECHANICAL PLAN
M-202 MECHANICAL ROOF PLAN
M-301 MECHANICAL HVAC PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-801 MECHANICAL CONTROLS
M-802 MECHANICAL CONTROLS
M-803 MECHANICAL CONTROLS
PLUMBING
P-001 PLUMBING LEGEND AND ABBREVIATIONS
P-201 PLUMBING PLAN
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
ELECTRICAL
EP-000 SYMBOLS AND ABBREVIATIONS
ES-101 ELECTRICAL SITE PLAN
EP-101 ELECTRICAL POWER PLAN - LEVEL 1
EP-102 ELECTRICAL POWER PLAN - LEVEL 2
EP-301 GROUNDING & LIGHTNING PROTECTION PLAN
EP-401 ELECTRICAL DETAILS (PANELS AND TRANSFORMERS)
EP-402 ELECTRICAL DETAILS
EP-403 LIGHTNING PROTECTION DETAILS
EP-404 GROUNDING DETAILS
EP-405 TYPICAL MOUNTING HEIGHT DETAILS
EP-406 TYPICAL LABELING DETAILS
EP-407 TYPICAL LABELING & SITE DETAILS
EP-601 ELECTRICAL ONE-LINE DIAGRAM - MV
EP-602 ELECTRICAL ONE-LINE DIAGRAM
EP-701 ELECTRICAL PANEL SCHEDULES
EL-101 ELECTRICAL LIGHTING PLAN - LEVEL 1
EL-151 PHOTOMETRIC PLANS
EL-401 LIGHTING DETAILS
EL-402 LIGHTING COMCHECK
LOW VOLTAGE
EY-000 SPECIAL SYSTEMS LEGEND, NOTES & ABBREVIATIONS
EY-101 SPECIAL SYSTEMS AND TELECOM FLOOR PLAN
EY-501 SPECIAL SYSTEMS DETAILS
FIRE ALARM
FA-000 FIRE ALARM LEGEND, NOTES & ABBREVIATIONS
FA-101 FIRE ALARM FLOOR PLAN
FIRE PROTECTION
F-000 FIRE PROTECTION LEGEND, NOTES & ABBREVIATIONS
F-101 FIRE PROTECTION FIRST FLOOR PLAN
05/23/2025
A
500 B 100
EXIT SYMBOL CODES
OCCUPANCY
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
AREA
# OF PEOPLE USING EXIT
EXIT CAPACITY
EXIT FROM FLOOR
REQUIRED FIRE SEPARATIONS KEY
MINIMUM 3 HOUR FIRE RATED
SEPARATION REQUIRED
MINMUM 2 HOUR FIRE RATED
SEPARATION REQUIRED
A
D
C
B
C.3
C.4
B.3
A.6
8.48.1
ELECTRICAL
ROOM
CHILLER PLANT
ELECTRICAL
ROOM
ELECTRICAL
ROOM
ELECTRICAL
ROOM
OFFICE
350 1:300 1
F1
192 1:150 1
B
334 1:300 1
F1
202 1:300 1
F1
223 1:300 1
F1
2375 1:300 8
F1
EXISTING 14" PRECAST
CONCRETE WALL PROVIDES
AN EFFECTIVE FIRE RATED
ASSEMBLY OF 3 HOURS OR
MORE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:4
P
M
LS-101
LIFE SAFETY PLAN
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
LIFE SAFETY LEGEND
NFPA 2012
40.1.2.1.2(2) Special Purpose Industrial Occupancy #2 “Industrial occupancies that are characterized by relatively low density of employees, with much of the area occupied by machinery or equipment.”
(office and lockers are not B occupancy (business) per NFPA 6.1.11.1 definition: “an occupancy used for transaction of business other than mercantile”) (2 hr separation is required between B & industrial)
40.1.6 Minimum Construction Requirements: “no requirements”
ADA
F203.6 Machinery Spaces. Spaces frequented only by service personnel for maintenance, repair, or occasional monitoring of equipment shall not be required to comply with these requirements or to be on an accessible route. Machinery spaces include, but are not limited to, elevator pits or elevator penthouses; mechanical, electrical or communications equipment rooms; piping or equipment catwalks; water or sewage treatment pump rooms and stations; electric substations and transformer vaults; and highway and tunnel utility facilities.
IBC
Building will be sprinklered as a VA request Occupancy designation:
To be F1 306.2 Moderate-hazard factory industrial; B for office as accessory area.
CONSTRUCTION TYPE
The gross addition is 3992 sf. According to TABLE 503 the building is allowed to be Type VB construction, for up to 8500 sf. We are providing type IIB construction.
Table 503
Table 503
508.2.1 Area limitations.
Aggregate accessory occupancies shall not occupy more than 10 percent of the building area of the story in which they are located and shall not exceed the tabular values in Table 503, without building area increases in accordance with Section 506 for such accessory occupancies. 508.2.4 No separation is required between accessory occupancies and the main occupancy.
TABLE 508.4 No separation required between B and F-1 There are no fire rating requirements per Table 601 for Type V-B construction
Table 1004.1.2 Floor Area Allowances. Mechanical equipment rooms: 300 SF/occ. (addition: 3992sf/300= 14) Table 1006.2.1 Maximum occupants per area for one exit: (F occupancy) 49
Table 1016.2 Travel distance: F1 occupancy (fully sprinklered) 250’
NEC/NFPA 70
Article 110.31 Vaults operating at over 600 volts to have walls and roof with a minimum fore rating of 3 hours. Exception A allows 1-hour rated construction when the vault is sprinkled.
SCALE: 1/4" = 1'-0"1 LEVEL 1 - L-SAFETY PLAN
FH
FH
CONCRETE
WASH OUT
C O
C O
C O
D W
C O
DW
DW
DW
DW
DW
CBCB
CB
CB
CB
COCO
CO
CO
CO
DW
CO
CO
CO
SSMH
CO
POTENTIAL
FUTURE DATA
CENTER
FFE= 1909.5±
U G
D
IE
S E L
T A N K
U G
D
IE
S E L
T A N K
PK
TBM CHISELED
BOX IN NORTH
CORNER OF
CONCRETE
ELEVATION =1912.62
BP BP
BASKETBALL COURT
BP
BP
BPBP
BP
BP
BP
BP
BP BP
BP
WORKOUT AREA
UTILITY
LOCATES NOT
PERFORMED IN
THIS AREA
DURING DESIGN
BUILDING 2
BUILDING 16
BUILDING 14
POLE BUILDING
WELLNESS CENTER
BUILDING 40
SHED
BUILDING 3
BUILD 37
DN
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH CIVIL PLANS.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
FLOOR PLAN LEGEND
SCOPE OF WORK
SITE PLAN GENERAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES
THAT ARE NOT MARKED FOR REMOVAL.
2. CONTRACTOR SHALL INSTALL TEMPORARY 6' TALL CHAIN LINK SECURITY
FENCING TO SECURE CONSTRUCTION SITE. CONTRACTOR SHALL INSTALL
GATES TO ALLOW WORKING ACCESS FOR EQUIPMENT
AND PEOPLE.
3. CONTRACTOR SHALL SUPPLY TRAFFIC CONTROL IN COMPLIANCE WITH
ALL MUTCD REGULATIONS. TRAFFIC CONTROL SHALL CONSIST OF AT LEAST
TYPE II BARRICADES WITH LIGHTS ON RESTRICTED
LANES OF TRAFFIC AND AT THE EDGE OF PAVEMENT WITH TEMPORARY
ACCESS OVER THE ROCKED IN LANE. TRAFFIC CONES MAY BE NEEDED ON
A TEMPORARY BASIS TO REDIRECT.
THIS PROJECT WILL BUILD A NEW 4000 GSF CHILLER PLANT AS AN ADDITION TO
THE EXISTING BOILER PLANT WITH TOWERS ON THE ROOF TO MEET FACILITY
DEMAND. CURRENTLY ALL THREE CHILLERS MUST OPERATE TO MEET PEAK
DEMAND LEAVING THE CAMPUS WITHOUT N+1. THE EXISTING STATE OF THE
FACILITY IS APPROXIMATELY 400 TONS SHORT FOR CHILLED WATER AND WITH
THE CONSTRUCTION OF APPROXIMATELY 40,000SF OF EXPANSION PLANNED,
THE FACILITY WILL BE AT RISK OF INSUFFICIENT CHILLED WATER SUPPLY TO
MEET THE PLANNED/FUNDED FUTURE STATE NEED. THE NEW PLANT WILL BE
BUILT TO MISSION CRITICAL STANDARDS. THE NEW PLANT WILL INCLUDE NEW
CONTROLS AND EVAC SYSTEM ALONG WITH ANY OTHER REQUIREMENTS. THE
NEW LOCATION NEXT TO A NEWLY BUILT BOILER PLANT ALREADY HAS CHILLED
WATER LINES TO IT. A CAMPUS WIDE COOLING CALCULATION WILL BE DONE
WITH ENOUGH REDUNDANCY FOR FUTURE EXPANSION. DESIGNS WILL BE
PROVIDED WITHIN THE CONSTRUCTION FUNDING CONSTRAINTS/LIMITATIONS.
SCOPE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:4
P
M
AS-100
SITE PLAN / SCOPE OF WORK
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
1/32" = 1'-0"1 SITE PLAN
EXISTING SECURITY
FENCE
AREA OF WORK
UP
D
83 4 5 6 7
C
B
NORTH
59'-0"
EXISTING
BUILDING
AE-401
AE-401
EXISTING NEW
OFFICE
CHILLER PLANT
BOILER ROOM
SWITCHGEAR
ELECTRICAL
ROOM
WATER
TREATMENT
CHEMICAL
PARTS
WELDING/WORKROOM
TOOLS/WORKROOM
TELECOM
RESTROOM
SHOWER ROOM
RESTROOM MEN
Room
CONTROL ROOM
ELECTRICAL
ROOM
ELECTRICAL
ROOM
AE-402
AE-402
AE-401
R
ELECTRICAL
ROOM
ELECTRICAL
ROOM
C.3
C.4
B.3
A.6
8.48.1
1'-10" 23'-2" 34'-0"
AE-200
A. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE. LARGER SCALE
DRAWINGS SHALL HAVE PRECEDENCE OVER SMALLER SCALE
DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT
PORTION OF THE WORK.
B. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS
C. PRIOR TO START OF ANY WORK, THE CONTRACTOR IS REQUIRED
TO VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING
CONDITIONS MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE
DRAWINGS. THE CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS, DIMENSIONS, AND MATERIALS IN THE FIELD AND
GENERATE A LIST OF DISCREPANCIES IN WRITING AND REPORT
TO THE OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
D. THE CONTRACTOR SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH THE OWNER.
E. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY THE OWNER.
F. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING, ELECTRICAL, AND FIRE PROTECTION.
G. PATCH ALL AREAS OF FIREPROOFING WHERE REMOVED FOR
INSTALLATION OF NEW WORK.
H. REMOVE (E) GYP. BD. AS NECESSARY TO INSTALL ALL DUCT,
PIPING, CONDUIT AND ACCESSORIES. REINSTALL GYP. BD. FINISH
TO MATCH EXIST. CONDITIONS AND TO VA'S ACCEPTANCE.
I. PROVIDE FIRESTOPPING AND/OR SEALANT AT ALL UNPROTECTED
PENETRATIONS AND OPENINGS IN EXISTING RATED PARTITIONS
AND FLOOR SLABS EXPOSED DURING THE CONSTRUCTION
PROJECT THAT ARE WITHIN THE PROJECT AREA.
J. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK
WITH THE OWNER AND EXISTING WARRANTY INFORMATION.
K. PRIOR TO SAW CUTTING AND OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL V-RAY USING "A MODERN DETECTION
SYSTEM" TO LOCATE REINFORCING AND OBSTRUCTIONS IN THE
CONCRETE.
L. IF ASBESTOS CONTAINING MATERIALS ARE SUSPECTED, STOP ALL
WORK IN THE AREA AND REPORT TO OWNER.
M. PROTECT ALL EXISTING CONDITIONS & EQUIPMENT DURING
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
PROTECTING ANY OPENINGS AND RESPONSIBLE FOR ANY
DAMAGE THAT MAY RESULT FROM SUCH OPENINGS BEING LEFT
UNPROTECTED OR THOSE THAT HAVE OCCURRED AS A RESULT
OF PROTECTING THE OPENINGS.
O. THE GC SHALL NOT SCALE PLANS.
FLOOR PLAN GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:4
P
M
AE-101
LEVEL 1 FLOOR PLAN
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
SCALE: 1/8" = 1'-0"
LEVEL 1 - FLOOR PLAN
Revisions: Date:
DN
DN
UP
A
D
C
B
NORTH
1/4" / 1 '-0"
1/4" / 1'-0"
EXISTING NEW
AE-402
AE-402
/4
S L
O P
E
/4
S L
O P
E
/4
S L
O P
E
/4
S L
O P
E
C.3
C.4
B.3
A.6
8.48.1
21'-1" 22'-2 1/2" 15'-8 1/2"
/1
/4
/1
/1
/2
/1
/1
/4
/1
/4
/1
/1
/1
/8
16'-7 11/16" 4'-5 5/16" 4'-5 1/4" 11'-3 1/4"
AE-502
ROOF PLAN GENERAL NOTES
1. ROOF TYPE: EXISTING TO REMAIN / NEW TPO
2. THE GC IS RESPONSIBLE FOR ANY DAMAGE DONE TO THE
EXISTING ROOF. AND WILL BE RESPONSIBLE FOR ANY AND ALL
REPAIRS.
3. ALL ROOF TOP MECHANICAL, ELECTRICAL AND/OR PLUMBING
EQUIPMENT SHOWN FOR INFORMATION ONLY. REFERENCE
MECHANICAL, ELECTRICAL AND PLUMBING DOCUMENTS AND
SPECIFICATIONS FOR SPECIFIC DESIGN INFORMATION.
4. PROVIDE WALKWAY PROTECTION TO MAJOR MECHANICAL,
ELECTRICAL AND PLUMBING EQUIPMENT AS REQUIRED TO
PROVIDE SERVICE ACCESS. WALKWAY PROTECTION IS
INDICATED AS A GENERAL LAYOUT AND MAY NOT SHOW ALL FINAL
LOCATIONS OF ALL EQUIPMENT.
5. REFERENCE DEMOLITION PLANS AND SECTIONS.
6. PATCH AND REPAIR EXISTING ROOFS DAMAGED DURING
CONSTRUCTION.
7. ANY ROOF MODIFICATIONS REQUIRED TO BE COORDINATED WITH
VA AND EXISTING WARRANTIES.
A
D
C
B
AE-402
AE-402
NORTH
/8
EXISTING NEW
/4
S L
O P
E
/4
S L
O P
E
HIGH POINT
/4
S L
O P
E
/4
S L
O P
E
ROOF CRICKET, MIN.
SLOPE: 1/4" PER FT.
(TYP)
C.3
C.4
B.3
A.6
8.48.1
21'-1" 22'-2 1/2" 15'-8 1/2"
/1
/1
/4
/1
/2
/1
/1
/4
/1
/4
AE-503
AE-503
AE-502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-102
ROOF PLANS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
1/8" = 1'-0"1 ROOF EQUIPMENT PLAN
Revisions: Date:
KEYNOTES
6 NEW COOLING TOWER, SEE MECHANICAL FOR ADDITIONAL INFORMATION.
7 NEW CANOPY, GUTTERS, AND DOWNSPOUTS.
8 EXISTING ROOF AND PARAPETS TO REMAIN
9 NEW TPO ROOF
13 NEW CONT. PARAPET CAP TO MATCH EXISTING BUILDING FINISH AND COLOR
14 ROOF MOUNTED CATWALK, SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
15 EXISTING STAIRS TO REMAIN.
16 EXISTING ROOF DRAINS TO REMAIN, TYPICAL.
17 ROOF MOUNTED STAIR SUPPORT. PROVIDE PREMANUFACTURED SUPPORTS AS
REQUIRED. PHP OR EQUIVALENT.
18 FUTURE HVAC EQUIPMENT LOCATION. SEE MECHANICAL FOR ADDITIONAL
INFORMATION.
19 2" EXPANSION JOINT.
22 PROVIDE AND INSTALL PRE-MANUFACTURED STAIR, LANDING, AND GUARDRAILS
(PHP OR EQUIVALENT) WITH ISOLATION PADS. LAYOUT ISOLATION PADS
ACCORDING TO THE FOOTPRINT OF STAIRS AND LANDING. GC TO CONFIRM FIELD
CONDITIONS AND PROVIDE SITE SPECIFIC SHOP DRAWINGS FOR REVIEW.
29 PRIMARY AND SECONDARY ROOF DRAIN
30 STRUCTURAL STEEL COLUMN AND SURROUND, TYPICAL. PROVIDE CLOSER PLATE
AND FLASHING AT COLUMN.
1/8" = 1'-0"2 ROOF PLAN
D
C
B
AE-402
AE-402
AE-401
C.3
C.4
B.3
A.6
8.48.1
NORTH
59'-0"
EXISTING
BUILDING
AE-401
AE-401
EXISTING NEW
OFFICE
CHILLER PLANT
SHOWER ROOM
RESTROOM MEN
Room
CONTROL ROOM
ELECTRICAL
ROOM
ELECTRICAL
ROOM
A
B
18A
B
A
16C
16D
16E
20C
R
R8
R
R8
ELECTRICAL
ROOM
ELECTRICAL
ROOM
18B
19A
B
16F
1'-10" 23'-2" 34'-0"
59'-0"
22'-7 5/8" 36'-4 3/8"
18'-5" 4'-2 5/8"
4'-4" 6'-7"
10'-2" 13'-0"
11'-9 5/8" 11'-4 3/8" 6'-7 5/8" 27'-4 3/8"
/2
/2
/2
/2
10 10
20A
3'-0" 9'-3"
17B
AE-503
AE-503
AE-502
TYP
17A
AE-502
AE-502
AE-502
AE-502
36 37
R8
A. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE. LARGER SCALE
DRAWINGS SHALL HAVE PRECEDENCE OVER SMALLER SCALE
DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT
PORTION OF THE WORK.
B. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS
C. PRIOR TO START OF ANY WORK, THE CONTRACTOR IS REQUIRED
TO VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING
CONDITIONS MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE
DRAWINGS. THE CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS, DIMENSIONS, AND MATERIALS IN THE FIELD AND
GENERATE A LIST OF DISCREPANCIES IN WRITING AND REPORT
TO THE OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
D. THE CONTRACTOR SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH THE OWNER.
E. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY THE OWNER.
F. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING, ELECTRICAL, AND FIRE PROTECTION.
G. PATCH ALL AREAS OF FIREPROOFING WHERE REMOVED FOR
INSTALLATION OF NEW WORK.
H. REMOVE (E) GYP. BD. AS NECESSARY TO INSTALL ALL DUCT,
PIPING, CONDUIT AND ACCESSORIES. REINSTALL GYP. BD. FINISH
TO MATCH EXIST. CONDITIONS AND TO VA'S ACCEPTANCE.
I. PROVIDE FIRESTOPPING AND/OR SEALANT AT ALL UNPROTECTED
PENETRATIONS AND OPENINGS IN EXISTING RATED PARTITIONS
AND FLOOR SLABS EXPOSED DURING THE CONSTRUCTION
PROJECT THAT ARE WITHIN THE PROJECT AREA.
J. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK
WITH THE OWNER AND EXISTING WARRANTY INFORMATION.
K. PRIOR TO SAW CUTTING AND OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL V-RAY USING "A MODERN DETECTION
SYSTEM" TO LOCATE REINFORCING AND OBSTRUCTIONS IN THE
CONCRETE.
L. IF ASBESTOS CONTAINING MATERIALS ARE SUSPECTED, STOP ALL
WORK IN THE AREA AND REPORT TO OWNER.
M. PROTECT ALL EXISTING CONDITIONS & EQUIPMENT DURING
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
PROTECTING ANY OPENINGS AND RESPONSIBLE FOR ANY
DAMAGE THAT MAY RESULT FROM SUCH OPENINGS BEING LEFT
UNPROTECTED OR THOSE THAT HAVE OCCURRED AS A RESULT
OF PROTECTING THE OPENINGS.
O. THE GC SHALL NOT SCALE PLANS.
FLOOR PLAN GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-200
LEVEL 1 ENLARGED FLOOR PLAN
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
SCALE: 1/4" = 1'-0"
LEVEL 1 - FLOOR PLAN
KEYNOTES
1 NEW 3'X7' SWING DOOR IN EXISTING BUILDING WALL. SEE DOOR SCHEDULE FOR
ADDITIONAL INFORMATION.
2 NEW HVAC EQUIPMENT, TYPICAL, AND 6" CONCRETE PAD, SEE MECHANICAL FOR
ADDITIONAL INFORMATION.
3 NEW 8'X10' ROLL UP DOOR. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
4 NEW 3'X7' SWING DOOR. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
5 PRE-CAST CONCRETE PANEL TO MATCH EXISTING BUILDING TEXTURE AND COLOR.
10 NEW ELECTRICAL EQUIPMENT AND 6" CONCRETE PAD, SEE ELECTRICAL FOR
ADDITIONAL INFORMATION.
11 OUTLINE OF CANOPY ABOVE
18 FUTURE HVAC EQUIPMENT LOCATION. SEE MECHANICAL FOR ADDITIONAL
INFORMATION.
19 2" EXPANSION JOINT.
21 NEW CONCRETE SLAB OVER 4" GRAVEL BASE AND VAPOR BARRIER WITH EPOXY
FINISH TYPICAL.
27 2.5 INCH FURRING STUDS AT 24" O.C WITH 5/8 GYPSUM WALL BOARD, TYPICAL.
35 COMPRESSIBLE BACKER ROD AND SEALANT TO FILL EXPANSION JOINT BETWEEN
THE EXSITING STRUCTURE AND THE NEW CONCRETE SLAB.
36 SCBA BREATHING APPARATUS, SEE MECHANICAL.
37 KEYED BOX W/BUTTON TO DISABLE REFMON STROBE & ALARM, SEE MECHANICAL.
RCP GENERAL NOTES
1. ALL CEILINGS SHALL BE 8' - 0" ABOVE FINISHED FLOOR, UNLESS NOTED
OTHERWISE. (COORDINATE WITH OWNER-FURNISHED VENDOR DRAWINGS
AND EQUIPMENT.
2. IN THE CASE OF MINOR DISCREPANCIES BETWEEN MEP AND
ARCHITECTURAL DOCUMENTS IN THE LOCATION OF CEILING MOUNTED
COMPONENTS, THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL
GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT SHALL
BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR TO
PROCEEDING WITH THE WORK.
3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR MOUNTING
LOCATIONS OF ITEMS WHERE NO CEILING IS REQUIRED OR INDICATED.
4. LIGHTS, DIFFUSERS, EXIT SIGNS, SMOKE DETECTORS, SPEAKERS, STROBES
AND MISCELLANEOUS DEVICES SHALL BE CENTERED IN THE CEILING TILE IN
WHICH THEY OCCUR, UNLESS NOTED OTHERWISE.
5. ALL CORRIDOR SPRINKLER HEADS SHALL BE ALIGNED IN THE SAME
LOCATION PARALLEL TO THE WALL WITHIN EACH SPECIFIC CEILING
CONSTRUCTION. ARCHITECTURALLY SIGNIFICANT SPRINKLER HEAD
LOCATIONS MAY BE SHOWN ON REFLECTED CEILING PLAN FOR DESIGN
INTENT ONLY.
6. ACCESS DOOR LOCATIONS ARE INDICATED ON RCP'S ONLY WHERE
ARCHITECTURALLY SIGNIFICANT. REFERENCE SPECIFICATIONS AND MEP
DRAWINGS FOR OTHER ACCESS DOOR LOCATIONS. ACCESS PANELS ARE
REQUIRED IN GYP BD CEILINGS ADJACENT TO BUT NOT LIMITED TO VAV
BOXES AND CEILING MOUNTED BOOMS.
7. EXIT SIGNS ARE SHOWN ON REFLECTED CEILING PLAN ONLY WHERE
LOCATION IS ARCHITECTURAL SIGNIFICANT. CONTRACTOR TO VERIFY IN
FIELD THAT ALL EXIT SIGNS ARE VISIBLE AND NOTIFY COR IF ADDITIONAL
EXIT SIGNS NOT SHOWN ON PLAN ARE NEEDED.
8. ALL LOW VOLTAGE ELEMENTS SHALL BE REMOVED FOR THE CEILING
REPLACEMENT, TYPICAL. ALL TRIM AND FIXTURES TO BE REPLACED WITH
NEW.
CEILING LEGEND
SUPPLY AIR
RETURN AIR
2X2 ACOUSTIC CEILING TILE
EXIT SIGNS
SPRINKLER, REFER TO FIRE
SPRINKLER PLANS FOR
ADDITIONAL INFORMATION
2X2 LIGHT
EXP EXPOSED CEILING SPACE
SUSPENDED LIGHT FIXTURE
A
D
C
B
CHILLER PLANT
ELECTRICAL
ROOM
ELECTRICAL
ROOM
OFFICE
+ 8'-0"
EXP
EXP
EXP
C.3
C.4
B.3
A.6
8.48.1
ELECTRICAL
ROOM
ELECTRICAL
ROOM
EXP
EXP
EXP
1/4" = 1'-0"1 LEVEL 1 - REFLECTED CEILING PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-201
ENLARGED REFLECTED CEILING
PLAN
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 JS XL/MP
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
LEVEL 1
100'-0"
ROOF
116'-2"
Level 1 0' - 0"
Mezzanine 12' - 0"
Level 2 16' - 2"
High Roof 28' - 4 1/2"
EXISTING NEW
AE-402
A
22 14
8.48.1
TOP OF BEAMS @
PLATFORM
121'-5"
AE-502
AE-502
AE-502
L1-1
EQ EQ
36 37
38 39
LEVEL 1
100'-0"
ROOF
116'-2"
AD C B
EXISTING BUILDING
AE-402
18 6 6 6
E
D
C
C.3C.4 B.3 A.6
F
TOP OF BEAMS @
PLATFORM
121'-5"
AE-502
AE-502
LEVEL 1
100'-0"
ROOF
116'-2"
8 79
AE-402
EXISTINGNEW
B
A
8.4 8.1
TOP OF BEAMS @
PLATFORM
121'-5"
AE-502
AE-502
AE-502
L1-2
EQ EQ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-401
BUILDING ELEVATIONS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
1/8" = 1'-0"1 EAST ELEVATION
1/8" = 1'-0"2 NORTH ELEVATION
Revisions: Date:
1/8" = 1'-0"3 WEST ELEVATION
KEYNOTES
3 NEW 8'X10' ROLL UP DOOR. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
5 PRE-CAST CONCRETE PANEL TO MATCH EXISTING BUILDING TEXTURE AND COLOR.
6 NEW COOLING TOWER, SEE MECHANICAL FOR ADDITIONAL INFORMATION.
7 NEW CANOPY, GUTTERS, AND DOWNSPOUTS.
12 PANEL JOINT, TYP.
13 NEW CONT. PARAPET CAP TO MATCH EXISTING BUILDING FINISH AND COLOR
14 ROOF MOUNTED CATWALK, SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
18 FUTURE HVAC EQUIPMENT LOCATION. SEE MECHANICAL FOR ADDITIONAL
INFORMATION.
19 2" EXPANSION JOINT.
22 PROVIDE AND INSTALL PRE-MANUFACTURED STAIR, LANDING, AND GUARDRAILS
(PHP OR EQUIVALENT) WITH ISOLATION PADS. LAYOUT ISOLATION PADS
ACCORDING TO THE FOOTPRINT OF STAIRS AND LANDING. GC TO CONFIRM FIELD
CONDITIONS AND PROVIDE SITE SPECIFIC SHOP DRAWINGS FOR REVIEW.
23 NEW 36" HIGH GUARDRAIL, PAINTED.
36 SCBA BREATHING APPARATUS, SEE MECHANICAL.
37 KEYED BOX W/BUTTON TO DISABLE REFMON STROBE & ALARM, SEE MECHANICAL.
38 SPEAKER, SEE MECHANICAL.
39 STROBE, SEE MECHANICAL.
T ectonic Cop yright 2007
T.O. EQUIPMENT
44'-2"
T ectonic Copyrig ht 2007
LEVEL 1
100'-0"
ROOF
116'-2"
A DCB
66 6 18
CHILLER PLANT
2 2
14 14
AE-402
AE-402
MIRR./SIM.
C.3 C.4B.3A.6
TOP OF BEAMS @
PLATFORM
121'-5"
LEVEL 1
100'-0"
ROOF
116'-2"
7 9
CHILLER PLANT
EXISTING
BUILDING
ELECTRICAL
ROOM
EXISTING NEW
EXISTING
BUILDING
STACK
AE-402
AE-402
8.48.1
TOP OF BEAMS @
PLATFORM
121'-5"
LEVEL 1
100'-0"
ROOF
116'-2"
Mezzanine 112'-0"
MEMEBRANE
ROOFING WITH R-38
RIGID INSULATION ON
COMPOSITE METAL
DECK, SEE
STRUCTURAL
INSULATED CONCRETE
PANELS PER
STRUCTURAL,
EXTERIOR FINISH TO
MATCH EXISTING
ADJACENT STRUCTURE
FLOOR SLAB PER
STRUCTURAL
WATER PROOFING
SUBGRADE
COILING OVERHEAD
DOOR ASSEMBLY
TOP OF BEAMS @
PLATFORM
121'-5"
MIRR. IMAGE
AE-503
AE-503
MIRR. SIM
MIRR. SIM
AE-502
LEVEL 1
100'-0"
ROOF
116'-2"
T.O.F 98'-0"
Mezzanine 112'-0"
MEMEBRANE ROOFING WITH
R-38 RIGID INSULATION ON
COMPOSITE METAL DECK,
SEE STRUCTURAL
WALL OF EXISTING BUILDING
FLOOR SLAB PER
STRUCTURAL
8.1
TOP OF BEAMS @
PLATFORM
121'-5"
AE-503
LEVEL 1
100'-0"
ROOF
116'-2"
D
Mezzanine 112'-0"
WATER PROOFING
CURB PER CIVIL
SUBGRADE
RIVERROCK PER CIVIL
INSULATED CONCRETE
PANELS PER
STRUCTURAL, EXTERIOR
FINISH TO MATCH
EXISTING ADJACENT
STRUCTURE
FLOOR SLAB PER
STRUCTURAL
MEMEBRANE ROOFING
WITH R-38 RIGID
INSULATION ON
COMPOSITE METAL DECK,
SEE STRUCTURAL
STEEL FRAMING PER
STRUCTURAL
MIRR. IMAGE
AE-503
AE-503
AE-502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-402
BUILDING SECTIONS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 AESUS AESUS
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
1/8" = 1'-0"1 BUILDING SECTION
1/8" = 1'-0"2 BUILDING SECTION
KEYNOTES
2 NEW HVAC EQUIPMENT, TYPICAL, AND 6" CONCRETE PAD, SEE MECHANICAL FOR
ADDITIONAL INFORMATION.
3 NEW 8'X10' ROLL UP DOOR. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
6 NEW COOLING TOWER, SEE MECHANICAL FOR ADDITIONAL INFORMATION.
7 NEW CANOPY, GUTTERS, AND DOWNSPOUTS.
9 NEW TPO ROOF
10 NEW ELECTRICAL EQUIPMENT AND 6" CONCRETE PAD, SEE ELECTRICAL FOR
ADDITIONAL INFORMATION.
13 NEW CONT. PARAPET CAP TO MATCH EXISTING BUILDING FINISH AND COLOR
14 ROOF MOUNTED CATWALK, SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
18 FUTURE HVAC EQUIPMENT LOCATION. SEE MECHANICAL FOR ADDITIONAL
INFORMATION.
19 2" EXPANSION JOINT.
20 NEW STRUCTURAL COLUMN, TYPICAL, SEE STRUCTURAL FOR ADDITIONAL INFO.
21 NEW CONCRETE SLAB OVER 4" GRAVEL BASE AND VAPOR BARRIER WITH EPOXY
FINISH TYPICAL.
24 EXISING FOOTER/FOUNDATION, TYPICAL.
25 NEW FOOTER/FOUNDATION, TYPICAL. SEE STRUCTURAL.
SCALE: 1/2" = 1'-0"4 Section 18 - Callout 1 SCALE: 1/2" = 1'-0"5 Section 18 - Callout 2
SCALE: 1/2" = 1'-0"3 BUILDING SECTION - Callout 1
MIRR. SIM.
MIRR. SIM.
2" 5/8"
P A
R T
N
S C
H E
D
/2
/1
/1
V A
R
IE
S
APPLIED STOP
AT GLAZING
TYPICAL - HOLLOW METAL
DOUBLE EGRESS
CASE OPENING
MUNTIN
BORROWED LITE
2 5/8"
P A
R T
N
S C
H E
D
/2
1 3/8" 5/8"5/8"
E Q
E Q
/1
P A
R T
N
S C
H E
D
/2 " 2" 2" 1/2"
APPLIED
STOP AT
GLAZING
2" 5/8"
P A
R T
N
S C
H E
D
/2
APPLIED
STOP AT
GLAZING
TYPICAL - ALUMINUM
1 1/2"
/4
P A
R T
N
S C
H E
D
1 BORROWED LITES 3 SAFETY GLASS LOCATIONS 7 DOOR LEGEND
NOTE:
NOT ALL CONDITIONS SHOWN BELOW ARE APPLICABLE TO THE SCOPE OF WORK.
GLASS SCHEDULE
GLASS PRODUCT SCHEDULE FOR WALLS AND DOORS
NP - NOT PERMITTED
A - ACCEPTABLE
NR - NOT RECOMMENDED
FIRE -RATED
NON-FIRE -RATED
SAFETY NOT REQUIRED
SAFETY NOT REQUIRED
SAFETY REQUIRED
SAFETY REQUIRED
NP
NP
NP
A A A A
A
AA
A
NP NP
NP NP NP
NP
NR
NR
A N
N E
A L
E D W
IR
E
D
T E
M P
E R
E D L A
M
IN
A T
E D F
IR
E
R
A T
E D
SAFETY GLAZING (SG) IS REQUIRED FOR
WET AREAS CLOSE PROXIMITY TO DOORS GLAZED OPENINGS IN
DOORS
STANDING SURFACE
SG SG
ANY GLASS AROUND
THESE AREAS AT 60" OR
LESS ABOVE THE
STANDING SURFACE IS TO
BE SAFETY GLASS
SG
SAFETY GLASS IS TO BE
USED FOR ALL DOORS AT
HOT TUBS, WHIRLPOOLS,
SAUNAS, STEAM ROOMS,
BATH TUBS OR SHOWERS
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
24"
" 24"
DOOR NOTES
1. CONTRACTORS TO USE THE ARCHITECT'S FLOOR PLAN DESIGNATION DOOR NUMBER IN ADDITION TO THE ROOM NUMBER ON ALL SHOP DRAWING
SCHEDULE SUBMITTALS.
DOOR TYPESVISION PANELS, LOUVER TYPES, AND ACCESSORIES
DOOR AND BORROWED LITE FRAME TYPES SCALE: 1" = 1' - 0"
DOOR PLAN DESIGNATION
SUFFIX FOR MULTIPLE
DOORS AT A ROOM
DOOR NUMBER SAME
AS ROOM NUMBER
4" MIN
6" PREFERRED
OPENING MIN CLEAR
1' - 6" (PULL SIDE)
CLOSER AND LATCH
1' - 0" (PUSH SIDE) MIN
CLEAR IF DOOR HAS
DOOR OPENING LOCATION
A. DOORS SHOWN ADJACENT TO A FLANKING WALL OR OTHER FIXED OBSTRUCTION, SHALL BE LOCATED AS SHOWN ABOVE.
B. OTHER LOCATIONS SHALL BE ON CENTERLINE OF ROOM OR AS SPECIFICALLY DIMENSIONED.
(1) ALIGN TOP OF BL WITH ADJACENT DOOR FRAMES UNO.
(2) MAXIMUM DIMENSION IS 8' - 0".
(3) THE MAXIMUM AREA OF ANY SINGLE PANE OF WIRE GLASS IS 1296 SQ IN.
2 EXTERIOR LOUVER SCHEDULE
DOOR FIRE RATING
101X
VISION PANEL
OR LOUVER
ACCESSORY
LOCATION OF
HOLD OPEN
SYMBOL, IF
APPLICABLE
4 DOOR LEGEND
DOOR NOTES
1. CONTRACTORS TO USE THE ARCHITECT'S FLOOR PLAN DESIGNATION DOOR NUMBER IN ADDITION TO THE ROOM NUMBER ON ALL SHOP DRAWING
SCHEDULE SUBMITTALS.
5 CONTROL JOINT AT DOOR FRAMES
SINGLE DOORS
ALIGN WITH
EDGE OF DOOR
FRAME
CORNER ON
HINGE SIDE
DOUBLE DOORS
ALIGN WITH
EDGE OF DOOR
FRAME
CORNER
RATED
60/90
100 SQ IN MAX
6" 3"
M A
X
NON-RATED
OR
RATED 20/45 MIN
MIN
6"
X
M
IN6
Y
RATED
20/45 MIN
X
M A
X
Y
1296 SQ IN MAX
6" 6"
* - NOT ALLOWED AT SHOWER ENCLOSURES
SINGLE DOORS
4' X 8' GYP BD
PANEL
CONFIGURATION
DOUBLE DOORS
6 GYPSUM BD CONFIGURATION AT DOORS
BOTTOM OF
STRUCTURE
4' X 8' GYP BD
PANEL
CONFIGURATION
BOTTOM OF
STRUCTURE
V A
R
IE
S
V A
R
IE
S
V A
R
IE
S
EXTEND CJ TO
BOTTOM OF
STRUCTURE AT
RATED WALLS 4"
ABOVE CEILINGS AT
NON-RATED WALLS
CASED OPENING
ALIGN WITH
EDGE OF
CASED
OPENING
EXTEND CJ TO
BOTTOM OF
STRUCTURE AT
RATED WALLS 4"
ABOVE CEILINGS AT
NON-RATED WALLS
EXTEND CJ TO
BOTTOM OF
STRUCTURE AT
RATED WALLS 4"
ABOVE CEILINGS AT
NON-RATED WALLS
LOCATION OF
POWER
OPERATION
SYMBOL, IF
APPLICABLE
DOOR DEVICE
SYMBOL
SYMBOL
LOCATED ON
SIDE OF DOOR
DEVICE TO BE
INSTALLED
SYMBOL
LEGEND
SECURITY DEVICE
PROXIMITY
SENSOR
DELAYED EGRESS
FREE EGRESS
POWER
OPERATOR
HOLD OPEN
PUSH PLATE
BL1
BORROWED LITE (BL)
4' - 0"
FIN. FL.
L1
L1-1
NUMBERTYPE
RO, MO
R O
M
O
MO
3' - 0"
M O
W
2' - 11 1/2"
H
/2
PROVIDE SHIM SPACE
AROUND FRAME
F R
A M
E H
E
IG
H T
H
WIDTH (W)
FRAME
FIN. FL.
L1-2
A1 A2
FLUSH
SINGLE
FLUSH
DOUBLE
B1
ROLL-UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
MES GROUP, INC
550 North Reo Street Tampa, FL, 33609 813-289-4700 David Keith
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-500
DOOR, SAFETY GLAZING AND
LOUVER INFORMATION
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 Checker Author
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
DOOR SCHEDULE
D O
O R
N U
M B
E R
W
ID
T H
H E
IG
H
T
D O
O R
T Y
P E
D O
O R
M A
T E
R
IA
L
F R
A M
E T
Y P
E
F R
A M
E F
IN
IS
H
C A
R D
R E
A D
E R
D O
O R
R A
T
IN
G
V
IS
IO
N
P A
N E
L
L O
U V
E R
T Y
P E
H A
R D
W A
R E
K ic k P la te
A rm o r
P la te
C O
M M
E N
T S
16A 3'-0" 7'-0" A1 HM MTL PTD Y - 2 HW-E4 -
16B 3'-0" 7'-0" A1 HM MTL PTD Y - 2 HW-E4 -
16C 8'-0" 10'-0" MTL MTL - - MOTORIZED OPENER
16D 8'-0" 10'-0" MTL MTL - - MOTORIZED OPENER
16E 8'-0" 10'-0" MTL MTL - - MOTORIZED OPENER
16F 8'-0" 10'-0" MTL MTL - - MOTORIZED OPENER
17A 3'-0" 7'-0" A1 HM MTL PTD 90 - HW-3E -
17B 3'-0" 7'-0" A1 HM MTL PTD - 3 HW-3E -
18A 3'-0" 7'-0" A1 HM MTL PTD 90 - HW-12J -
18B 3'-0" 7'-0" A1 HM MTL PTD 90 - HW-12J -
19A 3'-0" 7'-0" A1 HM MTL PTD - - HW-12J -
19B 3'-0" 7'-0" A1 HM MTL PTD 90 - HW-12J -
20A 3'-0" 7'-0" A1 HM MTL - 180 - HW-12J -
20B 6'-0" 7'-0" A2 HM MTL PTD - - HW-E9
20C 3'-0" 7'-0" A1 HM MTL PTD 180 - HW-12J -
21A 6'-0" 7'-0" A2 HM MTL PTD Y - 2 HW-E9 -
Grand total: 16
B1
B1
B1
PTD
B1
PTD
PTD
PTD
HW-E5
HW-E5
HW-E5
HW-E5
PTD
SEALANT, TYPICAL @
PERIMETER EACH SIDE
HOLLOW METAL FRAME, W/
SOUND ATTENUATION BATTS
DOOR AS SCHEDULED
2"2"
CMU WALL SEE
STRUCTURAL DRAWINGS
FOR SIZE AND REINFORCING
/4
SEALANT, TYPICAL @
PERIMETER EACH SIDE
HOLLOW METAL
FRAME, W/ SOUND
ATTENUATION BATTS
DOOR AS SCHEDULED
2"
/4
FURRING WALL
WHERE OCURS
ALUM TRIM, TYP
BLAST DOOR PER
SCHEDULE
BACKER ROD &
SEALANT @
PERIMETER, TYP
DRIP EDGE
ATTACK
SIDE
SECURE
SIDE
/8
PRE-FIN. ALUM. FLASHING
W/ DRIP EDGE
ALUM TRIM, TYP
BLAST DOOR PER
SCHEDULE
ATTACK
SIDE
SECURE
SIDE
2 7/8"
ATTACK
SIDE
SECURE
SIDE
BLAST DOOR, AS
SCHEDULED
THRESHOLD, ANCHOR TO
FLOOR, SEALANT @ FLOOR
AS REQUIRED
/4
FLASHING
WEATHER STRIP
STEEL GUSSET
ANGLE AND PLATE
CONTINUOUS
STEEL CLIP ANGLE
SCREEN
LOUVER BLADE
CONCRETE WALL
PER STRUCTURAL
CONTINUOUS SEALANT
SEALANT, TYPICAL @
PERIMETER EACH SIDE
HOLLOW METAL FRAME, W/
SOUND ATTENUATION BATTS
2"
CONCRETE WALL SEE
STRUCTURAL DRAWINGS
FOR SIZE AND REINFORCING
/4
3/8" LAM GLASS BOTH SIDES
STEEL GUSSET
ANGLE AND PLATE
CONTINUOUS
STEEL CLIP ANGLE
SCREEN
LOUVER BLADE
CONCRETE WALL
PER STRUCTURAL
5"
PRE-FIN. PAN
FLASHING W/ END
DAMS & DRIP EDGE
SET IN FULL BED OF
SELANT
3" = 1'-0"07 BLAST DOOR HEAD
3" = 1'-0"06 BLAST DOOR JAMB
3" = 1'-0"01 TYP. INTERIOR DOOR JAMB/HEAD
3" = 1'-0"02 TYP. INTERIOR BORROWED LITE JAMB/HEAD
3" = 1'-0"03 TYP. JAMB/HEAD
3" = 1'-0"04 TYP LOUVER JAMB
3" = 1'-0"05 BLAST DOOR SILL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-501
DOOR & WINDOW DETAILS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 JS XL
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
3" = 1'-0"08 TYP LOUVER SILL
TYPE "R"
MORTAR JOINT
7 5/8" 3 HOURN/A 7 5/8"
SOLID ONLY.
SEE TABLE
721.3.2
CMU
LINE OF CEILING
MF05
LINE OF
STRUCTURE
REFER TO
PARTITION
HEAD
DETAILS
PROVIDE BACKER
ROD AND SEALANT AT
MOST VISIBLE FACE
MF04
NON RATED
CONDITIONLINE OF
STRUCTURE
NOTE:
ACTUAL BLOCK WIDTH/THICKNESS AS SHOWN
BELOW IS GREATER THAN THE MINIMUM REQUIRED
EQUIVALENT THICKNESS. SEE TABLE 721.3.2 OF THE
IBC FOR THE MINIMUM REQUIRED EQUIVALENT
THICKNESS.
R8
FLOOR PLAN
DESIGNATION
NO SOUND
ATTENUATION
FLOOR PLAN
DESIGNATION
WITH SOUND
ATTENUATION
CMU
WIDTH
PART
WIDTH
FIRE
RATING REMARKS
FOR RATED CONDITIONS ONLY
LINE OF
STRUCTURE
FILL CMU SOLID WITH CONCRETE, YIELDING
EQUIVALENT THICKNESS OF 7 5/8", REF.
TABLE 721.1(2) IBC.
E Q
E Q
AE-502
1 1/2" OD VERTICAL PIPE
1 1/2" OD PIPE GUARDRAIL
1 1/2" OD VERTICAL POST
CHANNEL PER STRUCTURAL
PRECAST CONCRETE
PANEL PER STRUCTURAL
CONTINUOUS SEALANT
REGLET AND
COUNTERFLASHING
METAL DECK AS
SPECIFIED
STRUCTURAL FRAMING
SIDE WALL FLASHING
MIN
1 1/2" EQ EQ
STAINLESS STL 1 1/2" OD METAL
HANDRAIL
/2
1/2" WELD HANDRAIL BRACKET @ EVERY
RAILING POST
RAILING POST, 4' OC
PARAPET CAP ASSEMBLY,
REF. DETAIL 8-A502 FOR
SPLICE CONDITION
CONCRETE PARAPET WALL
TPO ROOFING
MEMBRANE, TERMINATE
PER MFR'S. SPEC
REGLET AND
COUNTERFLASHING
CLEAT OF
PARAPET CAP
ASSEMBLY, TYP
P.T. WOOD
BLOCKING, TYP
CONTINUOUS
BACKER ROD AND
SEALANT
SEE STRUCTURAL
FOR CONNECTION
DETAILS
/4
/2
/4
3/4"
/4
/2
/4
3/4"
6" M
IN
L
AP
1/2 " G
AP
12'-0 " M
AX
LENGTH E
ACH
PIE
CE
OF C
OPIN
G C
AP
SHEET METAL COPING
CAP
SHEET METAL CONCEALED
PLATE SET IN SEALANT ON
EACH SIDE
TWO ROWS OF SEALANT
EACH SIDE BETWEEN
CONCEALED PLATE AND
COPING
SEALANT
FLASHING MEMBRANE
GALVANIZED CONDUIT (PVC
NOT ALLOWED)
STAINLESS STEEL DRAW
BAND
STRUT BASED SUPPORTS AT
10'-0" OC MAX
BACKER ROD
LOCATE AIR TERMINAL
PENETRATION IN FLAT AREA
BETWEEN REGLET AND
COPING. ADHERE A STRIP
OF ROOFING MEMBRANE AT
SUPPORT LOCATIONS. SEAL
FASTENER PENETRATIONS
WITH LIQUID
WATERPROOFING
LOCATE CONDUCTOR WIRE
IN FLAT AREA BETWEEN
REGLET AND COPING.
FASTEN WIRE WITH
BRACKETS SEAL FASTENER
PENETRATIONS WITH LIQUID
WATERPROOFING
NOTE: DO NOT INSTALL AIR TERMINALS ON TOP SIDE OF
COPING.
AIR TERMINAL
REGLET AND
COUNTERFLASHING
CONCRETE ROOF DECK
CONT 12" WIDE 20 GA GALV
SHEET METAL BACKER PLATE
ROOF SYSTEM
CONTINUOUS STRIPS OF
SELF-HEALING, SELF-
ADHERING MEMBRANE
FLASHING
20 GA GALVANIZED
FLASHING
WIND CLIPS AT
EACH CORNER
SEALANT: TOOL TO
FACILITATE WATER RUN
OFF
3 5/8" 20 GA STL STUDS
W/ 5/8" ROOF COVER
BOARD
TERMINATION BAR
CONT 4" WIDE 22 GA
GALV PLATE
BATT INSULATION
20 GA GALVANIZED
COUNTERFLASHING
STEEL BEAM, REF.
STRUCTURAL DWGS.
CONSTRUCTION
SPECIALTIES SF200
E. J. COVER OR
EQUAL
FACTORY FABRICATED
MITER
EXIST. PARAPET
NEW PARAPET
SECONDARY SEAL
TO FINISH WITHIN
BASE CLOSURE
FIELD FORMED
FLEXIBLE BASE
CLOSURE AT JOINT END
PRIMARY SEAL TO
FINISH 1/8" SHORT OF
BASE CLOSURE TO
ALLOW FOR DRAINAGE
CONSTRUCTION SPECIALTIES
SF-200 EXPANSION JOINT COVER
OR EQUAL, INSTALL PER MFR.
SPECS.
FACTORY FABRICATED
ROOF COVER TO WALL
COVER TRANSITION
FIELD SPLICE
CONSTRUCTION
SPECIALTIES
SF200 E. J. COVER
OR EQUAL
FACTORY FABRICATED
MITER
CONSTRUCTION SPECIALTIES
SF200 E. J. COVER OR EQUAL,
MOUNT INSIDE OF VERTICAL
TRANSITION OF BELLOWS
FEILD TRIM SF200 OR
EQ. TO FIT AROUND
PROFILE OF BELLOWS
BRJW200 ROOF COVER
EXIST. PARAPETNEW PARAPET
FIELD APPLY EPOXY
ADHESIVE EACH SIDE
CONSTRUCTION SPECIALTIES
HB200 EXPANSION JOINT COVER
OR EQUAL, INSTALL PER MFR.
SPECS.
EXISTING WALL PER
PLANS
NEW WALL PER PLAN
2" EXPANSION JOINT
6" = 1'-0"02 HANDRAIL SECTION @ GUARDRAIL
1 1/2" = 1'-0"01 GUARDRAIL SECTION
3" = 1'-0"07 PARAPET CAP
3" = 1'-0"04 TYPICAL RUSTICATION JOINT
3" = 1'-0"05 TYPICAL PANEL JOINT
3" = 1'-0"03 CANOPY @ EXTERIOR WALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/6
-2
-1
C o n s tr u c t c h ill e r p la n t a n d c o o lin g t o w e r.
rv t
/2
/2
:0
:5
P
M
AE-502
WALL TYPES & DETAILS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
668-23-101
May 23, 2025 JS XL
CONSTRUCT CHILLER PLANT
AND COOLING TOWER
100% Construction Documents
Revisions: Date:
3" = 1'-0"09 INTERIOR PARTITION TYPE
1 1/2" = 1'-0"15 FLASHING BOOT @ COOLING TOWER SUPPORT
3" = 1'-0"08 COPING CAP WITH CONCEALED PLATE
3" = 1'-0"11
LIGHTNING PROTECTION AIR
TERMINAL SUPPORT DETAIL AT PARAPET
1 1/2" = 1'-0"10
LIGHTNING PROTECTION
PENETRATION DETAIL
SCALE: 6" = 1'-0"12 TYPICAL E. J.