This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a construction project by the Department of Veterans Affairs Veterans Health Administration. The amendment (Number 0003) extends the offer receipt deadline to April 25, 2025, at 12:00 PDT for solicitation 36C26025R0004, which involves relocating B232 ITOPS in White City, OR.

Key updates include revised specifications and drawings, answers to industry questions, a second organized site visit scheduled for April 10, 2025, at Building 229, and implementation of Executive Order changes removing several standard FAR clauses. The project allows a single contractor personnel member to fulfill multiple roles (Quality Control Manager, Safety Officer, and Superintendent) and involves electrical, fiber, and security infrastructure modifications. The solicitation is a full and open unrestricted competitive procurement, with all official communications to be conducted through SAM.gov.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-03-2025 692-24-102 36C260 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offeror

36C26025R0004 02-11-2025

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-25-2025 12:00 PDT The purpose of this amendment is summarized as follows- see continuation pages for complete details:

1- Provide revised specifications and drawings that supersede.

2- Provide answers to questions and answers received from industry on the original specifications and drawings.

3- Provide a second organized site visit and time frame for submitting questions, and extend the deadline for receipt of offers (see box 11 above for new deadline for receipt of offers).

4- Implement Executive Orders that require removal or deviation of FAR clauses and/or provisions.

CONTINUATION PAGE

1- The following attachment supersede previously issued specifications and drawings for the subject project:

Attachment 5 - 692-24-102 Relocate B232 ITOPS - Specs Rev 1 Attachment 6 - 692-24-102 Relocate B232 ITOPS - Drawings Rev 1

2- Provide answers to questions and answers from industry, as follows. Government answers are in italics.

· Can a single Prime Contractor personnel member fulfill the roles of Quality Control Manager (QCM), Safety Officer, and Superintendent, or are separate individuals required for each position?

Yes, one person can hold the role of all three (3) positions, as long as the person is not holding any position on any current contracts.

· What would you like to do with the fiber that goes to Building 234 and 231 for the generator?

See revised drawings dated 04/02/2025. Existing fiber will all remain, and new fiber will be installed.

· On drawing 4, it does not show S/R on the exterior of the (new) room. For fire rating, it will require it. Is this room required to be fire-rated?

See revised drawings dated 04/02/2025.

· On the drawings, it calls for a security door on drawing 3, detail 3. It does not specify whether the door is metal or wood.

The revised specifications further clarify.

· The specs have multiple hardware sets. Which package would be the correct one? Which door frame is required for this location?

See revised specifications, which include door hardware.

· Is painting of the (new) room needed on the interior, exterior, and if so, what color?

See revised drawings and specifications which further clarifies.

· There is a callout in the specs for pretesting the electrical. Is that not applicable?

See revised specifications, noting that overcurrent protective device coordination is required.

· The specs have multiple areas that seem not to be part of this project. Can you clarify which areas are included?

The specifications and drawings have been revised and are attached to this amendment.

· In Building 232 ITOS, how many data drops and locations are there in Building 232?

See revised drawings dated 04/02/2025.

3- A second organized site visit has been determined best interest by the Government, in consideration of the revised drawings and specifications.

An organized site visit will be conducted on Thursday, April 10th, 2025, at 1100 Pacific.

Participants shall meet at Building 229, 8495 Crater Lake Highway, White City, OR, 97503.

The Government currently does not anticipate offering any further organized site visits after this date and time.

4- The following changes are made to implement Executive Orders

The following are removed in full:

FAR 52.222-9 Apprentices and Trainees (JULY 2005) FAR 52.222-21 Prohibition of Segregated Facilities (APR 2015) FAR 52.222-22 Previous Contracts and Compliance Reports (FEB 1999) FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999) FAR 52.222-25 Affirmative Action Compliance (APR 1984) FAR 52.222-26 Equal Opportunity (SEP 2016) FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)

The following deviations are hereby included, with deviation as indicated herein:

FAR 52.204-8 Annual Representations and Certifications (JAN 2025) (DEVIATION FEB 2025)

· Removes (c)(1)(xiv), and (c)(1)(xv) and marks these sections as reserved.

FAR 52.222-6 Construction Wage Rate Requirements (AUG 2018) (DEVIATION FEB 2025)

· Removes reference in (b)(3) “except as provided in the clause entitled Apprentices and Trainees.”

FAR 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION FEB 2025)

· Removes (b)(3) “Apprentices and Trainees” and marks as reserved.

FAR 52.222-12 Contract Termination – Debarment (MAY 2014) (DEVIATION FEB 2025)

· Removes reference to the Apprentices and Trainees clause.

FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)

· Removes (c)(1)(xi) and (c)(1)(xii) and marks these sections as reserved.

NOTE: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.