SUMMATION
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NEW PROJECT | NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| FINAL | OTHER |
| DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | NOTES | | | TOTAL |
| A | B | C | D | | | | | |
| | | | DIVISION 0-SPECIAL SECTIONS | | | | $ - 0 |
| | | | DIVISION 1-GENERAL REQUIREMENTS | | | | $ - 0 |
| | | | DIVISION 2-EXISTING CONDITIONS | | | | $ - 0 |
| | | | DIVISION 3-CONCRETE | | | | $ - 0 |
| | | | DIVISION 4-MASONRY | | | | $ - 0 |
| | | | DIVISION 5-METALS | | | | $ - 0 |
| | | | DIVISION 6-WOOD AND PLASTIC | | | | $ - 0 |
| | | | DIVISION 7-THERMAL AND MOISTURE PROTECTION | | | | $ - 0 |
| | | | DIVISION 8-DOORS AND WINDOWS | | | | $ - 0 |
| | | | DIVISION 9-FINISHES | | | | $ - 0 |
| | | | DIVISION 10-SPECIALTIES | | | | $ - 0 |
| | | | DIVISION 11-EQUIPMENT | | | | $ - 0 |
| | | | DIVISION 12-FURNISHINGS | | | | $ - 0 |
| | | | DIVISION 13-SPECIAL CONSTRUCTION | | | | $ - 0 |
| | | | DIVISION 14-CONVEYING EQUIPMENT | | | | $ - 0 |
| | | | DIVISION 21-FIRE SUPPRESSION | | | | $ - 0 |
| | | | DIVISION 22-PLUMBING | | | | $ - 0 |
| | | | DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING | | | | $ - 0 |
| | | | DIVISION 26-ELECTRICAL | | | | $ - 0 |
| | | | DIVISION 27-COMMUNICATIONS | | | | $ - 0 |
| | | | DIVISION 28-ELECTRONIC SAFETY AND SECURITY | | | | $ - 0 |
| | | | DIVISION 31-EARTHWORK | | | | $ - 0 |
| | | | DIVISION 32-EXTERIOR IMPROVEMENTS | | | | $ - 0 |
| | | | DIVISION 33-UTILITIES | | | | $ - 0 |
| | | | DIVISION 34-TRANSPORTATION | | | | $ - 0 |
| | | | | | SUB-TOTAL | | $ - 0 |
| | | | | | OVERHEAD | @ | $ - 0 |
| | | | | | PROFIT | @ | $ - 0 |
| | | | | | BONDS | @ | $ - 0 |
| | | | | | PROJECT TOTAL: | | $ - 0 |
&A
&D
Div 0 Special Sections
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 0 Special Sections | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&A
&D
Div 1 General Requirements
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Divison 1 General Requirements | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
Div 2 Existing Conditions
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 2 Existing Conditions | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&A
&D
Div 3 Concrete
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL |
| | | | Division 3 Concrete | | | | | | | | | | |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| | $0.00 | | $0.00 | $0 |
| Adjustments: | Local Market Conditions | | Small Business Utilization | | $0 |
| SECTION TOTAL: | | | | | $0 |
&A
&D
Div 4 Masonry
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 4 Masonry | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&A
&D
Div 5 Metals
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 5 Metals | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&A
&D
Div 6 Wood & Plastic
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 6 Wood & Plastic | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&A
&D
Div 7 Thermal & Moisture Protec
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 7 Thermal & Moisture Protection | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 8 Doors & Windows
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 8 Doors & Windows | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 9 Finishes
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 9 Finishes | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 10.00% | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 10 Specialties
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 10 Specialties | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 11 Equipment
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 11 Equipment | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 12 Furnishings
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 12 Furnishings | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 13 Special Construction
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 13 Special Construction | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Division 14 Conveying Equipment
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 14 Conveying Equipment | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 21 Fire Suppression
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 21 Fire Suppression | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 22 Plumbing
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 22 Plumbing | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 23 HVAC
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 23 Heat, Ventilating, and Air Conditioning | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 26 Electrical
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 26 Electrical | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 27 Communications
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 27 Communications | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 28 Electronic Safety & Secu
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 28 Electronic Safety & Security | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 31 Earthwork
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 31 Earthwork | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 32 Exterior Improvements
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 32 Exterior Improvements | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 33 Utilities
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 33 Utilities | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |
&D
Div 34 Transportation
PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE
| NO DESIGN | PRELIMINARY |
| COMPLETED | DESIGN |
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | | |
| | | | | | FINAL | OTHER |
| | | | | | DESIGN | (SPECIFY) |
| CODE | | | | SYSTEM/SUBSYSTEM | LABOR | | | | MATERIALS | | | | | | |
| A | B | C | D | | | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | | TOTAL | |
| | | | Division 34 Transportation | | | | | | | | | | | | |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | | | | | | $0.00 | | | | | $0.00 | | $0 |
| | | | Adjustments: | | Local Market Conditions | | | 0.00% | Small Business Utilization | | | | 0.00% | | $0 |
| | | | SECTION TOTAL: | | | | | | | | | | | | $0 |