This is a set of structural calculations and engineering drawings related to the renovation of Building 100's 2nd floor IR Lab at the VA Puget Sound Health Care System in Seattle, WA. The documents were prepared by Paul N. Crocker, P.E, S.E. of Reid Middleton in August 2022 for Spees Design Build.

The calculations analyze equipment loading on the floor for an IR Lab room, specifically evaluating a 2.5' x 6.5' area (16.25 SF) that will support a patient table and ceiling unit with a total weight of 3,163 lbs, resulting in 195 PSF loading. The analysis confirms this loading is acceptable since the floor deck is rated for 200 PSF, with additional capacity available through beam averaging and deck redistribution. The documents include detailed framing plans showing the IR Lab room location and equipment placement within the building's second floor layout.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE BLDG B100, 2ND FL FOR CT

REPLACEMENT

VA Puget Sound Health Care System - Seattle, WA

November 2021

Prepared for:

Spees Design Build

STRUCTURAL CALCULATIONS

Prepared By:

Paul N. Crocker, P.E, S.E.

728 134th St. SW, Suite 200 Everett, WA 98204

425-741-3800 www.reidmiddleton.com

File No. 262021.0XX

December 2021

RENOVATE BLDG B100, 2ND FL FOR IR LAB

REPLACEMENT

February 2022

File No. 262022.010

June 2022 August 2022

M A T C H

LI

N E

A F P N T C

A F P N T B

M A T C H

LI

N E

A F P N T B

A F P N T A

M A T C H

LI

N E

A F P N T B

A F P N T A

SHOWN AREA

PROJECT

NORTH

599 SF

SPECIAL

PROCEDURE

2D-117

CORRIDOR

C2-36

CORRIDOR

C2-22

44 SF

EQUIPMENT

2D-117A

EQUIPMENT

2D-115A

253 SF

CONTROL

2D-115B

MECHANICAL

ROOM

M.E.R #12

2D-152

ELECTRICAL

2D-151

SIGNAL

2D-151B

TELEPHONE

2D-151A

VESTIBULE

2D-151C STAIR #5

2D-205

VIEWING

C2-26

SPECIAL

PROCEDURE

2D-115

SE/152-10 SE/152-10

SE/152-0 SE/152-0

SE/114-0 SE/114-0

NE/380-0

NE/380-0NE/342-0

NE/342-0

37358

A

A

F O

P R

N I

S E

S O

S T

WF

O

A E T

E E

L

NE

I G

N

R

N

SH

I

O

N

G T

GNEAR

U T C

U R T S

E R

NI

E

P A U L

N

AT

HAN CRO

R E

K C

L

728 134th Street SW, Suite 200 Everett, Washington 98204 Ph: 425.741.3800 www.reidmiddleton.com © Copyright 2022 Reid Middleton, Inc.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

RLCPNC

SF101

LEVEL 2 - FRAMING PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE BLDG 100, 2ND FL

FOR IR LAB REPLACEMENT

VA PUGET SOUND HEALTH CARE SYSTEM - 1660 S

COLUMBIAN WAY, SEATTLE WA 98108

663-CSI-021

3/9/2022

35% SD2

XX OF XX

LEGEND

GENERAL NOTES

KEY PLAN

1/4" = 1'-0"

LEVEL 2 - FRAMING PLAN

PROJECT

NORTH

Revisions: Date:

'-0

6'-6" 2' -6

'-3

/2 panacro37358 Text Box

LAYOUT AND DIMENSIONS USED FOR AREA CALCULATIONS (SEE FOLLOWING PAGE)

APPROXIMATE

LOCATION OF IR

LAB ROOM

APPROXIMATE

EQUIPMENT

LOCATION

EQUIPMENT LOADING ON FLOOR:

A = 2.5' x 6.5' = 16.25 SF

W = PATIENT TABLE + CEILING UNIT* = 3,163 LB

p = 195 PSF

THIS IS OKAY. FLOOR DECK IS RATED FOR 200 PSF. THE BEAMS

HAVE A CONSIDER CAPACITY FOR AVERAGING BASED ON DECK

REDISTRIBUTION CAPACITY.

*IT APPEARS LIKELY THAT THE CEILING UNIT IS HUNG, HOWEVER,

IT IS CONSERVATIVELY TAKEN AS FLOOR-MOUNTED TO VERIFY

CAPACITY FOR MOUNTING AND STAGING.