About this file

This pre-solicitation notice provides details for replacing an air-cool chiller at the Lawton Outpatient Clinic in Lawton, Oklahoma. The Department of Veterans Affairs will accept proposals until May 4, 2021 to replace an existing 100-ton Trane air-cool chiller with a new unit. The project is set aside for service-disabled veteran owned small businesses and has an estimated value between $250,000 to $500,000. Offerors must provide specifications for the proposed chiller unit, including make, model, data characteristics, and lead time for delivery. The selected contractor will be responsible for removal of the old chiller, installation of the new unit, and all associated chilled water piping and electrical work. The contractor must also connect the new chiller to the existing Johnson Controls HVAC control system.

View the file

Other files

File Type Posted
36C25921R0064 0007.docx DOCX document
Amended SOW.pdf PDF
36C25921R0064 0006.pdf PDF
RFI 2 Answers.pdf PDF
36C25921R0064 0005.pdf PDF
RFI1 Chiller Lawton.pdf PDF
260526 Ground and Boning.pdf PDF
Clinic Chiller Pre-Bid Sign in.pdf PDF
260511 Requirement for Electrical Installation.pdf PDF
260519 Low Voltage Electrical Power Conductors and Cables.pdf PDF
36C25921R0064 0003.pdf PDF
36C25921R0064 0004.pdf PDF
A004 WD Comanche Couty OK 4_9_2021.docx DOCX document
WD OK20210049 April 9 2021.pdf PDF
36C25921R0064 0002.pdf PDF
36C25921R0064 0001.pdf PDF
013323 Shopdrawings.pdf PDF
H10-Floor Plan Piping LAWTON.pdf PDF
236400 Packged Chiller.pdf PDF
013526 Safety.pdf PDF
36C25921R0064 full solicitation.docx DOCX document
230800 COMMISSIONING HVAC.pdf PDF
010000 General Requirement.pdf PDF
H12-Large Scale Mechanicl Floor Plans LAWTON.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Presolicitation Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Presolicitation Notice

Z2DA

(CON) *635 - OKLAHOMA CITY VAMC Replace Lawton Outpatient Clinic Air Cool Chiller (VA-21-00046407) 80111 36C25921R0064 05-04-2021 14:00

CENTRAL TIME, CHICAGO, USA

N

SDVOSBC

238220 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 aldo.girany@va.gov Lawton Outpatient Clinic located on Ft Sill OK

· Veteran Affairs Healthcare Systems (VA HCS) Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK

I. GENERAL: THIS IS A PRESOLICITATION NOTICE THE FULL SOLICITATION WILL BE POSTED ON or AFTER 3/31/2021 Construction Replace Chiller

NAICS CODE 238220 Size Standard $16.5M

This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside.

Magnitude; $250,000.00 - $500,000.00

This will be a Brand Name or Equal solicitation

Proposal must include make, model and data characteristics of Chiller proposed. Also the lead time for delivery of the chiller unit being proposed must be included in proposal. Any proposal received without that information will be determined to be nonresponsive and will not be considered.

A. This project is to replace existing 100 tons Trane air cool chiller with new 100 tons air cool chiller located at Lawton Outpatient Clinic, Lawton, Oklahoma.

B. The contractor is fully responsible for verifying and validating all information contained within this statement of work. Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site.

C. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances.

D. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified.

E. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA Medical Center.

F. VA facilities are tobacco free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor’s compliance with this policy.

G. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards.

The contractor shall provide supervision, manpower, and materials turnkey to replace existing Trane air cool chiller with new 100 tons air cool chiller. Contractor shall provide including but not limit to the following:

1. Disconnect power and tagout logout electrical to existing Trane air cool chiller.

2. Drain water from existing Trane air cool chiller and disconnect existing chilled water piping from existing Trane air cool chiller.

3. Lift existing Trane air cool chiller up to trailer and remove from site.

4. Set new 100 tons air cool chiller packet with circulation pump on the existing chiller pad.

5. Contractor shall replace existing butterfly valves at existing chilled water supply and return piping.

6. Necessary retrofit existing chilled water piping to accommodate new air cool chiller chilled water piping connection and connect existing chilled water piping to new air cool chiller chilled water piping connection.

7. Retrofit Chilled water piping at the existing chilled water pump with bypass butterfly valve around the existing chilled water pump. Valve and piping configuration to isolate the existing chilled water pump for future use. On-board pump package in new air cool chiller will be used to pump chilled water through existing chilled water piping loop.

8. Insulate new chilled water piping with fiberglass insulation and aluminum jacket.

9. Install junction box for new air cool chiller at the existing chiller pad and connect power to new air cool chiller.

10. Install heat trace cable on new piping section to prevent freezing.

11. The existing air cool chiller controls by Johnson controls Building HVAC control in the facility, connect Johnson Controls to new air cool chiller.

12. After the installation of new air cool chiller completed, factory start up shall perform and put new air cool chiller in operation.

13. The new replacement 100 tons air cool chiller is based on Trane air cool chiller Model CGAM. The other air cool chiller manufacture can be used if their air cool chiller meets specification section 23 64 00 and Trane air cool chiller Model CGAM specifications or exceeds.

14. The existing air cool chiller concrete pad can be reused, if the dimension of existing concrete pad is sufficiency to support new air cool chiller. There is some repair may require.

15. Should the new air cool chiller dimension is bigger than existing concrete pad, the contractor shall enlarge the existing concrete pad for supporting new air cool chiller.

16. Contractor may provide temporary air cool chiller and electric generator during the replacement of the air cool chiller. The temporary air cool chiller should provide chilled water 120 gpm at 45 deg-F. The temporary air cool chiller and electric generator shall be bid as an option.