36C25919R0091-005.pdf

PDF 269 KB Posted

Attached to
Fire Barrier Mitigation B1 NRM 575-17-102 (VA-19-00037691)
Solicitation number
36C25919R0091
Issued by

About this file

36C25919R0091 S02 Attachment B G-002.pdf

View the file

Other files

File Type Posted
36C25919C0153-000.docx DOCX document
36C25919R0091-0003000.docx DOCX document
36C25919R0091-0002000.docx DOCX document
36C25919R0091-0001000.docx DOCX document
36C25919R0091-0001004.jpg JPG image
36C25919R0091-0001002.jpg JPG image
36C25919R0091-0001003.jpg JPG image
36C25919R0091-0001001.pdf PDF
36C25919R0091-007.pdf PDF
36C25919R0091-004.pdf PDF
36C25919R0091-001.docx DOCX document
36C25919R0091-002.docx DOCX document
36C25919R0091-006.pdf PDF
36C25919R0091-003.pdf PDF
36C25919R0091-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL ABBREVIATIONS

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING

JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE

TRANSPORTATION

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BO BOTTOM OF

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER

BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH

CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD, CEILING

GRILLE

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION

SPECIFICATIONS INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION

AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETS EXPOSED TO STRUCTURE

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GWB GYPSUM WALL BOARD

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PLASTIC

PARTN PARTITION

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLD SOLID SURFACE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOTT

WT WEIGHT

WWF WELDED WIRE FABRIC

XX-XX

XX

X

X XXXX

X

X

X XXXXX

PARTITION TYPE

IDENTIFIER

FRAME IDENTIFIER

EQUIPMENT IDENTIFIER

REVISION INDICATOR

ROOM NAME

EXTERIOR ELEVATION

REFERENCE

INTERIOR ELEVATION

REFERENCE

ARCHITECTURAL DRAWING SYMBOLS

N

NORTH ARROW

MATCH LINE

ROOM IDENTIFIER

SHEET LOCATION

ROOM NUMBER

VIEW NUMBER

XX KEYNOTE

1 View Name A101

1/8" = 1'-0"

Room name

S1

SPECIALTIES AND

EQUIPMENT IDENTIFIER

XX

/SEE DRAWING

MATCHLINE

## X###

1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL

CONTRACTORS, SUB CONTRACTORS, MANUFACTURERS,

SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE

GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND

ADHERE TO THESE REQUIREMENTS.

2. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS

SINGULARLY DEFINED. YOUR SCOPE OF WORK IS DEFINED

THROUGHOUT THE ENTIRE SET OF DRAWINGS AND

SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE SERIES

OF DRAWINGS OR DIVISION OF SPECIFICATIONS. YOU MUST

REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO

DETERMINE YOUR SCOPE OF WORK.

3. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME

FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT

CARRYING OUT THE WORK AS DESCRIBED IN THESE

CONTRACT DOCUMENTS. THE CONTRACTOR SHALL

INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL

CONDITIONS OF THE PROJECT, AND NOTIFY THE ARCHITECT

OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE

PROCEEDING WITH THE WORK.

4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,

EQUIPMENT, LABOR, AND SERVICES NECESSARY TO PROVIDE

FULLY OPERATIONAL ASSEMBLIES AND COMPLETE THE WORK.

5. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH

THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND

REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH

ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS

PROJECT.

6. THE GENERAL CONTRACTOR SHALL FOLLOW AND OBEY ALL

FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

7. CONTRACTOR SHALL SUBMIT CONFORMATION OF ORDERED

MATERIALS OR ITEMS NECESSARY TO COMPLETE THE

PROJECT WITH PROJECTED DELIVERY DATE GREATER THAN

FOUR WEEKS.

8. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS

REQUIRED FOR APPROVAL PRIOR TO COMMENCING ANY

WORK.

9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE

COORDINATION OF ALL TRADES AND THE PREVENTION OF

CONFLICTS BETWEEN ALL TRADES.

10. DURING TIMES WHERE EXISTING SPRINKLER SYSTEM MAY BE

SHUT-DOWN TO ALLOW SPINKLER MODIFICATION;

CONTRACTOR SHALL SUPPLY FIRE WATCH ACCORDING TO

SPEC SECTION 01 35 26 SAFETY REQUIREMENTS - SEE

SECTION 1.13K FOR SPECIFICS.

GENERAL REQUIREMENTS

1. EXISTING CONDITIONS ARE DETAILED FOR EASE OF

CONSTRUCTION AND BASED OFF EXISTING DRAWINGS.

CONTRACTOR TO FULLY INVESTIGATE EXISTING CONDITIONS

PRIOR TO ANY WORK.

2. THESE DRAWINGS WERE PRODUCED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE’S UNIFORM

DRAWING SYSTEM AND THE NATIONAL CAD STANDARD AS

GUIDES.

3. ANY INDICATION OF PROJECT LIMITS OR LINES OF

DEMARCATION ARE SHOWN FOR THE CONVENIENCE OF THE

CONTRACTOR, AND ARE NOT TO BE TAKEN LITERALLY.

ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE

CONTRACTOR AND APPROVED BY THE OWNER BEFORE

ACTUAL CONSTRUCTION WORK BEGINS.

4. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT

CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURES.

DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY

CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO

THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS MAY

ALSO BE ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION

DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN.

CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS

FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK

(INCLUDING PARTITION THICKNESSES FOR RECESSED OR

SEMI-RECESSED PRODUCTS), AND IS RESPONSIBLE FOR

ACCOMMODATING AND COORDINATING CHANGES TO OTHER

MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE

OF THESE DIFFERENCES.

5. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO

DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED

HEREIN ARE USED ONLY FOR THE PURPOSES OF

CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY

DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE

DRAWINGS, OR THE DRAWINGS AND SPECIFICATIONS AS A

WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN

NO WAY SUGGESTS THAT THE WORK IS NOT TO BE

CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED

WHOLE.

6. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS

PREPARED BY SPECIFIC ENGINEERING DISCIPLINES (SUCH AS

CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, ETC.) ARE

COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN

THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS

OF THE CONTRACTOR FOR CONSTRUCTION. IN THE EVENT OF

AN INCONSISTENCY BETWEEN THE DRAWINGS AND

SPECIFICATIONS, OR WITHIN EITHER DOCUMENTS, THE

CONTRACTOR SHALL SEEK CLARIFICATION OR

INTERPRETATION FROM THE ARCHITECT PRIOR TO BIDDING.

WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO

BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT

CANNOT BE REASONABLY INFERRED, THE CONTRACTOR

SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY

OF WORK.

7. USE OF THE WORD “VERIFY” POINTS OUT A SITUATION WHICH

MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE

WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL.

NOTIFY THE ARCHITECT OF ANY DISCREPANCY.

8. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

NOTIFYING THE ARCHITECT IMMEDIATELY SHOULD ANY

DISCREPANCIES BE FOUND IN THE DRAWINGS AND

SPECIFICATIONS.

9. DO NOT SCALE THE DRAWINGS. DRAWINGS SCALES AS

INDICATED ARE FOR REFERENCE ONLY AND ARE NOT

INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATE

CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

10. ALL DIMENSIONS INDICATED ARE TO FACES OF

CMU/STUD/STRUCTURAL MATERIALS OR COLUMN GRID LINES

UNLESS NOTED OTHERWISE. MASONRY DIMENSIONS ARE

MODULAR IN THAT THEY INCLUDE THE GROUT JOINT. ROUGH

OPENINGS ALLOW FOR SHIM SPACE.

11. THE TERM “ALIGN” REFERS TO LOCATING DIFFERENT

COMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSH

FINISH SURFACE.

GENERAL DRAWING AND DIMENSION NOTES

1. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR

WHERE DISSIMILAR MATERIALS INTERSECT PERPENDICULAR

TO EACH OTHER, AND THE INTERSECTION IS EXPOSED TO

VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS.

2. WHERE DOORS IN PARTITIONS ARE NOT DIMENSIONALLY

LOCATED ON THE PLANS, PROVIDE A MINIMUM HINGE SIDE

JAMB DIMENSION OF 6” FROM DOOR OPENING TO ADJACENT

PERPENDICULAR WALL.

3. PROVIDE CONTROL JOINT IN ALL GYPSUM BOARD WALLS

GREATER THAN 30’ LONG. PLACE CONTROL JOINTS AT

CORNERS OF DOORS OR WINDOWS.

4. ALL SURFACES AND SUBSTRATES SHALL BE PREPARED FOR

INSTALLATION PER MANUFACTURER'S RECOMMENDED

INSTRUCTIONS, UNO.

5. PROVIDE ALL BLOCKING (WOOD OR 16 G.A. GALVANIZED SHEET

METAL) AS REQUIRED FOR THE ATTACHMENT OF

MISCELLANEOUS EQUIPMENT INCLUDING BUT NOT LIMITED TO:

TOILET ACCESSORIES, DOOR HARDWARE, ELECTRICAL

DEVICES, KITCHEN EQUIPMENT, GRAB BARS, HAND RAILS, AND

CASEWORK.

6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

FINAL CLEAN UP FOLLOWING EACH PHASE AND UPON

COMPLETION.

7. NO UTILITY SERVICE INTERRUPTION SHALL OCCUR WITHOUT

THE PRIOR WRITTEN APPROVAL OF THE OWNER. ALL

REQUEST FOR UTILITY SERVICE INTERRUPTION SHALL

INCLUDE A COMPLETED “UTILITY SYSTEMS SERVICE/OUTAGE

NOTIFICATION” FORM. ALL UTILITY SERVICE INTERRUPTIONS

SHALL OCCUR AFTER NORMAL HOURS OF MEDICAL CENTER

OPERATION. ALL UTILITY SERVICES INTERRUPTION

PROCEDURES SHALL COMPLY WITH THE GENERAL

REQUIREMENTS SPECIFICATIONS.

8. CONTRACTOR TO PATCH AND REPAIR AREAS AFFECTED BY

DEMOLITION AND CONSTRUCTION ACTIVITIES. MATCH

EXISTING ADJACENT CONSTRUCTION AND FINISH.

CONTRACTOR TO FIELD. VERIFY SCOPE OF WORK.

GENERAL CONSTRUCTION NOTES

MANUFACTURER'S TRADE NAMES AND NUMBERS USED

HEREIN ARE ONLY TO IDENTIFY CHARACTER, COLORS,

FINISHES, TEXTURES AND PATTERNS AS THE BASIS OF

DESIGN. PRODUCTS OF AUTHORIZED EQUAL

MANUFACTURER'S EQUIVALENT TO QUALITY, COLORS,

FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS

LISTED THAT MEET THE REQUIREMENTS OF TECHNICAL

SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE

WITH SUBMITTAL OF A COMPLETED SUBSTITUTION

REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND

ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY

CONTRACTING OFFICER.

INFECTION CONTROL PLAN NOTES

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE A

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: I

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 6/G002.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 8/G-002

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 013526 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN ASINGLE PHASE

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

// WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM. //

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

COORDINATE WITH COR. ALL WORK TO BE COMPLETED AND OPEN FOR PUBLIC

USE AT THE END OF EACH NIGHT'S WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

NOTES APPLY TO PLANS ON AS109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\K n ie h a u s \D o c u m e n ts

\1 .1

.0

V A

G ra n d

J u n c ti o n

F ir e

B a rr ie r M it ig a ti o n

V k n ie h a u s g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:3

A

M

G-002

ABBREVIATIONS AND SYMBOLS

GUIDON DESIGN INC.

905 N. CAPITOL AVENUE SUITE 100

INDIANAPOLIS, IN 46204

317-800-6388

JAMES GOODEN

FIRE BARRIER MITIGATION,

BUILDING 1

GRAND JUNCTION, CO

575-17-102

BLDG 1

11/19/2018 JG KN

100% BID DOCUMENTS

Revisions: Date:

Sheets
G-002 - ABBREVIATIONS AND SYMBOLS

File details come from the government source that posted it.