36C25921R0064_1.docx
DOCX document 24 KB Posted
- Attached to
- Z2DA--(CON) *635 - OKLAHOMA CITY VAMC Replace Lawton Outpatient Clinic Air Cool Chiller (VA-21-00046407)
- Solicitation number
- 36C25921R0064
About this file
This pre-solicitation notice provides details for replacing an air-cool chiller at the Lawton Outpatient Clinic in Lawton, Oklahoma. The Department of Veterans Affairs will accept proposals until May 4, 2021 to replace an existing 100-ton Trane air-cool chiller with a new unit. The project is set aside for service-disabled veteran owned small businesses and has an estimated value between $250,000 to $500,000. Offerors must provide specifications for the proposed chiller unit, including make, model, data characteristics, and lead time for delivery. The selected contractor will be responsible for removal of the old chiller, installation of the new unit, and all associated chilled water piping and electrical work. The contractor must also connect the new chiller to the existing Johnson Controls HVAC control system.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Presolicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Presolicitation Notice
Z2DA
(CON) *635 - OKLAHOMA CITY VAMC Replace Lawton Outpatient Clinic Air Cool Chiller (VA-21-00046407) 80111 36C25921R0064 05-04-2021 14:00
CENTRAL TIME, CHICAGO, USA
N
SDVOSBC
238220 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 aldo.girany@va.gov Lawton Outpatient Clinic located on Ft Sill OK
· Veteran Affairs Healthcare Systems (VA HCS) Project # 635-21-114, Replace Lawton Outpatient Clinic Air Cool Chiller at Lawton, OK
I. GENERAL: THIS IS A PRESOLICITATION NOTICE THE FULL SOLICITATION WILL BE POSTED ON or AFTER 3/31/2021 Construction Replace Chiller
NAICS CODE 238220 Size Standard $16.5M
This solicitation will be a Service-Disabled Veteran Owned Small Business Set-Aside.
Magnitude; $250,000.00 - $500,000.00
This will be a Brand Name or Equal solicitation
Proposal must include make, model and data characteristics of Chiller proposed. Also the lead time for delivery of the chiller unit being proposed must be included in proposal. Any proposal received without that information will be determined to be nonresponsive and will not be considered.
A. This project is to replace existing 100 tons Trane air cool chiller with new 100 tons air cool chiller located at Lawton Outpatient Clinic, Lawton, Oklahoma.
B. The contractor is fully responsible for verifying and validating all information contained within this statement of work. Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site.
C. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances.
D. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified.
E. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA Medical Center.
F. VA facilities are tobacco free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor’s compliance with this policy.
G. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards.
The contractor shall provide supervision, manpower, and materials turnkey to replace existing Trane air cool chiller with new 100 tons air cool chiller. Contractor shall provide including but not limit to the following:
1. Disconnect power and tagout logout electrical to existing Trane air cool chiller.
2. Drain water from existing Trane air cool chiller and disconnect existing chilled water piping from existing Trane air cool chiller.
3. Lift existing Trane air cool chiller up to trailer and remove from site.
4. Set new 100 tons air cool chiller packet with circulation pump on the existing chiller pad.
5. Contractor shall replace existing butterfly valves at existing chilled water supply and return piping.
6. Necessary retrofit existing chilled water piping to accommodate new air cool chiller chilled water piping connection and connect existing chilled water piping to new air cool chiller chilled water piping connection.
7. Retrofit Chilled water piping at the existing chilled water pump with bypass butterfly valve around the existing chilled water pump. Valve and piping configuration to isolate the existing chilled water pump for future use. On-board pump package in new air cool chiller will be used to pump chilled water through existing chilled water piping loop.
8. Insulate new chilled water piping with fiberglass insulation and aluminum jacket.
9. Install junction box for new air cool chiller at the existing chiller pad and connect power to new air cool chiller.
10. Install heat trace cable on new piping section to prevent freezing.
11. The existing air cool chiller controls by Johnson controls Building HVAC control in the facility, connect Johnson Controls to new air cool chiller.
12. After the installation of new air cool chiller completed, factory start up shall perform and put new air cool chiller in operation.
13. The new replacement 100 tons air cool chiller is based on Trane air cool chiller Model CGAM. The other air cool chiller manufacture can be used if their air cool chiller meets specification section 23 64 00 and Trane air cool chiller Model CGAM specifications or exceeds.
14. The existing air cool chiller concrete pad can be reused, if the dimension of existing concrete pad is sufficiency to support new air cool chiller. There is some repair may require.
15. Should the new air cool chiller dimension is bigger than existing concrete pad, the contractor shall enlarge the existing concrete pad for supporting new air cool chiller.
16. Contractor may provide temporary air cool chiller and electric generator during the replacement of the air cool chiller. The temporary air cool chiller should provide chilled water 120 gpm at 45 deg-F. The temporary air cool chiller and electric generator shall be bid as an option.
File details come from the government source that posted it. Updated .