This document is a set of final drawings and specifications related to a federal contract opportunity for the renovation of approximately 1,500 square feet of existing space at the VA Puget Sound Health Care System in Seattle, Washington to replace one Computed Tomography (CT) scanner and add an additional CT with VA specified GE Revolution Apex CT equipment.

The project will be executed in two phases. Phase 1 will include demolition and construction of a new CT room and supporting spaces within 180 days. Phase 2 will include installation of the second CT machine and associated equipment within 105 days. The contract will be a single, firm-fixed-price construction contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The magnitude of the construction is between $1,000,000 and $2,000,000. GE Healthcare will be responsible for moving the CT equipment from the loading dock to the completed rooms. The solicitation number is 36C26024R0098 and the proposals are due on August 22, 2024.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness Checklist 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Radiation Protection 06 - A4 - Equipment Dimensions (1) 07 - A5 - Equipment Dimensions (2) 08 - A6 - Delivery 09 - S1 - Structural Notes

10 - S2 - Structural Layout 11 - S3 - Structural Details (1) 12 - S6 - Structural Details (2)

13 - M1 - HVAC

14 - E1 - Electrical Notes 15 - E2 - Electrical Layout 16 - E3 - Electrical Elevations 17 - E4 - Power Requirements 18 - E5 - Electrical Details - Interconnect

SheetFormat

Concession

Scale DateFile Name

RevS.O. (GON)

A3

Seattle, WA

Michael Daniels

REVOLUTION APEX

CRM

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /18CT-M208377-FIN-00-A.DWG

+1 2063004533

Michael.daniels@ge.com

JDT 5418654-1EN

USA

1/4"=1'-0"

5038636

03/MAR/2022

VA Puget Sound Health Care System Seattle Division

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -

Drawn by Verified by PIM Manual

REV DATE MODIFICATIONS

A 03/MAR/2022 Final drawing based on DC-33127

FINAL STUDY

GENERAL SPECIFICATIONS

· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

· Dimensions apply to finished surfaces of the room.

· Actual configuration may differ from options presented in some typical views or tables.

· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

· The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION

· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

Site Ready Checks at Installation

EHS Site Requirements

Overall access route to the scan room free from obstruction / high hazards.

Enough space to store tools, equipment, parts, install waste and the general area free from obstruction and trip hazards.

Enough necessary facilities for the GE employees available.

No 3rd parties working in the area that may affect the safety of the installation activity.

Area free from any chemical, gas, dust, welding fume exposure and has painting been completed and dry.

All emergency routes identified, signed and clear from obstruction.

Accessible single source lockable panel that LOTO can be applied to for GE equipment installation (MDP and/or PDU).

There are no other conditions or hazards that you have observed or have been made aware of by the customer or contractors on site.

Required for Mechanical Install start

Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.

Ceiling support structure, if indicated on the GE drawing, is in the correct location and at the correct height according to the Original Equipment Manufacturer specifications.

Levelness and spacing has been measured, and is ready for the installation of any GE supplied components.

Overhead support Structure (unistrut) has been confirmed with customer/contractor to meet required GE provided criteria.

Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.

Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications.

Entry door threshold meets PIM requirement.

Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.

Cable ways (floor/wall/ceiling/Access Flooring) are available for installation of GE cables are of correct length and diameter.

Cable ways routes per GE Final drawings and cable access openings areas installed at a time determined by GEHC PM. Surface floor duct can be installed at time of system installation.

Adequate room illumination installed and working.

Customer supplied countertops where GE equipment will be installed are in place.

Required for Calibration Start

HVAC systems Installed, and the site meets minimum environmental operational system requirements.

System power & grounding (PDB/MDP) is available as per GE specifications.

System power & grounding (PDB/MDP) is installed at point of final connection and ready to use. Lock Out Tag Out is available.

PMI to confirm all feeder wires and breaker are size appropriately. EPO installed if needed.

PMI to confirm with electrician all power and signal cables are well terminated ensuring there are no loose connections.

Network outlets installed.

Computer network available and working.

Lead doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory approval for installation obtained.

GLOBAL SITE READINESS CHECKLIST (DI)

DOC1809666 Rev. 7

Note: The details shown here are only an extract from DOC1809666. For the complete document please contact your PMI.

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division Disclaimer - Site Readiness Checklist 02

ENVIRONMENT

ALTITUDE

· The system shall meet all functional and performance specifications when placed in a room that is at an elevation of -150 m to 2,400 m [-492 ft to 7,875 ft] above sea level. For different altitudes refer to the PIM.

MAGNETIC FIELD SPECIFICATIONS

· Limit the magnetic interference to guarantee specified imaging performance.

GANTRY:

· Ambient static magnetic fields less than 1 Gauss.

· Ambient AC magnetic fields less than 0.01 Gauss.

OPERATOR CONSOLE:

· Ambient static magnetic fields less than 10 Gauss.

SYSTEM CABINET:

· Ambient static magnetic fields less than 10 Gauss.

SYSTEM NOISE LEVEL

· The maximum noise level produced by the system in the scan room is less than 70 dBA at one meter [3.3 ft] from any surface of the system.

· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE healthcare installation project manager prior to making changes.

· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE healthcare installation project manager can supply a reference list of rigging contractors.

· New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Capability for image analysis,

4. Restrooms.

· Provide for refuse removal and disposal (e.g. crates, cartons, packing)

· For CT, MR, PET/CT, and SPECT systems it is required to minimize vibrations within the scan room. It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for vibration specifications.

CUSTOMER SITE READINESS REQUIREMENTS

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division General Notes 03

LEGEND

A GE Supplied D Available from GE B GE Supplied/contractor installed E Equipment existing in room

C Customer/contractor supplied and installed * Item to be reinstalled from another site

For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com

CONTROL ROOM

EXAM ROOM

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division A2 - Equipment Layout 041/4"=1'-0"

30'-7"

8'-11"

'-1

1"

'-5

19'-10"

6' -1

1"

10'-7"

4'-8"

9' -0

EXAM ROOM HEIGHT

Finished ceiling height 9'-6"

BY ITEM DESCRIPTION

MAX

HEAT

OUTPUT

(btu)

WEIGHT

(lbs)

A 1 Gantry 27150 6170

A 2 Patient Table (NG-2000V) - 1474

A 3 Power Distribution Unit 1200 933

A 4 System Cabinet IV 10578 736

D 5 Service Cabinet - -

A 6 Operators Console 5100 106

B 7 Main Disconnect Panel - 90

A 8 Partial UPS (14 kVA) 3000 620

A 9 Operators Chair - -

A 10 Workstation Desk - 132

B 11 Injector - ceiling mounted - 66

B 12 Injector Control and Electronics - 9

B 13 LCD Monitor 300 61

B 14 Smart Subscription server for CT 6134 121 C 15 Lead glass window

C 16 Minimum door opening for equipment delivery is 46 in. w x 78 in. h [1168mm x 1980mm], contingent on a 96 in. [2438mm] corridor width

RADIATION PROTECTION TABLES

Typical Scatter Radiation in μGy/100 mAs - Horizontal Plane 160 mm [6.30 in] Collimation

X-axis (m [ft]) Z-axis (m [ft])

3 [9.8] 2.5 [8.2] 2 [6.6] 1.5 [4.9] 1 [3.3] 0.5 [1.6] 0 [0] -0.5 [-1.6] -1 [-3.3] -1.5[-4.9]

-1.5 [-4.9] 3.96 5.49 8.10 9.76 8.74 0.88 0.67 0.33 0.45 1.81 -1 [-3.3] 3.87 5.63 8.47 14.20 26.53 6.09

ISO

1.60 9.63 -0.5 [-1.6] 3.60 5.35 8.55 15.60 36.35 126.45 36.08 16.00

0 [0] 3.40 5.11 8.26 15.69 39.08 166.10 45.70 17.91

0.5 [1.6] 3.60 5.35 8.55 15.60 36.35 126.45 36.08 16.00 1 [3.3] 3.87 5.63 8.47 14.20 26.53 6.09 1.60 9.63

1.5 [4.9] 3.96 5.49 8.10 9.76 8.74 0.88 0.67 0.33 0.45 1.81

Typical Scatter Radiation in μGy/100 mAs - Vertical Plane 160 mm [6.30 in] Collimation

Y-axis (m [ft]) Z-axis (m [ft])

3 [9.8] 2.5 [8.2] 2 [6.6] 1.5 [4.9] 1 [3.3] 0.5 [1.6] 0 [0] -0.5 [-1.6] -1 [-3.3] -1.5[-4.9]

1.5 [4.9] 4.10 5.97 8.44 8.79 7.34 1.33 0.57 0.34 0.46 1.10 1 [3.3] 4.31 5.81 8.63 14.07 15.71 1.33 0.60 5.56

0.5 [1.6] 3.86 5.91 9.28 15.19 31.83 37.18

ISO

20.30 17.38 0 [0] 3.40 5.11 8.26 15.69 39.08 166.10 45.70 17.91

-0.5 [-1.6] Table

25.70 15.41

A cylindrical PMMA phantom with a diameter of 32 cm [12.60 in] and a length of 30 cm [11.81 in] (for the 160 mm [6.30 in] collimation measurements) is centered in the scan plane and scanned. Scatter radiation measurements are made for both the vertical and the horizontal planes which include the axis of rotation. The horizontal plane is 1.03 m [3.38 ft] above the floor.

Tables below show scatter radiation for 160 mm [6.30 in] collimation. The air kerma per 100 mAs (μGy / 100 mAs) is provided at 0.5 m [1.6 ft] intervals within each plane. The CT scan technique that results in the maximum scatter radiation per unit mAs is used for all measurements as follows:

· Detector Coverage = 160 mm [6.30 in] (256x0.625 mm [10.08x0.02 in])

· Tube voltage = 140 kV

· SFOV = Medium Body

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division A3 - Radiation Protection 05

POWER DISTRIBUTION UNIT (PDU)

SCALE 1:20 Indicates air flow (Convection)

Center of Gravity

[35.4 in]

[6 in]

[14 in]

[6 in

[2 in

[3 in

] 700 [28 in]

Service Area

TOP VIEW

Minimum air flow clearance

FRONT VIEW SIDE VIEW

[4 in

[5 in

[15 in]

[5 in

[1 in

[15 in]

[9 in

Seismic mounting brackets

Weight: 10 kg [22 lbs]

SCALE 1:20

SYSTEM CABINET

TOP VIEW

Indicates air flow (Convection)Center of Gravity

Minimum air flow clearance

SIDE VIEW FRONT VIEW

Cable inlet at the rear back of the equipment

[2 3.

in

2.

[6 in

2.

[6 in

[2 3.

in

152.4 [6 in]

152.4 [6 in]

1357.6 [53.4 in]

[5 5.

in

613.5 [24.2 in]

1315.2 [51.8 in]

[2 5.

in

[12.3 in]

[9 in]

Seismic mounting brackets613.5 [24.2 in]

[15 in]

[22 in]

GANTRY WITH TABLE

SCALE 1:50

SIDE VIEW FRONT VIEW

Sc an c en te rli ne

[14 in]

FrontRear

Sc an c en te rli ne

[80 in]

[226 in]

[16 in]

[110 in]

[97 in]

[90 in]

[52 in]

[3 in

[71 in]

[41 in]

.8 [4 in

[3 in

936.5 [37 in]

936.5 [37 in]

[15 in]

[15 in]

[5 in]

[8 in

TOP VIEW

OPERATOR CONSOLE

SCALE 1:20

SMART WORKSPACE DESK

FRONT VIEWSIDE VIEW

[51 in]

[3 in

[3 in

[24 in]

SMART WORKSPACE DESK AND OPEN CONSOLE

[3 in

FRONT VIEW

TOP VIEW

Center of Gravity

[1 in

[6 in]

[15 in]

[20 in]

[1 in ]57

[2 in

80 [3 in

[5 in]

[9 in

[6 in]

[6 in]

[6 in]

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division A4 - Equipment Dimensions (1) 06

AutoCAD SHX Text Revolution

MAIN DISCONNECT PANEL

FRONT VIEW SIDE VIEWTOP VIEW

SCALE 1:10

Center of gravity 368

[14.5 in]

[16.7 in]

[8.5 in]

[3 6.

in

[3 4.

in

4xØ

[Ø0 .4 i n]

[1 in

[8.3 in]

[9 in]

[3.5 in]

[1 6.

in

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division A5 - Equipment Dimensions (2) 07

DELIVERY

STATIONARY ASSEMBLY

L = 2753 [108.4 in]

L = 2878 [113.3 in]

ROTATING ASSEMBLY

H

[8 0.

in

W = 1149 [45.2 in]

*Assuming that the lowest point of the rotating assembly is 97 mm [3.8 in] above the floor.

H

[7 in

W = 1018 [40.1 in]

*Assuming that the lowest point of the stationary assembly is 101 mm [4 in] above the floor.

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT

EQUIPMENT DIMENSIONS WEIGHT

GANTRY

STATIONARY

ASSEMBLY

LENGTH 2753 mm [108.4 in]

1738.8 kg 3830 lbsWIDTH 1149 mm [45.2 in]

HEIGHT 2049 mm [80.7 in]

ROTATING

ASSEMBLY

LENGTH 2878 mm [113.3 in]

1681.6 kg 3704 lbsWIDTH 1018 mm [40.1 in]

HEIGHT 1905 mm [75 in]

NG-2000V PATIENT TABLE

LENGTH 2972 mm [117 in]

737.2 kg 1622 lbsWIDTH 1120 mm [44.1 in] HEIGHT 1230 mm [48.4 in]

NOT TO SCALE

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division A6 - Delivery 08

STRUCTURAL NOTES

· all steel work and parts necessary to support ceiling mounted equipment is to be supplied by the customer or his contractors.

· methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.

· all units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan and detail sheets for suggested locations and mounting hole locations.

· all ceiling mounted fixtures, air vents, sprinklers, etc. To be flush mounted, or shall not extend more than 1/4" below the finished ceiling.

· floor slabs on which equipment is to be installed must be level to 1/4" in 10'-0"

· dimensions are to finished surfaces of room.

· customers contractor must provide all penetrations in post tension floors.

· customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

· customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

· it is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit"

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division S1 - Structural Notes 09

ITEM DESCRIPTION

(CONTRACTOR SUPPLIED & INSTALLED)

1 Gantry leveling pads. See Structural Detail

2 Table base plate and leveling pads. See Structural Detail

3 Support Backing, locate as shown

4 Ceiling support for injector

5 The pedestal-ceiling mount requires a flush ceiling mounting plate that is structurally supported to handle the weight of the load.

CONTROL ROOM

EXAM ROOM

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division S2 - Structural Layout 101/4"=1'-0"

'-4

9' -0

8'-11"

5'-10"

8'-1"

6' -1

0"

'-8

1 2

3 4

13'-1" 1'-4"

5' -1

6'-4"

10'-8"

4' -1

FLOOR SPECIFICATIONS

Notes:

· Anchors must be embed at least 100 mm [3.9 in] from concrete floor edge or expansion joint

Leveling pad or footpad

Adjuster lock ring Gantry stationary base

Levelling screw Anchor washer

Screw 25 mm [0.98 in] max after proper torque 13 mm [0.51 in] min after proper torque

Nut

Anchor bolt

43.5 mm [1.71 in] +/- 11 mm [0.43 in]

FINISHED FLOOR REQUIREMENTS

· Installation requires a finished floor in the scan and control rooms.

· The floor surface in the scan room directly under the gantry and table must be level.

· The floor levelness tolerance of the floor surface that the gantry and table will rest on is 6 mm [0.25 in] over a 3000 mm [9.8 ft] distance.

· Shims should not be used to compensate for a floor that does not meet this requirement.

· If the concrete floor has a floor covering installed over it (such as floor tile), the foot pad load bearing areas under the gantry and the patient table shall be cut into the flooring to ensure the table and gantry rest on a solid surface. (Openings cut during installation.)

· These floor penetrations can be sealed if required. These requirements apply to all installation types.

NOT TO SCALE

m m [3

.3 in m m [2

.9 in

M in m m

[4 in th ic k co nc re te

GE SUPPLIED GANTRY ANCHORS

ANCHORING/LOADING DISTRIBUTION TO THE FLOOR

SCALE 1:20

Revolution CT Gantry

2874.5 kg [6335 lbs] Revolution CT ES Gantry

2820.4 kg [6218 lbs] Revolution APEX Gantry

2798.7 kg [6170 lbs]1

[1 4.

in

(1) Scan plane centerline

(2) Longitudinal axis

(3) Cable inlet area

(4) First anchor to be drilled

(5) 12 anchoring points for Gantry

(6) 12 anchoring points for Patient Table

(7) 2 leveling pads

(8) 2 table calibration brackets

Center of gravity Main anchoring points Backup anchoring points

2000V Table 670 kg [1471 lbs] with 306.5 kg [675 lbs] patient

.6 [4

0.

in

.9

[1 .7 in

7.

[3

1.

in

2.

[3

4.

in

.2 [4

7.

in

.2 [5 in

.5 [6

8.

in

[21 in]

146.8 [5.8 in]

221.8 [8.7 in]

224.8 [8.9 in]

221.8 [8.7 in]

.4 [7 in

8 24 [1 in]

113.5 [4 in]

161.5 [6 in]

2.

[3 in

736.5 [29 in]

953.5 [37.5 in]

953.5 [37.5 in]

2.

[5

.2 in

936.5 [36.9 in]

936.5 [36.9 in]

5.

[4

.2 in

736.5 [29 in]

2.

[2

4.

in

[2 in

[7 in

[12 in]

[1 in

836.5 [32.9 in]

836.5 [32.9 in]

836.5 [33 in]

736.5 [29 in] 836.5

[33 in]

736.5 [29 in]

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division S3 - Structural Details (1) 11

[13.78 in]*

[8.66 in]

[11.81 in]*

[1 3.

in

[7 .8 in

[8 .6 in

[1 1.

in

LCD MONITOR MOUNTING PLATES

Material for the boom pedestal mounting plate shall be:

· Structural steel between 10-15 mm [0.4-0.6 in] thickness

· Tensile stress shall be 400 MPa or greater

· Yield stress shall be 235 MPa or greater NOTE: Safety factor on the junction box mounting plate and the boom mounting plate shall be no less than 4 times load.

Dimensions marked with an asterisk (*) in the illustration above (and the available engineering drawing provided by the PMI) are for customer reference only. Since the customer supplies this plate, dimensions marked with (*) are minimum size recommendations and may vary, depending on customer ceiling layout. The ceiling mounting plate must be designed by a structural engineer and installed by a qualified contractor prior to the system installation.

NOT TO SCALE

4xØ11 [Ø0.43 in]* THRU

4xM6 THRU 4xØ7 [Ø0.28 in]* THRU

[14.53 in]*

[1 4.

in

[12.01 in]*

[1 2.

in

[5

.9 in

[5.98 in]

[1.97 in]

[1

.9 in in

3.175 [0.13 in]

4xØ14 [Ø0.55 in]*

4xØ14 [Ø0.55 in] 8xM8

Ø12 [Ø0.47 in]

Ø150 [Ø5.91 in] M8

Ø15 [Ø0.59 in]

Material for the junction box mounting plate shall be:

· Structural steel between 8-15 mm [0.3-0.6 in] thickness

· Tensile stress shall be 400 MPa or greater

· Yield stress shall be 235 MPa or greater

[3

.1 in

CUSTOMER SUPPLIED JUNCTION BOX MOUNTING PLATECUSTOMER SUPPLIED BOOM PEDESTAL MOUNTING PLATE

[7.87 in]

LCD MONITOR SUSPENSION

NOT TO SCALE Center of Gravity

[2 2.

in

[2

9.

in

[2.5 in]

[29.5 in]

[35.8 in]

[35.1 in]

Weight: 35.4 kg [78 lbs]

Axis A Axis B Rotates around axis "B"Rotates around axis "A"

.8

[0 .7 in

Customer supplied boom pedestal mounting plate m in

. 2 m in in

[5 in m in

. 1

[7 in max. 500 [20 in]

GE supplied junction box cover plate Customer supplied junction box mounting plate GE supplied junction box

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division S6 - Structural Details (2) 12

HEAT DISSIPATION DETAILS

ROOM DESCRIPTION

Max (btu)

Max (kW)

Exam Room Gantry and Patient Table 27150 7.95

TOTAL 27150 8.0

Exam Room or Technical Room*

Power Distribution Unit 1200 0.352 System Cabinet IV 10578 3.1

Partial UPS - Powerware 9355-15-14GE 3000 0.88

TOTAL 14778 4.3

Control Room

Operator console (including 2 monitors) 5100 1.5 Smart Subscription Server ML350G10 6134 1.8

TOTAL 11234 3.3

*Technical Room is not mandatory, the placements of these elements are recommended in the Exam Room.

TEMPERATURE AND HUMIDITY SPECIFICATIONS

STORAGE CONDITIONS

IN-USE CONDITIONS

Temperature +4°C to +27°C

40°F to +80°F

Temperature gradient ≤ 3°C/h

≤ 5.4°F/h Relative humidity (1) 20% to 60% Humidity gradient ≤ 5%/h

EXAM ROOM CONTROL ROOM

Temperature (From -150 m [-492 ft] to 1600 m [5249 ft])

Min Recommended Max Min Recommended Max

18°C 22°C 26°C 18°C 22°C 26°C

64°F 72°F 79°F 64°F 72°F 79°F

Temperature (From 1600 m [5249 ft] to 3000 m [9843 ft])

Min Recommended Max Min Recommended Max

18°C 22°C 25°C 18°C 22°C 25°C

64°F 72°F 77°F 64°F 72°F 77°F Relative humidity (1) 30% to 70% 30% to 70%

AIR RENEWAL

According to local standards.

Storage longer than 6 months is not recommended.

(1) Non-condensing

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division M1 - HVAC 13

CONNECTIVITY REQUIREMENTS

Your new GE Healthcare imaging modality will require local and remote connectivity to enable our full range of digital support:

· Local connectivity - This allows your system to connect to local devices such as PACS and modality worklist.

We will require network information to configure the system(s), and a live ethernet port(s) prior to the delivery of the system(s).

· Remote connectivity - Your GE Healthcare service warranty includes InSite™ (applicable to InSite capable products), a powerful broadband-based service which enables digital tools that can help guard your hospital against equipment downtime and revenue loss by quickly connecting you to a GE Healthcare expert.

Depending on product family and software version, imaging systems can be connected in one of the following methods:

1. TLS over TCP Port 443 (Preferred method for new products) via:

a. DNS resolution

b. Customer-provided Proxy or

c. GE Proxy (Available in some regions)

2. Site-to-Site IPsec VPN tunnel

Please provide the GE project manager with the contact information for the resource that can provide information required to set up these connections. GEHC will send out communication to these contacts, which will include the project's Connectivity requirements, and a Connectivity form. This form will need to be completed and returned to GEHC prior to delivery of the system to ensure the system is tested and connectivity is enabled prior to the completion of the installation.

ELECTRICAL NOTES

· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.

· Conduit and duct runs shall have sweep radius bends

· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

· All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2.Ductwork shall be certified/rated for electrical power purposes.

3.Ductwork shall be electrically and mechanically bonded together in an approved manner.

4.PVC as a substitute must be used in accordance with all local and national codes.

· All openings in access flooring are to be cut out and finished off with grommet material by the customers contractor.

· General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.

· 10 foot pigtails at all junction points.

· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.

1.1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.

Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except MR). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).

8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.

9. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.

10. The maximum point to point distances illustrated on this drawing must not be exceeded.

11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with the supervision of a GE representative. The GE representative would be required to identify the physical connection location, and insure proper handling of GE equipment.

12. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division E1 - Electrical Notes 14

CONTROL ROOM

EXAM ROOM

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division E2 - Electrical Layout 151/4"=1'-0"

ITEM QTY Outlet Legend for GE Equipment

Dedicated telephone line(s)

Network outlet System emergency off (SEO), (recommended height 1.2m [48"] above floor)

X-Ray room warning light control panel

X-Ray ON lamp (L1) - 24V

Door interlock switch (needed only if required by state/local codes) Duplex hospital grade, dedicated wall outlet 120-v, single phase power

Duplex hospital grade, dedicated ceiling outlet 120-v, single phase power

ITEM DESCRIPTION

1 Main disconnect panel

2 Suitable bushings & lock nuts (Gantry)

3 Suitable bushings & lock nuts (System Cabinet)

4 Suitable bushings & lock nuts (Power Distribution Unit)

5 Suitable bushings & lock nuts (Operator's console)

6 4" x 4" x 4" [100 x 100 x 100] box (Partial UPS)

7 12" x 16" x 4" [300 x 400 x 100] box (Power Distribution Unit)

8 8" x 8" x 6" [200 x 200 x 150] box above ceiling for LCD Monitor

9 6" x 6" x 4" [150 x 150 x 100] box for LCD Monitor

10 2 1/2" [64] conduit below floor

11 3 1/2" [89] conduit below floor

8'-11"

9' -0

2'-3"

'-4

0'-10"

1'-4"

3'-4"

6'-4"

13'-9"

2'-6" 1'-3"

14'-5"

5' -1

Additional Conduit Runs (Contractor Supplied and Installed)

From (Bubble # / Item)

To (Bubble # / Item) Qty

Size In. mm

3 Phase Power 1 Main Disconnect Panel 1 As req'd As req'd

1 Main Disconnect Panel Emergency Off 1 1/2 13

7 Power Distribution Unit 1 As req'd As req'd

7 Power Distribution Unit Door Switch 1 1/2 13

Warning Light Control 1 1/2 13

Warning Light 1 1/2 13

1 Phase Power 1 1/2 13

1 Main Disconnect Panel 6 Partial UPS

1 1 1/4 30

7 Power Distribution Unit 1 2 50

8 SmartView Monitor 9 Operators Console 1 1 25

1 2 50

0' -3

TY

P.

A

B

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division E3 - Electrical Elevations 161/4"=1'-0"

±9'-6"

± T.B.D.

0'-0"

±9'-6"

± T.B.D.

0'-0"

1' -6

1' -0

2' -0

5' -0

FEEDER TABLE

Sub-Feeder length (MDP/PDB to PDU) MIN. SUB-FEEDER WIRE SIZE, AWG OR MCM (sq. mm)/VAC

380 VAC 400 VAC 420 VAC 440 VAC 460 VAC 480 VAC

15m (50ft) 3/0 (95) 3/0 (95) 3/0 (95) 2/0 (70) 2/0 (70) 2/0 (70)

GENERAL NOTES

In all cases qualified personnel must verify that the feeder (at the point of take-off) and the run to the CT system meet all the requirements stated in the PIM For a single unit installation, the minimum transformer size is 225KVa, with 2.4% rated regulation at unity power factor. Resultant maximum allowable feeder regulation is 3.6%. Note: Not applicable to 200kVA systems.

Grounding conductor will be a 1/0 minimum. this ground will run from the equipment back to the power source/main grounding point and always travel in the same conduit with the feeders

POWER REQUIREMENTS

· Power supply should come into a main disconnect panel (MDP) containing the protective units and controls.

· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.

· There must be discrimination between supply cable protective device at the beginning of the installation

(main low-voltage transformer side) and the protective devices in the MDP.

SUPPLY CHARACTERISTICS

· Power input must be separate from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).

· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.

· Phase imbalance 2% maximum.

· Transients must be less than 1500V peak. (on a 400V line)

· Maximum source regulation allowable is 6%. The combination of daily voltage variation (no load) and source regulation under full load shall not exceed + 10/-13% of nominal.

GROUND SYSTEM

· System of equipotential grounding.

· Equipotential: The equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE system units are located.

CABLES

· Power and cable installation must comply with the distribution diagram.

· All cables must be isolated and flexible, cable color codes must comply with standards for electrical installation.

· The cables from signaling and remote control (Y, SEO, L...) will go to MDP with a pigtail length of 1.5m, and will be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS

The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:

· Protecting cables against water (cableways should be waterproof).

· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts).

· Protecting cables against temperature shocks.

· Replacing cables (cableways should be large enough for cables to be replaced).

· Metal cableways should be grounded.

POWER SUPPLY

3 PHASES+G (4-Wire system, neutral not used) 380/400/420/440/460/480 V ± 10%

FREQUENCIES 50/60 Hz ± 3Hz MAXIMUM POWER DEMAND 200 kVA AVERAGE (CONTINUOUS) POWER DEMAND 11 kVA

POWER FACTOR 0.85

POWER DISTRIBUTION

SEO

WLC

DLK1

MDP

Main supply 3 phases 380/480 V Ground cable (PE)

PDU

(4) (1)

Cable SUPPLIED BY

CUSTOMER

Equipment SUPPLIED BY GE

Equipment SUPPLIED BY

CUSTOMER

Cable SUPPLIED BY GE

WL

1 phase power

2 no. 14 Black 2 no. 14 White 1 no. 14 Green

3 Black 1 Green

1 no. 14 Black 1 no. 14 White 1 no. 14 Green

2 no. 14 Black 1 no. 14 Red 1 no. 14 White

3 Black 1 Green

1 no. 14 Black 1 no. 14 White 1 no. 14 Green

1 no. 14 Black 1 no. 14 White 1 no. 14 Green

175 A

Partial UPS

MDP Main Disconnect Panel PDU Power distribution unit SEO Emergency OFF button (Control Room), located 1.50m

(4.9') above floor WLC Warning Light Control WL Warning Light DLK1 Door Interlock Switch (needed only if required by state/local codes)

Notes :

(1) Two dry contacts: "System ON" and "X-Ray ON", both released by PDU.

Max. voltage = 30 V

(2) If length < 10 m (32.8') Cable with 2m (6.6') extra length on the floor behind the back of PDU

(3) Cable with 2m (6.6') extra length on the floor behind the back of PDU

(4) Cable delivered with partial UPS installed by GE

(4)

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division E4 - Power Requirements 17

GE Supplied MDP options Revolution CT Revolution APEX

480, 460, 440 VAC E4502BE 125A E4502BG 175A

420, 400, 380 VAC E45021BC 160A E45021BG 200A

Minimum recommended circuit protection rating Revolution CT Revolution APEX

480, 460, 440 VAC 150kVA 125A N/A 480, 460, 440 VAC 200kVA 175A 175A 420, 400, 380 VAC 150kVA 150A N/A 420, 400, 380 VAC 200kVA 150A 200A

TYPICAL CABLE MANAGEMENT

CONDUIT IN THE FLOOR

NOT TO SCALE

INTERCONNECTIONS

23.80 m or 26.00 m [78.1' or 85.3']

PDB Can be ordered from GE

PDB

Customer supply

PDU13.20 m [43.3']

5.20 m [17.0']

7.50 m or 18.50 m [24.6' or 60.7']

22.80 m or 26.80 m [74.8' or 87.9'] OC

Gantry

Table

System Cabinet

11.50 m or 24.50 m [37.7' or 80.4']

12.80 m or 25.80 m [42' or 84.6']

21.00 m or 25.00 m [68.9' or 82']

0.91 m or 2.91 m [3' or 9.5']

Partial UPS

33.00 m [108.3']

CONTROL ROOMEXAM ROOM

AVIMOS

Camera (3x)

(Option) 30 m [98']

AVIMOS

Console (Option)

DateRev /18CT-M208377-FIN-00-A.DWG A 03/MAR/2022REVOLUTION APEXVA Puget Sound Health Care System Seattle Division E5 - Electrical Details - Interconnect 18

Sheets and Views
CT-M208377-FIN-00-A-C1 - Cover Sheet
CT-M208377-FIN-00-A-C2 - Disclaimer - Site Readiness Checklist
CT-M208377-FIN-00-A-A1 - General Notes
CT-M208377-FIN-00-A-A2 - Equipment Layout
CT-M208377-FIN-00-A-A3 - Radiation Protection
CT-M208377-FIN-00-A-A4 - Equipment Dimensions (1)
CT-M208377-FIN-00-A-A5 - Equipment Dimensions (2)
CT-M208377-FIN-00-A-A6 - Delivery
CT-M208377-FIN-00-A-S1 - Structural Notes
CT-M208377-FIN-00-A-S2 - Structural Layout
CT-M208377-FIN-00-A-S3 - Structural Details (1)
CT-M208377-FIN-00-A-S6 - Structural Details (2)
CT-M208377-FIN-00-A-M1 - HVAC
CT-M208377-FIN-00-A-E1 - Electrical Notes
CT-M208377-FIN-00-A-E2 - Electrical Layout
CT-M208377-FIN-00-A-E3 - Electrical Elevations
CT-M208377-FIN-00-A-E4 - Power Requirements
CT-M208377-FIN-00-A-E5 - Electrical Details - Interconnect