This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Department of Veterans Affairs project. The amendment covers the solicitation for project 660-23-101 to rehabilitate domestic water lines, with key changes including a proposal due date extension and clarification of site safety requirements.
The proposal due date has been extended six calendar days from January 8th, 2026, to January 14th, 2026, at 10:00 AM Mountain Standard Time. A critical clarification was made regarding site safety: the Superintendent cannot "dual-hat" the Site Safety and Health Officer (SSHO) position and must provide a full-time SSHO with professional safety certification and at least 3 years of construction safety experience. Additionally, the amendment specifies that existing water lines not currently in roadways must be relocated into roadways during the installation process.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25926R0003 | 0002
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 12-30-2025 660-23-101 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25926R0003 11-24-2025
X X X The purpose of this action is to amend the solicitation for project 660-23-101 (Rehabilitate Domestic Water Lines).
See continuation page for answer to additional question received.
CONTINUATION PAGE
Questions and Answers Previously answered
1. Can you please extend the due date as the Holidays are current, and most suppliers and subcontractors will not be available for responsible pricing?
Due to supplier and sub-contractor concerns the proposal due date will be extended six (6) calendar days from January 8th, 2026, at 10:00 AM Mountain Standard Time (MST) to January 14th, 2026, at 10:00 AM MST.
1. Please confirm that the Superintendent can “dual-hat” the SSHO position (assuming they are fully qualified for both positions).
Specification 01 35 26, section 1.9 Site Safety and Health Officer (SSHO) and Competent Person (CP), Part A states: The Prime Contractor shall provide a Safety oversight team that includes a minimum of one (1) person at each project site, for each shift, to function as the Site Safety and Health Officer (SSHO).
The Prime Contractor shall provide a minimum of one “Full-Time” SSHO at each project site, for each shift (with no other duties) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience.
The Superintendent cannot “dual-hat” the SSHO position.
Additional Question Received
3. During the pre-bid site visit, it was stated that any water lines not currently located in the roadway must be relocated into the roadway. Additionally, the general notes on the drawings indicate that water corridors should be placed within roads wherever possible.
However, the plans appear to show the new water lines being installed in the same locations as the existing lines.
Could you please clarify whether relocation of existing water lines (that are not currently in roadways) into roadways is required, or if the proposed installation may follow the existing alignments as shown on the plans?
Relocation of existing water lines (not currently in roadways) into the roadways is required.