36C25920Q0172-0003002.pdf
PDF Posted
- Solicitation number
- 36C25920Q0172
About this file
36C25920Q0172 0003 P09 - PWS Access Control Security System FINAL (0003).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25920Q0172-0003000.docx | DOCX document | |
| 36C25920Q0172-0003001.pdf | ||
| 36C25920Q0172-0002005.pdf | ||
| 36C25920Q0172-0002004.docx | DOCX document | |
| 36C25920Q0172-0001001.pdf | ||
| 36C25920Q0172-0001000.docx | DOCX document | |
| 36C25920Q0172-002.pdf | ||
| 36C25920Q0172-001.pdf | ||
| 36C25920Q0172-003.pdf | ||
| 36C25920Q0172-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement MSCC (Member Services Call Center)
Access Control & CCTV System
1. GENERAL: The Veterans Health Administration – Member Services Call Center (VHA-MSCC) located at 409 Pershing Court Fort Riley, KS 66442 is seeking to obtain a qualified Contractor who can demonstrate the required capability to provide and install a complete Access Control Security System (ACSS). located at 409 Pershing Court, Fort Riley Kansas. The goal of this acquisition is to ensure the security of our facility and provide a safe work environment for staff.
1.1 Description of Services: The Contractor shall provide all management, personnel, plant, labor, supplies, tools, equipment, communication devices, transportation, and fuel necessary to perform the installation of a complete ACSS to the standards defined in this PWS (Performance Work Statement).
1.2 Background: The VHA-MSCC is located in a historical, 3-story building at 409 Pershing Court Fort Riley, KS 66442. The building is being remodeled and will have the necessary boxes and conduits in place for the installation. Building 409 has three stories and a basement, consisting of open office spaces, private offices, public restrooms, breakrooms, conference room, training room, and an elevator. Total square footage of the building is approximately 35,000 square feet.
1.3 Objectives: Obtain a qualified contractor to provide and install a fully operational Access Control Security System for the MSCC located at 409 Pershing, Fort Riley Kansas.
1.4 Scope: The Contractor shall provide and install all access control devices and support hardware at each designated door/entry way. Contractor shall also provide and install security cameras at each designated interior and exterior location. Access control devices and CCTV cameras will be connected to the existing Software House iStar Ultra ACSS panels located in Electrical Room 107 (i.e. basement & 1st floor) and Electrical Room 208 (i.e. 2nd floor), all shall be fully operational to the standards in this PWS. ACSS computer (Windows 10) and CCure 9000, Version 2.70 software are government provided. Footage and item quantities are estimates and it is recommended contractor field verify.
1.5 Period of Performance: The period of performance shall be 12 months. The period of performance date range shall be 03/30/2020 thru 03/29/2021.
1.5.1 Place of Performance: The place of performance for this project is 409 Pershing Court Fort Riley, KS 66442.
1.5.2 Site Visits: Site visits will be held on Tuesdays, February 18th & February 25th, 2020 at 10:00am CST. Site visit will be located at 409 Pershing Ct, bldg. 409, Ft. Riley, KS. All questions concerning the site visit shall be directed to the COR Ricky Postlewait, Email: Ricky.Postlewait@va.gov Phone:785-633-6679.
1.6. General Information
1.6.1 Federal Observed Holidays and Military Training Holidays: Do not schedule work on Federal holidays or days observed in lieu thereof. The Federal holidays listed below are observed. When a holiday falls on a Sunday, the following Monday will be observed as the holiday. When the holiday falls on a Saturday, the preceding Friday will be observed as the holiday. When a service is required fewer than three times per week and the time for that service falls on a holiday the work shall be accomplished on the day following or preceding the holiday.
New Year's Day Labor Day Martin Luther King's Birthday Columbus Day mailto:Ricky.Postlewait@va.gov mailto:Ricky.Postlewait@va.gov
Presidents' Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.2 Hours of Operation
1.6.2.1 All Buildings: The Contractor shall schedule all normal work requirements to be performed during the hours of 6:30 a.m. to 4:00 p.m., Central Standard Time (CST), Monday through Friday, unless advanced coordination is made and approved between the Contractor and the Contracting Officers Representative (COR).
1.6.2.2 Facility Severe Weather Closure: If the VHA facility is closed due to emergencies, administrative closings, or severe weather strikes prior to the workday, Contractor employees shall listen to one of the local radio and television stations for operations announcements regarding Fort Riley closures. Installation closures are reported by Fort Riley Operations Center (FROC) at 785-239-3700 or 785-240-2798. The toll-free number for the FROC is 866-562-7319. Closures are available on the Fort Riley Website at http://www.riley.army.mil/AboutUs/Advisories.aspx and shall be verified with the COR.
1.6.2.3 Installation Closure: When an Installation closure occurs on a regularly scheduled day of work, the Contractor shall, upon direction of the COR:
• Perform the work on the following work day.
• Reschedule the work on any day satisfactory to the COR and the Contractor.
1.6.3 Quality Control: Quality control is the Contractor’s responsibility. Contractor quality controls are how the Contractor assures the services are accomplished in accordance with (IAW) contract documents. The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed IAW this PWS and associated documents.
1.6.3.1 Documentation: The contractor shall prepare, submit, and maintain copies of QC inspection schedules and QC inspection reports of all QC activities. Contractor shall develop the necessary schedule format and inspection report forms and submit to the COR. These reports shall include factual evidence that inspections had taken place, deficiencies were noted, and corrective action was taken to correct the deficiencies.
1.6.4 VA Quality Assurance: The VHA is responsible for quality assurance and will monitor the Contractor’s performance under this PWS. The COR is the VHA’s Quality Assurance Evaluator.
1.6.5 Type of Contract: The VHA will award a Firm Fixed-Price service contract.
1.6.6 Security Requirements: Contractor personnel and/or sub-contractor personnel must follow specifications located below in Paragraph 1.6.13, Antiterrorism (AT) and Operations Security (OPSEC) Requirements.
1.6.6.1 Key Control: All references to keys include key cards. If required, the Contractor shall establish and maintain a key control system to ensure that VHA keys and key cards issued to the Contractor are not lost, stolen, or used by unauthorized persons. The COR and Contractor will conduct an initial inventory on all keys and key cards prior to the start of contract performance. No keys issued to the Contractor by the VHA shall be duplicated.
The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys or key cards to the COR. The Contractor and COR shall review and inventory all keys and key cards issued to Contractor annually.
1.6.6.1.1 Lost Keys: Lost keys shall be reported to the COR and the CO.
http://www.riley.army.mil/AboutUs/Advisories.aspx http://www.riley.army.mil/AboutUs/Advisories.aspx
1.6.6.1.2 Unauthorized Use of Keys: The Contractor shall prohibit the use of VHA issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas.
1.6.6.2 Lost and Found Property: Turn in all articles of possible personal or monetary value found by the Contractor's employees while performing duties under this contract to the COR. Obtain receipts for articles turned into the COR.
1.6.7 Contractor Employees
1.6.7.1 Qualifications: Contractor and sub-contractors shall possess licenses as required by state and local jurisdictions; shall demonstrate relevant years of experience installing and/or performing maintenance with Software House iStar Ultra ACSS panels and CCURE 9000, Version 2.30 software (Tyco Security Products) for identified systems; shall possess certificates as identified below. Industrial Security Systems shall possess factory training and awarded factory certification at time of proposal for identified systems; shall demonstrate field capability to install and maintain identified systems, shall demonstrate capability to service CCTV’s, and shall provide training and certification records as part of the quote provided.
a. Contractor shall be certified in Software House iStar Ultra control panel. Contractor must be able to provide proof of certifications.
b. Contractor shall be certified in CCure 9000, Version 2.30 (Tyco Security Products) . Contractor must be able to provide proof of certifications.
c. Contractor shall ensure each individual employee has at least 2 years’ experience as it relates to this project, which includes but is not limited to installing and/or performing maintenance with Software House iStar Ultra ACSS panels and CCURE 9000, Version 2.30 software (Tyco Security Products), installing and maintaining security systems, and servicing CCTV’s.
1.6.8 Post-Award Conference and Periodic Progress Meetings: The selected Contractor shall attend a post-award meeting organized and scheduled by the COR (i.e. Ricky Postlewait). The COR is responsible for coordinating this meeting with the selected Contractor and any subsequent progress meetings etc. In addition, if the COR believes circumstances require the attendance of the CO then it is the COR’s responsibility to coordinate with the CO and the Contractor.
1.6.9 Contracting Officer’s Representative (COR): The COR is an authorized representative of a CO within the scope of his or her authority and is not authorized to change any terms and conditions of the resulting contract.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates, after contract award. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including VHA drawings, designs, and specifications; monitor Contractor's performance and notifies both the CO and Contractor of any deficiencies; coordinate availability of VHA furnished property, and provide site entry of Contractor employees.
1.6.10 Key Personnel: The Contractor shall provide an employee point of contact who shall be responsible for the performance of the work. The employee shall have full legal authority to act for the Contractor on all work matters relating to daily operations of this Project. The individual shall be available between 6:30 a.m. to 4:00 p.m., CST, Monday through Friday except Federal holidays or when the VHA facility is closed.
1.6.11 Identification of Contractor Employees: All Contractor employees shall wear personal identification cards, or badges, while working on the Installation, to avoid creating an impression that they are VHA officials.
Identification cards shall always be a minimum 3-1/2 by 2-1/4 inches and clearly visible and shall display at a minimum:
• name of contract
• Contractor's name (legal name under which the Contractor is doing business)
• contract number
• Contractor's phone number
• worker's name,
• color photograph of worker (full face),
• issue date,
• contract expiration date.
1.6.12 Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the VHA. The Contractor shall ensure their personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure no Contractor employees conduct political related activities or events on the Installation.
Contractor shall ensure Contractor employees conduct themselves in a courteous and professional manner at all times and are dressed appropriately for the functions they perform, including shirts, pants, shoes, socks, and personal safety clothing and equipment. All clothing shall be neat, clean and free of stains, tears or offensive language, symbols, or graphics. Hoodies are permitted, but hoods must be down within the facilities. Contractor uniforms are not required. It is suggested the Contractor design and encourage its employees to wear work shirts, jackets, or coats with the Contractor’s corporate logo displayed on the garments. Use of personally owned cell phones in VHA facilities during contract performance is prohibited.
The VHA reserves the right to require removal of a Contractor employee from the job site who endangers persons or property or whose continued employment is inconsistent with VHA security, military security, or mission accomplishment. The VHA reserves the right to refuse to permit any Contractor employee to perform services under this contract who is not in compliance with this contract. Failure of an employee to gain access to, or removal of an employee from, the Installation due to the above will not relieve the Contractor of any work required by this contract.
1.6.13 Antiterrorism (AT) and Operations Security (OPSEC) Requirements:
1.6.13.1 Antiterrorism (AT) Level I Awareness Training: This provision/contract text is for Contractor employees with an area of performance within an Army-controlled Installation, facility or area. All Contractor employees, including subcontractor employees, requiring access to Army Installations, facilities, or controlled access areas shall complete AT Level I awareness. AT Level I awareness training is available at https://atlevel1.dtic.mil/at. AT Level 1 Training can also be coordinated with the ATO at (785) 239-6303. This is an annual requirement.
https://atlevel1.dtic.mil/at https://atlevel1.dtic.mil/at https://atlevel1.dtic.mil/at https://atlevel1.dtic.mil/at
1.6.13.2 Access and General Protection/Security Policy and Procedures: All Contractor employees shall comply with applicable Installation, VHA facility, and area commander Installation/facility access and local security policies and procedures. The Contractor shall provide all information required for employee background checks to meet Installation access requirements to be accomplished by Installation Police Department, Director of Emergency Services, or Security Office. Contractor employees must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the VHA may require changes in Contractor security matters or processes.
1.6.13.3 iWATCH Program Information: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO at (785) 239-6303). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. Training shall be completed within 15 calendar days of contract award or within 15 calendar days of new employees commencing performance to ensure compliance with the terms and conditions of the contract.
1.6.13.4 Operations Security (OPSEC) Awareness Training: All Contractors working on military installations must be aware of OPSEC and understand how OPSEC complements traditional security programs.
Per Army Regulation 530-1, all Contractor employees, including subcontractor employees, requiring access to Army Installations, facilities, or controlled access areas shall complete OPSEC Awareness training. Training is available at http://cdsetrain.dtic.mil/opsec or by contacting the Installation OPSEC officer at (785) 240-6127.
1.6.14 Emergency Medical Treatment: Emergency medical treatment and services for Contractor employees is the responsibility of the Contractor. The VHA will not provide occupational health or industrial hygiene services to Contractor employees.
The Contractor shall have competent employees trained and capable of dealing with minor employee injuries.
Contractor employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall, in turn, notify the CO or COR within 30 minutes of the incident.
Emergency medical treatment is available at Irwin Army Community Hospital, 650 Huebner Rd. Emergency medical expenses for contractor personnel are the contractor’s responsibility.
1.6.15 Installation Access:
1.6.15.1 Contractor and Vendor Access: Fort Riley is a guarded secure military Installation. All Contractor and vendor personnel, whether operating their privately-owned vehicles or motorcycles or Contractor or vendor-furnished vehicles and equipment, must enter the Installation through one of the secure access control points (ACPs) except as described in paragraph 1.6.21.3 below. Under the present Installation Force Protection Condition (FPCON), vehicle and equipment operators and passengers must possess only a valid photo identification card to access the Installation. Vehicle and equipment operators must also possess and be ready to show a valid state driver's license, current vehicle registration, and proof of state required minimum liability insurance. As determined by the Installation FPCON, an elevated FPCON may require additional security screening and/or limited Installation access.
1.6.15.2 RAPIDGate Program: Contractor and vendor personnel participating in RAPIDGate may enter through any of the Installation’s ACPs during their regular operating hours of 5:00 a.m. and 7:00 p.m. CST, except as described in paragraph 1.6.21.3 below. RAPIDGate is a voluntary access protocol used by the Installation to help expedite access to the Installation without having to undergo additional security screening.
There is a fee to participate in RAPIDGate and the VHA will not reimburse Contractor or vendor personnel for http://cdsetrain.dtic.mil/opsec http://cdsetrain.dtic.mil/opsec the associated cost. To learn more about or to enroll in the RAPIDGate program, call 877-RAPIDGate (877-727- 4342) or visit http://www.eidpassport.com. Contractors and vendors without RAPIDGate passes can access the Installation IAW paragraph 1.6.21.3 below.
1.6.15.3 Commercial Delivery Vehicles and Equipment: All commercial delivery vehicles and equipment must enter the Installation through the 12th Street ACP or the Estes Road ACP between the hours of 5:00 a.m. to 7:00 p.m. CST, Monday through Friday; Federal holidays are exempted. When entering from either the 12th Street or Estes Road gates, commercial traffic will be directed to the search areas located to the north of 12th Street and the south of Estes Road. Commercial vehicles are those vehicles over one ton used for a commercial purpose, including: semi-trucks with trailers, UPS trucks, U-Haul trucks operated by Contractors and used for commercial purposes, tow-trucks responding on-post to a request for assistance, and construction vehicles. Non- Commercial vehicles include: half-ton pickups with boat, U-Haul truck operated by soldiers who are moving as part of a permanent change of station, or recreational vehicles operated by soldiers or civilians visiting post.
There will be no commercial delivery vehicles allowed on the Installation on Sundays and Federal holidays.
Exception – concrete and asphalt paving delivery trucks participating in RAPIDGate may still enter through any of the Installation’s ACPs during their regular operating hours. Other exceptions must be coordinated through the Garrison Command (GC) and Directorate of Emergency Services (DES). All other Contractor, vendor, and commercial delivery vehicles may enter through any of the Installation's ACPs during their regular operating hours. As determined by the Installation FPCON, an elevated FPCON may require all Contractor, vendor, and commercial delivery vehicles to enter through the 12th Street ACP only.
1.6.16 Vehicle Identification: Contractor vehicles, privately-owned vehicles and equipment shall bear the Contractor’s or subcontractor's name or logo while the vehicles and equipment are working on the Installation.
Names or logos shall be displayed on a viewable dashboard sign as a minimum.
1.6.17 Vehicle Operator Requirements: Contractor employees shall comply with all applicable requirements of FR Reg 190-5 during performance of this contract. Contractor employees shall possess a valid state driver's license, current vehicle registration, and proof of state required minimum liability insurance to operate Contractor-furnished or their privately-owned vehicles and motorcycles on the Installation. It is in violation of FR Reg 190-5 to use a cellular phone without a hands-free device while operating a vehicle on the Installation. Vehicle operators must safely pullover and come to a complete stop before using a cellular phone without a hands-free device or text messaging. Violation of this regulation will result in a fine of $75 or as revised.
1.6.18 Accessibility: When facility is inaccessible, immediately contact the COR or VHA Supervisor for access.
1.6.19 Safety Compliance - VHA Versus Contractor Responsibilities
1.6.19.1 Warning Signs: Display warning signs in all areas where Contractor operations may cause traffic obstructions or personal hazards. All signs shall be placed so that they are visible from all approaches.
1.6.19.2 Accessibility: Hallways, stairways, entrances, and doorways shall not be obstructed by any maintenance operations or storage of equipment or materials.
1.6.19.3 Furniture, Equipment and Materials:
1.6.19.4 Storage of Equipment: Equipment shall be stored in space provided by the VHA. Equipment shall be secured or removed from the buildings when not being used.
http://www.eidpassport.com/ http://www.eidpassport.com/
2. DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2.1 Definitions: As used throughout the contract or in material referenced in the contract, the following terms will have the meanings set forth below:
• Contract Discrepancy Report (CDR) - A formal, written documentation of Contractor nonconformance or lack of performance for contracted work.
• Contracting Officer’s Representative (COR) - An employee of the VHA appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.
This individual does NOT have authority to change the terms and conditions of the contract.
• Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the VHA.
The term used in this contract refers to the prime.
• Deficiency - A shortcoming in the quality or state of service performed.
• Equipment - A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
• Fiscal Year (FY) - The period of 1 October to 30 September each year.
• VHA-Furnished Property (GFP) - Property owned and furnished by the VHA for Contractor or resident use without charge or on a reimbursable basis as indicated in the contract.
• VHA-Furnished Service (GFS) - Service furnished by the VHA for Contractor or resident use without charge or on a reimbursable basis as indicated in the contract.
• VHA Property - All property owned or leased by the VHA. VHA property includes both VHA-furnished property and contractor-acquired property. VHA property includes material, equipment, special tooling, special test equipment, and real property. VHA property does not include intellectual property and software.
• Key Personnel - Contractor employees that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.
• Loss of VHA Property - Unintended, unforeseen or accidental loss, damage, or destruction of VHA property that reduces the VHA’s expected economic benefits of the property. Loss of VHA property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of VHA property includes but is not limited to:(1) Items that cannot be found after a reasonable search; (2) Theft: (3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or (4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
• Material - Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item.
Material does not include equipment, special tooling, and special test equipment or real property.
• Performance Requirements Summary - Identifies the key service outputs of the contract that will be evaluated by the VHA to assure contract performance standards are met by the Contractor.
• Physical Security - Actions that prevent the loss or damage of VHA property.
• Property - All tangible property, both real and personal.
• Quality Assurance (QA) - The VHA procedures to verify that services being performed by the Contractor are performed according to acceptable standards and meets the requirements of the contract.
• Quality Control (QC) - All necessary measures taken by the Contractor to ensure the quality of an end product or service shall meet contract requirements.
• Standard - An acknowledged measure of comparison.
• Subcontractor - One that enters into a contract with a prime contractor. The VHA does not have privity of contract with the subcontractor
• Submittal - Anything that can be physically submitted or delivered, but may include non-manufactured things such as meeting minutes or reports
• Trash - The unwanted or discarded material resulting from commercial and industrial operations and from normal Fort Riley activities. Includes cardboard boxes.
• Trash Removal - Includes the pickup and removal of all papers and other debris.
• Work Day - The number of hours per day the Contractor provides services IAW the contract.
• Work Week - Monday through Friday, unless specified otherwise.
3. VHA-FURNISHED PROPERTY AND SERVICES
3.1 Services
3.1.1 Fire Prevention and Protection: The VHA will provide fire prevention and protection service at 610 Warrior Road for the Contractor.
3.1.2 Refuse Collection: The VHA will provide pickup service from the refuse containers (dumpsters) located outside the building in the contract. The Contractor shall follow current Fort Riley disposal procedures, ensuring that refuse is in the appropriate containers and not on the ground.
3.2 Utilities: The VHA will furnish, without charge to the Contractor, natural gas, electricity, water, and sewage to support Contractor operations while performing the services specified herein. The Contractor is responsible for operating under conditions that preclude the waste of utilities and shall instruct employees in utilities conservation practices IAW paragraph 1.6.30, Conservation of Utilities.
3.3 Storage: The VHA will furnish storage space for equipment within the facility.
3.4 Equipment: The VHA will furnish the ACSS computer (Windows 10), ACSS software (CCURE 9000, version 2.30), and Software House iStar Ultra control panels. ACSS computer/software will be located in room 106, Bldg. 409. Software House iStar Ultra control panels are located in room 107, Bldg. 409.
4. CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES
4.1 General: Contractor shall furnish all materials, tools, equipment, communications devices, transportation, fuel, personnel, and supplies; estimates, plans, schedules, records, reports, licenses, registrations, certifications, permits, and signs required to perform the services of this requirement. Furthermore, as part of the quote the contractor submits, they shall follow provision FAR 52.204-26 Telecommunications Equipment or Services- Representation, full text will be provided in the solicitation, and shall be followed by the contractor.
4.2 Facility Access: The Contractor shall provide the appropriate background checks to have access to specific buildings. IAW Section 1.6.17.2.
4.3 Equipment
4.3.1 All equipment shall be inspected by the contractor prior to use to ensure safe operating conditions. Any equipment found to be a hazard or non-serviceable shall be removed from the facility upon discovery.
4.4 Signs
4.4.1 Caution Signs: Caution/safety signs required for performance of work specified in the contract shall be furnished and installed by the Contractor.
5. SPECIFIC TASKS
5.1 Work: This project will connect the requested ACSS and Devices for Building 409 (VA Call Center) in Fort Riley, KS to the existing CCURE 9000 PACS server (System Serial Number: 9-16333) in Topeka, KS. The Fort Riley site will use available reader licenses on the Topeka, KS CCURE 9000 PACS server to supply physical access control to the customer requested doors. Contractor will provide 1 hard set and 1 electronic set of 100% As-Built drawings with this package to show device locations, controller locations, and system related information.
5.2 Tasks:
5.2.1 : Building 409 will have a total of 16 secured doors and 29 CCTV cameras as part of the project. Each door will have two multi-function PIV card readers assigned to it for entering/exiting functionality. These readers will be contactless and support multiple card types. Keypads will be installed on all telecommunication room doors.
All readers will connect to a panel capable of supporting 16 readers total. The panels will reside in Room 107 (i.e.
basement & 1st floor) and Room 208 (i.e. 2nd floor) as well as the associated power supplies for the control panel, readers, and door locking hardware. Monitoring of the ACSS/CCTV will be performed in room 105. Contractor will provide cabling and connection to government provided monitors in room 105. Some modifications may be needed in order to accomplish this task.
5.2.2 : The installation of the door hardware and keypads/card readers will require running electrical whips from existing electrical boxes located in proximity of the doors. All magnetic locks (as indicated on the drawings) have been eliminated from the construction project. All electrical boxes remain as indicated on the drawings. The installation may require installing electrical boxes and wiring in the walls or installing surface mount electrical boxes and cable track. Installation in the walls is the preferred method of installation where feasible. Any finishes disturbed during installation will be repaired to the original condition.
5.2.3 : The following are the equipment requirements for each level of the building which includes but is not limited to (i.e. door devices, piv card readers, cctv camera’s etc.)
BASEMENT LEVEL:
5.2.3.1 : Breakroom #004 Exterior Door (Double Inswing Door) #CR-1 A composite cable is to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. See electrical drawings sheet E-801 and E-802 for additional information. THIS IS A FIRE EXIT DOOR.
One (1) PIV Card Reader:
RDR, RP40-H, PIVCLASS, SE E, LF STD, HF STD/SIO/SEOS/FIPS/CAK, 485FDX, PIG, BLK, STD-1, LED RED, FLSH GRN, BZR ON, FIPS 200-BIT, IPM OFF, UART OFF, WIEG ON
Two (2) Surface Mount Door Status Contacts:
Aluminum Housing Armored Cable Contact, Closed Loop, Wide Gap, 3” Gap Size
One (1) Exit Device Panic Bar:
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**THIS WILL BE PROVIDED BY THE CONSTRUCTION CONTRACTOR**
One (1) Hole Cap:
80 Series Hex Dog Cap
One (1) Door Loop Cable:
1/4 X 18 Armored Door Loop Aluminum
One (1) Double Door Strike
One (1) Door Pull:
Exit Device Lever Trim. Order Line Notes: VERIFY RIGHT OR LEFT HANDING **Door pulls shall be installed by the construction contractor**
One (1) Request to Exit Motion Detector
Three (3) Resistor Packs
CATVI Cable:
Plenum Rated
5.2.3.2 : Breakroom #004 Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
One (1) Fixed 2.8-12mm Network IR Camera:
Network IR outdoor vandal dome camera, 2MP, Full HD(1080p) @60fps, motorized vari-focal lens 4.3x (2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67, IK10, Nema 4X, -40°C ~ +55°C (-40°F ~ +131°F)
One (1) Dome Cap:
Medium Cap Adapter (Aluminum)
One (1) Dome Wall Mount:
Wall Mount Gooseneck Accessory, Ivory
One (1) Wall Mount Base:
Wall Mount Base Accessory, (SBP-300WM/300WM1)
CATVI Cable:
5.2.3.3 : Breakroom #004 Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional information
One (1) Fixed 2.8-12mm Network Camera:
Network indoor vandal dome camera, 2MP, Full HD(1080p) @60fps, motorized vari-focal lens 4.3x (2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD card, hallway view, HLC, defog detection, DIS, 12VDC/PoE, IK08
One (1) Ceiling Flush Mount:
In-ceiling Flush Mount
CATVI Cable
5.2.3.4 : Corridor #009 Exterior Door (Double Outswing Door) (Card In/Out) #CR-2/3 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information. THIS IS A FIRE
EXIT DOOR.
Two (2) PIV Card Readers:
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
One (1) Double Door Strike
One (1) Door Pull:
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.5 : Corridor #009 Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
One (1) Fixed 2.8-12mm Network IR Exterior Camera:
(2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67,
5.2.3.6 : Corridor #009 Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
One (1) Fixed 2.8-12mm Network Interior Camera:
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
FIRST FLOOR LEVEL:
5.2.3.7 : Open Office #100A North Exterior Door (Single Outswing Door) (Card In/Out) #CR-4/5 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information. THIS IS A FIRE
Two (2) PIV Card Reader:
One (1) Surface Mount Door Status Contacts:Aluminum Housing Armored Cable Contact, Closed Loop, Wide Gap, 3” Gap Size
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.8 : Open Office #100A North Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
(2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67,
5.2.3.9 : Open Office #100A North Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
5.2.3.10 : Open Office #100B South Exterior Door (Single Outswing Door) (Card In/Out) #CR-6/7 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information. THIS IS A FIRE
One (1) Surface Mount Door Status Contacts:
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.11 : Open Office #100B South Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
(2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67,
5.2.3.12 : Open Office #100B South Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
5.2.3.13 : Open Office #100C East Interior Door (Single Outswing Door) (Card In/Out) #CR-8/9 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information. THIS IS A FIRE
Aluminum Housing Armored Cable Contact, Closed Loop, Wide
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.14 : Open Office #100C East Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
5.2.3.15 : Open Office #100C East Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
(2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67, One (1) Dome Cap:Medium Cap Adapter (Aluminum)
5.2.3.16 : Corridor #101 South Exterior Door (Double Outswing Door) (Card In/Out) #CR-10/11 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information. THIS IS A FIRE
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
5.2.3.17 Corridor #101 South Exterior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
NEMA 4 junction box for CCTV exterior camera connected to the CCTV system. See sheet E-810 for additional
(2.8~12m (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, high powered IR LEDs range of 164', true D/N, dual SD card, hallway view HLC, defog detection, DIS, 12VDC/24VAC/PoE, IP67,
5.2.3.18 : Corridor #101 South Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
5.2.3.19 : Vestibule #109 Interior Door (Single Inswing Door) (Card In/Out) #CR-12/13 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information.
THIS IS A FIRE EXIT DOOR.
LED RED, FLSH GRN, BZR ON, FIPS 200-BIT, IPM OFF, UART OFF, WIEG ON
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.20 : Vestibule #109 Interior Camera #1:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD
5.2.3.21 : Vestibule #109 Interior Camera #2:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD card, hallway view, HLC, defog detection, DIS, 12VDC/PoE, IK08
5.2.3.22 : Vestibule #110 Interior Door (Single Inswing Door) (Card In/Out) #CR-14/15 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. See sheet E-801 and E-802 for additional information.
THIS IS A FIRE EXIT DOOR.
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
**Door pulls shall be installed by the construction contractor**
Three (3) Resistor Packs
5.2.3.23 : Vestibule #110 Interior Camera:
A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See electrical drawings sheet E-801 and E-810 for additional information.
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD card, hallway view, HLC, defog detection, DIS, 12VDC/PoE, IK08
5.2.3.24 : Room #107 Data Gathering Panel Location (20 Readers) This new panel will be connected to the existing network provided by the owner. The VA will provide 110v ac at the panel location as well as a network connection.
One (1) 16-reader Data Panel
One (1) 8-reader Data Panel
Two (2) Power Supply Cables
Two (2) 8-Input Modules I8 Input Reader Bus Module
Two (2) 8-Output Modules R8 Output Reader Bus Module
Two (2) Lock Power Supplies
Two (2) Panel Power Supplies
Two (2) Lock Power Supplies
Three (3) Lock Relay Boards
Two (2) Rocker Switches
Six (6) 12v12ah Battery
Fourteen (14) Resistor Packs
One (1) 8-Port POE Network Switch
5.2.3.25 : Electrical Room #107 NVR Location (20 Cameras) The VA will provide 110v ac at the POE switch location as needed as well as a network connection for the POE switch.
One (1) 16TB Video NVR – 16 TB with at least 1 TB storage retention.
One (1) NVR Rack Rails
One (1) External DVR - 1 TB of storage, with read/write USB DVD option.
Twenty-Nine (29) IP Camera Licenses - The contractor shall be responsible for providing 29 camera licenses for the brand they chose to provide.
One (1) 22” Video Monitor (Monitor to be located in Room 105)
One (1) 24-Port Network POE Switch – 8+2 port 802.3 at POE network switch and 24-port POE Switch with 4 combo SFP slots.
5.2.3.26 : Telecommunication Room #106 Interior Door (Single Inswing Door) #CR-16 Two composite cables are to be pulled back to the data gathering panel location in Room #107 on the first floor.
Junction Box for magnetic lock power and controls from the access control system. Junction box for access control card reader connected to the access control system. NEMA 4 junction box for access control card reader connected to the access control system. See electrical drawings sheet E-801 and E-802 for additional information.
One (1) multiclass Keypad:
Reads: 125kHz – HID, Indala, EM4102 or AWID proximity 13.56MHz – iCLASS, ISO 15693 CSN (MyD, ICODE, Tag it), ISO 14443A CSN (MIFARE, DESFire), US Government PIV, ISO 14443B CSN, FeliCa™ IDm, CEPAS CAN or CSN
Exit Device, Rim, Electric Latch Retraction, Exit Only with PTB/ET Trim, 33 to 36" F Rail, Dull Stainless
5.2.3.27 : Corridor #101 Interior Camera A video CAT6 cable is to be pulled back to the network POE switch location in Room #107 on the first floor.
Junction box for CCTV interior camera connected to the CCTV system. See sheet E-801 and E-810 for additional
(2.8~12mm) (119.5°~27.9°), triple codec H.265/H.264/MJPEG with WiseStream II technology, 150dB WDR, USB port for easy installation, advanced video analytics and sound classification, true D/N, dual SD card, hallway view, HLC, defog detection, DIS, 12VDC/PoE, IK08
5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .