36C25921R0066 0002.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C25921R0066
About this file
This document provides details for a federal contract solicitation to correct a research ventilation system at the Oklahoma City VA Medical Center. The solicitation seeks proposals to remove and replace four existing exhaust fan units and install four new roof curbs. Proposers must also modify two existing stainless steel plenums. The project value is between $500,000 to $1,000,000. The NAICS code is 238220 with a small business size standard of $16.5M. The solicitation is fully set aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by May 17, 2021. The pre-bid meeting notes provide additional site visit details. Apparent awardees must apply for verification from the VA Center for Verification and Evaluation. The contractor must begin work within 10 days of notice to proceed and complete within 120 days, complying with Davis-Bacon wage rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0066 0003.docx | DOCX document | |
| Pre-Bid Walkthrough 4-29-2021.pdf | ||
| 36C25921R0066 0001.docx | DOCX document | |
| Pre-Bid Walkthrough.pdf | ||
| SPEC Correct Research Ventilation System.docx | DOCX document | |
| Wage Determination OK 20210049.pdf | ||
| 36C25921R0066_1.docx | DOCX document | |
| M109-11PDG01 for Testing and Balancing Information.pdf | ||
| M108-11PDG01 for Testing and Balancing Information.pdf | ||
| M107-11PDG01 for Testing and Balancing Information.pdf | ||
| Existing ME-2-Penthouse and Roof Mech and Elec Plan.pdf | ||
| GREENHECK SPECS 2-9-2021.docx | DOCX document | |
| Existing S5-Roof Framing Building 19.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 635-22-148 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 To all Offerors/Bidders
36C25921R0066 04-15-2021
X X X
This amendment is created to provide Site Visit notes and attendance for the second site visit on April 29,2021.
CONTINUATION PAGE
Pre-Bid Meeting
FOR
635-22-148 Correct Research Ventilation System The purpose of this project is to remove and replace four existing exhaust fan units and to supply and install 4 factory roof curbs for mounting the new exhaust fan units safely and securely to the Research Facility Roof. Contractor shall also be required to modify the two existing stainless steel plenums by removing two existing plenum dampers from each of the two existing stainless steel plenums located between exhaust fan units 1A and 1B on the North end and exhaust fan units 2A and 2B on the South end of the Research Facility roof. Contractor shall be responsible for identifying and replacing all equipment, parts and labor required to correct the Research Facility Ventilation System.
All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.
Location: Oklahoma City VA Medical Center
AGENDA:
1. Introduction of Ilze Karklins-Powers CO and Kreingsak Veeraprame (Saky) COR
1. The pre-bid meeting/site walk is not mandatory
1. QUESTIONS During site visit MUST BE WRITTEN DOWN
1. Address where to send RFQ:
3. Electronic submissions to ilze.karklins-powers@va.gov
1. Pertinent Dates:
4. Questions are due by COB May 5, 2021. Please submit to ilze.karklins-powers@va.gov
4. I’ll get the answers back to you as quickly as possible
4. Proposals due on May 17, 2021 no later than 1:00 PM MT via email.
1. Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.
1. Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.
1. Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.
1. Confirmation of construction range is between $500,000 and $1,000,000.
1. Bid Guarantee & Payment/Performance Bonds: are required
1. Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 120 days.
1. Post Award Compliance:
11. Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.
See attached document: Pre-Bid Walkthrough 4-29-2021.
File details come from the government source that posted it. Updated .