This is Amendment 0001 to RFQ 36C26025Q0089, issued by the VA Network Contracting Office 20 in Vancouver, WA, containing questions and answers regarding a Temperature and Humidity Monitoring System Equipment & Annual Services requirement. The amendment clarifies two key technical requirements: 1) The temperature monitoring platform must be FIPS 140-2 compliant per VA protocols and federal requirements, with a transition to updated standards required by September 22, 2026, and 2) NIST certification in compliance with ISO 17025 standards is required specifically for the temperature probe component of the system, not necessarily the transmitter.

View the file

Other files

File Type Posted
S02 - RFQ Amendment 36C26025Q0089 0001 - extended.pdf PDF
S02 - Price Cost Schedule.xlsx XLSX spreadsheet
36C26025Q0089_1.docx DOCX document
S02 - RFQ 36C26025Q0089.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 01-03-2025

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd

Bldg.17, Suite B428

Vancouver WA 98661

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd

Bldg.17, Suite B428

Vancouver WA 98661

To all Offerors/Bidders

36C26025Q0089

01/03/2025

X

X X

X 1

The next page of this amendment lists the answers to questions received regarding this solicitation. The questions are in black, and the answers are in red.

Amy Kuczajda

VA-VHA-RPOW-2023-0056

CONTINUATION PAGE

Questions:

1. Is the temperature monitoring platform required to be FIPS compliant as per VA protocols?

Yes - Per the May 5th, 2015 memorandum from the VA Chief Information Security

Officer (CISO) FIPS 140-2 FIPS 140-2 Validate Full Disk Encryption (FOE) for Data at

Rest in Database Management Systems (DBMS) and in accordance with Federal requirements and VA policy, database management must use Federal Information

Processing Standards (FIPS) 140-2 or its successor to protect the confidentiality and integrity of VA information at rest at the application level. If FIPS 140-2 encryption at the application level is not technically possible, FIPS 140-2 or 140-3 compliant full disk encryption (FOE) must be implemented on the storage device where the DBMS resides.

Appropriate access enforcement and physical security control must also be implemented. All instances of deployment using this technology should be reviewed to ensure compliance with VA Handbook 6500 and National Institute of Standards and

Technology (NIST) standards. It is the responsibility of the system owner to work with the local CIO (or designee) and Information System Security Officer (ISSO) to ensure that a compliant DBMS technology is selected and that if needed, mitigating controls are in place and documented in a System Security Plan (SSP). By September 22, 2026, all

FIPS 140-2 certificate validations will be placed on the Historical List, please refer to

FIPS Transition Effort for further guidance and timeline of changes.

2. With regards to the required NIST certification in compliance with ISO 17025 standards

– is the NIST certification required for both the Probe and Transmitter?

NIST Certification refers to the item that is taking the temperature. In most cases it is the Probe.