36C25926R0053_1 0003.pdf

PDF 336 KB Posted

Attached to
660-26-220 - Replace Furniture, Fixtures & Equipment for IPU
Solicitation number
36C25926R0053_1
Issued by

About this file

This document is Amendment 0003 to Solicitation 36C25926R0053 for Replace Furniture, Fixtures & Equipment for IPU at VA Salt Lake City Health Care System in Salt Lake City, Utah. The solicitation is issued by the Department of Veterans Affairs, Network Contracting Office 19 (Rocky Mountain Acquisition Center) located in Greenwood Village, Colorado. The amendment's purpose is to post Requests for Information (RFI) responses with appropriate attachments, confirm the proposal due date of Thursday, May 21, 2026, at 2:00 PM Mountain Time with submissions directed to Contract Specialist Blake Rowland at blake.rowland@va.gov, and include FAR 52.222-90 (Addressing DEI Discrimination by Federal Contractors) as a contract requirement. All other terms and conditions remain unchanged from the original solicitation.

The document includes seventeen contractor Q&As addressing technical specifications and implementation details for the IPU renovation project. Key clarifications cover plumbing fixture requirements (VA does not mandate specific brands but provided basis-of-design references for toilets and sinks, and requires pneumatic toilets and 24-volt control air-activated fixtures), ceiling panel systems (no sole source requirement; basis of design provided with acceptance of like items), lighting fixtures (ten 2' x 4' LED fixtures required with specific 22-Watt, 3250 Lumen, 3500K specifications and 0-10V dimmable drivers for gypsum ceiling areas), insulation (non-papered R19 for opened wall cavities), door frame replacement with wall repairs and repainting, over-the-door alarm hardware reuse conditions, heat detector installation requirements during ceiling removal, negative air venting (permitted to outside but not into patient courtyard areas), and field verification requirements for as-built drawings and door schedules. The amendment references four attached documents (Current As Builts, Door Handedness Guidance, IPU Courtyard Location, and Door Schedule) and a Past Performance Questionnaire to support bidder proposals.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25926R0053 0003

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0003 05-13-2026

660-26-220

36C259

Department of Veterans Affairs

Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300

Greenwood Village CO 80111

36C259

Department of Veterans Affairs

Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300

Greenwood Village CO 80111

To all Offerors/Bidders

36C25926R0053

04-06-2026

X

X X

Project: 660-26-220 - Replace Furniture, Fixtures & Equipment for IPU

The purpose of this solicitation amendment is to:

A. Post the RFIs and answers and include appropriate attachments.

B. The proposals are still due on Thursday, May 21, 2026, at 2:00 PM MT. Please send your proposals to the Contract

Specialist at blake.rowland@va.gov.

C. Include FAR 52.222-90.

All other terms and conditions remain the same.

Angela Waalkes

Contracting Officer

VA-VHA-RPOW-2024-0081

Department of Veterans Affairs VHA Network Contracting Office 19 Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300

Greenwood Village, CO 80111 for

VA Salt Lake City Health Care System Salt Lake City, UT 84148

Replace Furniture, Fixtures & Equipment for IPU CONTRACTOR Q&A’s

Question No. 1: Do you have a certain toilet and sink that you will want to use for this?

Part number specs?

Answer No. 1: VA has no sole source justification for the toilets and sinks, please provide plumbing fixtures that meet the requirements in the SOW. The basis of design was https://www.whitehallmfg.com/products/toilets and https://besafeprod.com/products/cs730-ligature-resistant-solid-surface-sink/ but like items shall be reviewed.

Question No. 2: Can the VA please release as-build drawings where drywall, drywall ceiling and grid ceiling are to be replaced? The as-build drawings would help aid in what utility items (electrical or medical outlets) need to be removed and re-installed and or replaced and not currently listed in the (SOW) under Tasks and Associated Deliverables.

Answer No. 2: As-built for the area has been added to the solicitation via attachment on amendment 0002 titled, “Att 6 Current As Builts”. Please note, this document is for reference only and field verifications will be required due to lack of red lines of changes.

Question No. 3: Does any Insulation need to be replaced in any of the walls or ceiling replacements? and if so, please indicate what is specifically needed.

Answer No. 3: Any wall opened by the contractor shall be insulated in that area that was opened by the contractor. If the contractor opens two cavities between studs the contractor shall insulate the 2 cavities with non-papered R19 insulation.

Question No. 4: If possible, please provide pictures of some of the restrooms for items being replaced, like the stainless-steel toilets?

Answer No. 4: Please see pictures below.

https://www.whitehallmfg.com/products/toilets https://besafeprod.com/products/cs730-ligature-resistant-solid-surface-sink/ https://besafeprod.com/products/cs730-ligature-resistant-solid-surface-sink/

Question No. 5: Are you reusing the locksets, or would you like to?

Answer No. 5: The only thing to be reused is the Schlage cores.

Question No. 6: Is there a brand name mental health grade panel system that the VA is using, that we should be using for reference for bidding purposes?

Answer No. 6: VA has no sole source justification for the ceiling panel system, please provide a ceiling panel system that meets the requirements in the SOW. The basis of design was https://www.gordon-inc.com/products/security/security-ceiling-systems-mental-health/winlok-secure-access-security-ceilings/ but like items shall be reviewed.

Question No. 7: Will the lights in the existing grid system work in the new mental health grade system? Some of the mental health grade systems have specific lights that go with the system so that they can be locked in.

Answer No. 7: Existing light fixtures must be integrated into the new ceiling panel system.

Question No. 8: The existing lights in the grid system can’t be re-used for the gypsum drywall ceiling system. Do we need to provide new light for these areas?

Answer No. 8: There is a total of ten 2’ x 4’ lighting fixtures within areas slated to receive a gypsum ceiling that will need to be replaced.

Please provide a lighting fixture that meets the following requirements. 22-Watt, 3250 Lumen, 3500K LED fixture, and must include a 0-10V dimmable driver. Light fixtures must be flush mounted in the ceilings, with tamper-resistant frames and break-resistant sealed lenses, securely fastened to the frame.

Question No. 9: Has the VA confirmed that the over-the-door alarms can be re-used and certified? We are being told this may not work with the new frames and doors. Please Advise?

Answer No. 9: Over-the-door alarm hardware can be reused if the door widths remain the same and if a LHR door is transitioning to an RH door or the inverse (RHR to a LH).

https://www.gordon-inc.com/products/security/security-ceiling-systems-mental-health/winlok-secure-access-security-ceilings/ https://www.gordon-inc.com/products/security/security-ceiling-systems-mental-health/winlok-secure-access-security-ceilings/

Locations that do not have this transition shall be handled as follows. Reuse room 1C12 hardware on room 1C14. Reuse room 1C14 hardware on room 1C12. Rooms 1C31C, 1C31B, and 1C23A shall remain LHR so that over-the-door alarm hardware may be reused. Room 1C17 needs to receive new over-the-door alarm hardware. See “Att 7 Door Handedness Guidance C- Wing” in solicitation amendment 002 for location reference.

Question No. 10: Will Starc walls meet the requirement for the hard wall between the 2 wings?

Answer No. 10: Starc walls will not meet the requirements for the hardwall between the 2 wings due to the increased security requirements of the location. This will be built with high impact drywall and will be reviewed during the submittal portion of the contract.

Question No. 11: Will temp heat detectors be required once the ceiling has been removed? If so, how many detectors will be required?

Answer No. 11: The contractor shall install heat detectors in similar areas the smoke detectors are in now but to the deck or rotate the sprinkler if the ceiling is out for longer than 10 hours within 10 inches of the deck above for the duration of the project ceiling being removed.

Question No. 12: Do the sinks and toilets have shut off valves?

Answer No. 12: The contractor should plan that there is not a shutoff valve per room and the wings shut down during work times of the water lines.

Question No. 13: Is there a way that we can vent to the outside with our neg air machines? If not, where are we to vent?

Answer No. 13: Yes, the contractor may vent to the outside of the building to generate negative pressure. Only restriction is that air cannot be vented into the central outdoor area used by the IPU patients. Please see the attached document “Att 8 IPU Courtyard Location” for reference in solicitation amendment 0002.

Question No. 14: Is there a place where we can set a dumpster?

Answer No. 14: A laydown location will be provided and established with the COR Post-Award.

Question No. 15: Where are we to tie in the power for the flush valves?

Answer No. 15: Existing plumbing fixtures are pneumatic toilets and 24-volt control air activated sinks. Plan to provide new plumbing fixtures that function the same. Tie in at the existing connection with the new plumbing fixtures.

Question No. 16: Just wanted to clarify that the door frames are being replaced.

Answer No. 16: Door frames are to be replaced. This will require the contractor to fix the walls and repaint them as needed.

Question No. 17: Does VA have a door schedule for the doors that will be replaced? Particularly door widths to ensure existing over-the-door alarm hardware can be reused on the new doors.

Answer No. 17: Please see “Att 9 Door Schedule” that shows door widths included in amendment 0002. This should be used for reference only and must be field verified.

A.1 52.222-90 Addressing DEI Discrimination by Federal Contractors

(a) Definitions. As used in this clause-

Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations;

or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting

(e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

(b) In connection with the performance of work under this contract, the Contractor agrees as follows:

(1) The Contractor will not engage in any racially discriminatory DEI activities;

(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the

Contractor or subcontractor may be declared ineligible for further Government contracts;

(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and

(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

A.2 List of Attachments

See attached document: Att 6 Current As Builts.

See attached document: Att 7 Door Handedness Guidance C-Wing.

See attached document: Att 8 IPU Courtyard Location.

See attached document: Att 9 Door Schedule.

See attached document: Past Performance Questionnaire.