663-CSI-021 -- Structural - Calculations.pdf
PDF 3 MB Posted
- Solicitation number
- 36C26025R0041
About this file
This is a set of structural calculations and engineering drawings related to the renovation of Building 100's 2nd floor IR Lab at the VA Puget Sound Health Care System in Seattle, WA. The documents were prepared by Paul N. Crocker, P.E, S.E. of Reid Middleton in August 2022 for Spees Design Build.
The calculations analyze equipment loading on the floor for an IR Lab room, specifically evaluating a 2.5' x 6.5' area (16.25 SF) that will support a patient table and ceiling unit with a total weight of 3,163 lbs, resulting in 195 PSF loading. The analysis confirms this loading is acceptable since the floor deck is rated for 200 PSF, with additional capacity available through beam averaging and deck redistribution. The documents include detailed framing plans showing the IR Lab room location and equipment placement within the building's second floor layout.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATE BLDG B100, 2ND FL FOR CT
REPLACEMENT
VA Puget Sound Health Care System - Seattle, WA
November 2021
Prepared for:
Spees Design Build
STRUCTURAL CALCULATIONS
Prepared By:
Paul N. Crocker, P.E, S.E.
728 134th St. SW, Suite 200 Everett, WA 98204
425-741-3800 www.reidmiddleton.com
File No. 262021.0XX
December 2021
RENOVATE BLDG B100, 2ND FL FOR IR LAB
REPLACEMENT
February 2022
File No. 262022.010
June 2022 August 2022
M A T C H
LI
N E
A F P N T C
A F P N T B
M A T C H
LI
N E
A F P N T B
A F P N T A
M A T C H
LI
N E
A F P N T B
A F P N T A
SHOWN AREA
PROJECT
NORTH
599 SF
SPECIAL
PROCEDURE
2D-117
CORRIDOR
C2-36
CORRIDOR
C2-22
44 SF
EQUIPMENT
2D-117A
EQUIPMENT
2D-115A
253 SF
CONTROL
2D-115B
MECHANICAL
ROOM
M.E.R #12
2D-152
ELECTRICAL
2D-151
SIGNAL
2D-151B
TELEPHONE
2D-151A
VESTIBULE
2D-151C STAIR #5
2D-205
VIEWING
C2-26
SPECIAL
PROCEDURE
2D-115
SE/152-10 SE/152-10
SE/152-0 SE/152-0
SE/114-0 SE/114-0
NE/380-0
NE/380-0NE/342-0
NE/342-0
37358
A
A
F O
P R
N I
S E
S O
S T
WF
O
A E T
E E
L
NE
I G
N
R
N
SH
I
O
N
G T
GNEAR
U T C
U R T S
E R
NI
E
P A U L
N
AT
HAN CRO
R E
K C
L
728 134th Street SW, Suite 200 Everett, Washington 98204 Ph: 425.741.3800 www.reidmiddleton.com © Copyright 2022 Reid Middleton, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
RLCPNC
SF101
LEVEL 2 - FRAMING PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE BLDG 100, 2ND FL
FOR IR LAB REPLACEMENT
VA PUGET SOUND HEALTH CARE SYSTEM - 1660 S
COLUMBIAN WAY, SEATTLE WA 98108
663-CSI-021
3/9/2022
35% SD2
XX OF XX
LEGEND
GENERAL NOTES
KEY PLAN
1/4" = 1'-0"
LEVEL 2 - FRAMING PLAN
PROJECT
NORTH
Revisions: Date:
'-0
6'-6" 2' -6
'-3
/2 panacro37358 Text Box
LAYOUT AND DIMENSIONS USED FOR AREA CALCULATIONS (SEE FOLLOWING PAGE)
APPROXIMATE
LOCATION OF IR
LAB ROOM
APPROXIMATE
EQUIPMENT
LOCATION
EQUIPMENT LOADING ON FLOOR:
A = 2.5' x 6.5' = 16.25 SF
W = PATIENT TABLE + CEILING UNIT* = 3,163 LB
p = 195 PSF
THIS IS OKAY. FLOOR DECK IS RATED FOR 200 PSF. THE BEAMS
HAVE A CONSIDER CAPACITY FOR AVERAGING BASED ON DECK
REDISTRIBUTION CAPACITY.
*IT APPEARS LIKELY THAT THE CEILING UNIT IS HUNG, HOWEVER,
IT IS CONSERVATIVELY TAKEN AS FLOOR-MOUNTED TO VERIFY
CAPACITY FOR MOUNTING AND STAGING.
File details come from the government source that posted it. Updated .