This document contains a federal contract opportunity solicitation for correcting a research ventilation system at the Oklahoma City VA Health Care System. The solicitation seeks to remove and replace four existing exhaust fan units and associated components on the roof of a research facility. The contractor will be responsible for all demolition, removal and installation work required by the drawings, specifications and scope of work. The North American Industry Classification System code for this procurement is 238220 with a small business size standard of $16.5 million. The estimated value of the contract is between $500,000 and $1 million. This opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Interested parties must be verified as SDVOSBs by the Department of Veterans Affairs Center for Verification and Evaluation by the time of proposal submission. The point of contact listed can provide more details on the requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0066 0002.docx | DOCX document | |
| Pre-Bid Walkthrough 4-29-2021.pdf | ||
| 36C25921R0066 0001.docx | DOCX document | |
| Pre-Bid Walkthrough.pdf | ||
| SPEC Correct Research Ventilation System.docx | DOCX document | |
| Wage Determination OK 20210049.pdf | ||
| 36C25921R0066_1.docx | DOCX document | |
| M109-11PDG01 for Testing and Balancing Information.pdf | ||
| M108-11PDG01 for Testing and Balancing Information.pdf | ||
| M107-11PDG01 for Testing and Balancing Information.pdf | ||
| Existing ME-2-Penthouse and Roof Mech and Elec Plan.pdf | ||
| GREENHECK SPECS 2-9-2021.docx | DOCX document | |
| Existing S5-Roof Framing Building 19.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 635-22-148 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 To all Offerors/Bidders
36C25921R0066 04-15-2021
X X X
This amendment is created to provide Questions and Answers under RFI #1.
CONTINUATION PAGE
RFI #1
635-22-148 Correct Research Ventilation System
1. SOW states that the contractor must verify each location has one fan operational at one time on both the North and South EFU’s and at no time can both EFU’s on either side North or South can be un-operational. It also states that OKCMAMC will limit the time an EFU can be un-operational to a maximum of 72 hours down time for the facility. During the site visit is was discovered that both EFU’s on the North side are not operational, therefore we can change both of those fans as phase 1.
Since the 2 EFUs at the northside of the building, are no longer work and I have been consulted with VA research department, they have confirmed that all 4 EFUs can be replaced at the same time.
2. Will the facility allow for both South EFU’s to be taken offline at the same time if the North EFU’s have first been replaced and are fully operational?
See answer 1 above.
3. If both South EFU’s cannot be replaced at the same time, then will the facility allow shutdown of both EFU’s with up to the 72 hours to remove the existing dampers and install the new fan?
See answer 1 above.
4. Is the roof still made from the same material as shown in the original roof framing plans, or has the roof structure been modified or replaced?
The roof structure has not been modified or replaced but the build-up roof has been replaced.
5. Existing plans scheduled EF-2A and EF-2B with 10 HP fans, 17,930 CFM at 0.83” total static pressure. The Greenheck specs for the new fans have only one selection criteria with 15,753 CFM and 3.45” total static pressure. Please confirm that new fan selection criteria will change from the existing plans by making all 4 fans with the same performance and same motor size.
Confirm, the new fans 15,753 CFM at 3.45” total static pressure.
6. I noticed on the above solicitation you have designated the NAICS code of 237310 with a business size standard of $39.5M. I was wondering if this should be the NAICS code of 238220?
The correct NAICS for this project is 238220 Plumbing, Heating and A/C Control with a size standard of $39.5M
7. Please clarify - Integration of controls for new exhaust fans with the existing system.
Integration of control for new exhaust fans with the Johnson Control existing system.
8. Phasing – The north exhaust fans are currently not operational and can be removed at the same time. Once the north roof phase is complete and operational, can both south exhaust fans be removed/replaced at the same time?
See answer 1 above.
9. What sort of biomed/hazmat precautions/procedures need to be followed during construction?
There is no biohazard that have use in these exhaust systems in the past 5-year, wear glove and mask during demolition.
10. Regarding Specification 01 00 00 paragraph 1.2 General Intention, part A states “Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 7-Replacements of specified ATS’s as required by drawings and specifications.” This description doesn’t seem to match the scope of work as part of the solicitation, can parts A, B, and C be confirmed or updated?
Update Specification 01 00 00, paragraph 1.2 A. Contractor shall completely prepare site including demolition of 4 Exiting exhaust fan units (EFU) and accessories and replace with 4 new exhaust fan units as stated in scope of work and specifications.
11. Regarding Specification 01 00 00 paragraph 1.3 Statement of bid items, part A and B do not appear to match the scope of work as part of the solicitation, can this be confirmed or updated?
Deleted specification 01 00 00, paragraph 1.3 STATEMENT OF BID ITEM(S). Bid shall be as stated in SOW.
12. Regarding Specification 01 00 00 paragraph 1.5 Construction Security Requirements Part A, B and C. Please confirm the projects intent is to require a security plan and unarmed guards per parts A. B, and C as stated in this specification A. Security Plan is not required.
B. Contractor employee shall apply for badge to work in VA facility, coordinate with COR. COR will provide application form for badge.
C. Unarmed guards are not required.
13. Regarding Specification 01 35 26 Safety Requirements paragraph1.13 Tuberculosis screening. This paragraph illustrates the requirement for tuberculosis testing and the fact it needs to be completed 90 days prior to the employee being allowed onsite. With the short duration of this project could this requirement be confirmed and updated if needed?
Tuberculosis screening is not required.
14. 01 91 00 paragraph 1.7-part A states the systems to be commissioned included Electrical, Communication, and Electronic Safety and Security. This information does not appear to match the scope of work as part of the solicitation, can this be confirmed or updated?
Electrical, Electrical Safety, and electrical safety commission are not required.