This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Network Contracting Office 20 in Vancouver, Washington on January 23, 2026. The amendment addresses industry questions related to solicitation 36C26026Q0207, originally dated January 8, 2026. The contracting officer is Derek Crockett. The amendment clarifies maintenance requirements for generator equipment and does not extend the offer receipt deadline. Offerors must acknowledge receipt of this amendment prior to the specified hour and date by completing the form, acknowledging receipt on each offer copy, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.

The government responses to seven industry questions address the following key clarifications: (1) radiator coolant replacement and system flush should occur every 3 years during the 1st and 4th years of the contract; (2) triannual requirements include a 4-hour load bank test, coolant change and flush, and annual maintenance; (3) Cummins units require 4-hour load bank testing annually because monthly testing does not exceed 30%; (4) Service Contract Labor Standards apply per clause 52.222-41, with wage determinations provided for Pierce County and King County, Washington; (5) work shall be performed Monday through Friday from 08:00 a.m. to 16:30 with prior Contracting Officer's Representative (COR) approval of the contractor's schedule; (6) maintenance logs will not be provided before solicitation close but may be available post-award; and (7) underground storage tanks (UST) are not part of the requirement scope.

View the file

Other files

File Type Posted
36C26026Q0207 0002.docx DOCX document
36C26026Q0207 0001.pdf PDF
Site Visit Instructions 1.20.2026.docx DOCX document
SCA WAGE DETERMINATIONS KING COUNTY WA..docx DOCX document
C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE.pdf PDF
Site Visit Instructions.docx DOCX document
36C26026Q0207.pdf PDF
SCA WAGE DETERMINATIONS PIERCE COUNTY WA..docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0003 01-23-2026

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26026Q0207

01-08-2026

X

X X

X

The purpose of the amendment is to answer industry questions.

See Continuation Pages for questions and government responses.

All other terms and conditions remain the same.

Derek Crockett Contracting Officer

1.) Replace radiator coolant if needed and flush system: Every 3 years or 6,000 hours whichever comes first (1st, and 4th year). Is this correct?

Yes. Radiator coolant replacement and system flush should occur every 3 years. This applies during the 1st and 4th year of the contract.

2.) What does a Triannual entail? I see that it is the load bank test, but then there is more mentioned right after in the same section. Is it a combination of the coolant flush, annual and load bank test?

Triannual requirements include:

4-hour load bank test

Coolant change and flush

Annual maintenance

3.) There is no 4-hour load bank testing for the 30% monthly loaded units, correct? And those are the Cummins units?

Cummins units, 4-hour load bank testing is required annually because Cummins units monthly testing not above 30%.

4.) Will this be prevailing wage?

As outlined in the RFQ and clause 52.222-41, SERVICE CONTRACT LABOR STANDARDS apply. See the following attached documents:

See attached document- SCA WAGE DETERMINATIONS PIERCE COUNTY WA.

See attached document: SCA WAGE DETERMINATIONS KING COUNTY WA

5.) The solicitation mentions that maintenance should be done Monday through Friday.

On the site visit, it was mentioned that the work should be done on weekends for the American Lake campus. Can you clarify?

As outlined in the RFQ and Performance Work Statement, ‘Work shall be performed during regular business hours from 08:00 a.m. to 16:30 Monday through Friday and with prior COR approval of the contractor’s schedule submission that will include dates and times of performance.”

6.). Will the previous maintenance log be provided before the due date?

Maintenance logs will not be provided before the close of this solicitation. Any previous maintenance logs available may be provided to a contractor post award if available.

7.). NO UST was mentioned in the solicitation. Can we assume it is out of scope?

There is no underground storage tank (UST) as part of this requirement.