About this file

This file contains architectural, structural, electrical and mechanical drawings for an IR Lab renovation project at VA Puget Sound Health Care - Seattle Division, including detailed equipment plans, ceiling plans, conduit layouts, and environmental specifications. The drawings are labeled as "reference documents - not for construction" and show the layout of a medical imaging room with tilting table, control room, and equipment room.

The drawings include a checklist of project milestones that must be completed before equipment delivery, such as lead shielding installation, climate control functionality, verified delivery paths, casework completion, network drops, ceiling clearances, floor anchoring specifications, electrical wiring, and room cleaning requirements. Technical specifications show environmental conditions required for different areas (temperature ranges of 59-77°F, relative humidity 20-70%), details for ceiling-mounted equipment installation, cable routing requirements, and power/grounding specifications. The drawings are created by Siemens and include equipment legends, architectural notes, magnetic field precautions, and detailed dimensions for installation of medical imaging equipment.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEATTLE DIVISION PUGET SOUND VAMC

2103179

A-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

O T

F

R

C

N

S T

R U

C T

I O

N

WITH TILTING TABLE

PROJECT MILESTONES TO BE COMPLETED BEFORE EQUIPMENT DELIVERY

Storage area available for storing items during installation

Lead shielding (walls, doors, windows) complete

Climate control functioning 24 hours a day, 7 days a week

Delivery path verified for largest piece, including rails

Casework complete in control room

All walls primed and painted. Flooring installed

Room lighting complete and functional

Network drops active and IP addresses obtained for Siemens Remote Services (SRS)

Nothing hanging below ceiling in area shaded on drawing

Floor thickness and anchoring spec's verified. If req'd, alt solutions per engineer of record in place

All conduits, troughs, in-floor pull boxes and/or core drills avoid conflict with floor plate anchors

Unistrut installed to correct height, location, and levelness (check minimum ceiling height)

Cable runs checked to ensure maximum lengths not exceeded

X-Ray warning light and wiring installed

Contractor supplied electrical wiring / pigtails installed

Cable inlets located per plans

EPO's installed and functional

UPS started and functional

Ancillary equipment (OEM items, booms, etc) installed

Breakers installed and facility power available

All rooms containing Siemens equipment are clean and dust-free

REFERENCE SHEET

A-101

A-101

A-101

A-101

A-101

A-101

A-101

A-102

A-102

S-101

S-101

S-102

E-101

E-101

E-102

E-102

E-102

E-102

E-102

E-501

A-101

A-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

N

S-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

S-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-101ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-102ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

E-501ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

M-501ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I O

N

ATTENTION:

R E

F E

R E

N C

E

D

O C

U M

E N

T

N

N

S T

R U

C T

I

File details come from the government source that posted it. Updated .