36C25919R0091-003.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25919R0091
About this file
36C25919R0091 S02 3a 575-17-102 - Fire Barrier Mit Plans.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25919C0153-000.docx | DOCX document | |
| 36C25919R0091-0003000.docx | DOCX document | |
| 36C25919R0091-0002000.docx | DOCX document | |
| 36C25919R0091-0001000.docx | DOCX document | |
| 36C25919R0091-0001004.jpg | JPG image | |
| 36C25919R0091-0001002.jpg | JPG image | |
| 36C25919R0091-0001003.jpg | JPG image | |
| 36C25919R0091-0001001.pdf | ||
| 36C25919R0091-007.pdf | ||
| 36C25919R0091-004.pdf | ||
| 36C25919R0091-001.docx | DOCX document | |
| 36C25919R0091-005.pdf | ||
| 36C25919R0091-002.docx | DOCX document | |
| 36C25919R0091-006.pdf | ||
| 36C25919R0091-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE MAP
VICINITY MAP
PROJECT BUILDING
PROJECT SITE
MEDICAL CENTER DIRECTOR
ASSOCIATE DIRECTOR
CHIEF OF STAFF
AD OF PATIENT CARE SERVICES
CHIEF OF ENGINEERING
SAFETY OFFICER
INFORMATION SECURITY OFFICER
CHIEF OF POLICE
INFECTION PREVENTION
NAGE
OIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:1
P M
G-001
TITLE SHEET
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
Sheet List Sheet Number Sheet Name
G-001 TITLE SHEET
G-002 ABBREVIATIONS AND SYMBOLS
G-101 LIFE SAFETY PLAN
G-102 LIFE SAFETY PLAN
AS001 KEY NOTE CHART
AS101 BASEMENT FLOOR PLAN - NORTH
AS102 BASEMENT FLOOR PLAN - SOUTH
AS103 GROUND FLOOR PLAN - NORTH
AS104 GROUND FLOOR PLAN - SOUTH
AS105 SECOND FLOOR PLAN - NORTH
AS106 SECOND FLOOR PLAN - SOUTH
AS107 THIRD FLOOR PLAN - NORTH
AS108 THIRD FLOOR PLAN - SOUTH
AS109 FOURTH FLOOR PLAN
AS110 FIFTH FLOOR PLAN
AS111 SIXTH AND SEVENTH FLOOR PLAN
AS112 FIRE BARRIER DETAILS
AS113 FIRE BARRIER DETAILS
VA WESTERN COLORADO HEALTH CARE SYSTEM
FIRE BARRIER MITIGATION, BUILDING 1
100% BID DOCUMENTS
2121 NORTH AVENUE,
GRAND JUNCTION,COLORADO 81501
Contact: Contact:
VA WESTERN COLORADO HEALTH
CARE SYSTEM
MARGARET KELLY
COR
2121 North Avenue Grand Junction, CO 81501 p: (970) 242 - 0731 ext. 2005 e: Margaret.Kelly3@va.gov
OWNER
GUIDON DESIGN INC.
JAMES GOODEN
ARCHITECT
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 145 e: jgooden@guidondesign.com
ARCHITECT
Revisions: Date:
ARCHITECTURAL ABBREVIATIONS
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING
JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE
TRANSPORTATION
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER
BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH
CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD, CEILING
GRILLE
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION
SPECIFICATIONS INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETS EXPOSED TO STRUCTURE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GWB GYPSUM WALL BOARD
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PLASTIC
PARTN PARTITION
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLD SOLID SURFACE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOTT
WT WEIGHT
WWF WELDED WIRE FABRIC
XX-XX
XX
X
X XXXX
X
X
X XXXXX
PARTITION TYPE
IDENTIFIER
FRAME IDENTIFIER
EQUIPMENT IDENTIFIER
REVISION INDICATOR
ROOM NAME
EXTERIOR ELEVATION
REFERENCE
INTERIOR ELEVATION
REFERENCE
ARCHITECTURAL DRAWING SYMBOLS
N
NORTH ARROW
MATCH LINE
ROOM IDENTIFIER
SHEET LOCATION
ROOM NUMBER
VIEW NUMBER
XX KEYNOTE
1 View Name A101
1/8" = 1'-0"
Room name
S1
SPECIALTIES AND
EQUIPMENT IDENTIFIER
XX
/SEE DRAWING
MATCHLINE
## X###
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL
CONTRACTORS, SUB CONTRACTORS, MANUFACTURERS,
SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE
GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND
ADHERE TO THESE REQUIREMENTS.
2. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS
SINGULARLY DEFINED. YOUR SCOPE OF WORK IS DEFINED
THROUGHOUT THE ENTIRE SET OF DRAWINGS AND
SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE SERIES
OF DRAWINGS OR DIVISION OF SPECIFICATIONS. YOU MUST
REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO
DETERMINE YOUR SCOPE OF WORK.
3. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT
CARRYING OUT THE WORK AS DESCRIBED IN THESE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL
CONDITIONS OF THE PROJECT, AND NOTIFY THE ARCHITECT
OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE
PROCEEDING WITH THE WORK.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,
EQUIPMENT, LABOR, AND SERVICES NECESSARY TO PROVIDE
FULLY OPERATIONAL ASSEMBLIES AND COMPLETE THE WORK.
5. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH
THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH
ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS
PROJECT.
6. THE GENERAL CONTRACTOR SHALL FOLLOW AND OBEY ALL
FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
7. CONTRACTOR SHALL SUBMIT CONFORMATION OF ORDERED
MATERIALS OR ITEMS NECESSARY TO COMPLETE THE
PROJECT WITH PROJECTED DELIVERY DATE GREATER THAN
FOUR WEEKS.
8. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS
REQUIRED FOR APPROVAL PRIOR TO COMMENCING ANY
WORK.
9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF ALL TRADES AND THE PREVENTION OF
CONFLICTS BETWEEN ALL TRADES.
10. DURING TIMES WHERE EXISTING SPRINKLER SYSTEM MAY BE
SHUT-DOWN TO ALLOW SPINKLER MODIFICATION;
CONTRACTOR SHALL SUPPLY FIRE WATCH ACCORDING TO
SPEC SECTION 01 35 26 SAFETY REQUIREMENTS - SEE
SECTION 1.13K FOR SPECIFICS.
GENERAL REQUIREMENTS
1. EXISTING CONDITIONS ARE DETAILED FOR EASE OF
CONSTRUCTION AND BASED OFF EXISTING DRAWINGS.
CONTRACTOR TO FULLY INVESTIGATE EXISTING CONDITIONS
PRIOR TO ANY WORK.
2. THESE DRAWINGS WERE PRODUCED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE’S UNIFORM
DRAWING SYSTEM AND THE NATIONAL CAD STANDARD AS
GUIDES.
3. ANY INDICATION OF PROJECT LIMITS OR LINES OF
DEMARCATION ARE SHOWN FOR THE CONVENIENCE OF THE
CONTRACTOR, AND ARE NOT TO BE TAKEN LITERALLY.
ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE
CONTRACTOR AND APPROVED BY THE OWNER BEFORE
ACTUAL CONSTRUCTION WORK BEGINS.
4. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT
CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURES.
DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY
CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO
THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS MAY
ALSO BE ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION
DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN.
CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS
FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK
(INCLUDING PARTITION THICKNESSES FOR RECESSED OR
SEMI-RECESSED PRODUCTS), AND IS RESPONSIBLE FOR
ACCOMMODATING AND COORDINATING CHANGES TO OTHER
MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE
OF THESE DIFFERENCES.
5. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO
DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED
HEREIN ARE USED ONLY FOR THE PURPOSES OF
CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY
DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE
DRAWINGS, OR THE DRAWINGS AND SPECIFICATIONS AS A
WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN
NO WAY SUGGESTS THAT THE WORK IS NOT TO BE
CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED
WHOLE.
6. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS
PREPARED BY SPECIFIC ENGINEERING DISCIPLINES (SUCH AS
CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, ETC.) ARE
COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN
THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS
OF THE CONTRACTOR FOR CONSTRUCTION. IN THE EVENT OF
AN INCONSISTENCY BETWEEN THE DRAWINGS AND
SPECIFICATIONS, OR WITHIN EITHER DOCUMENTS, THE
CONTRACTOR SHALL SEEK CLARIFICATION OR
INTERPRETATION FROM THE ARCHITECT PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO
BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT
CANNOT BE REASONABLY INFERRED, THE CONTRACTOR
SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY
OF WORK.
7. USE OF THE WORD “VERIFY” POINTS OUT A SITUATION WHICH
MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE
WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL.
NOTIFY THE ARCHITECT OF ANY DISCREPANCY.
8. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
NOTIFYING THE ARCHITECT IMMEDIATELY SHOULD ANY
DISCREPANCIES BE FOUND IN THE DRAWINGS AND
SPECIFICATIONS.
9. DO NOT SCALE THE DRAWINGS. DRAWINGS SCALES AS
INDICATED ARE FOR REFERENCE ONLY AND ARE NOT
INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATE
CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
10. ALL DIMENSIONS INDICATED ARE TO FACES OF
CMU/STUD/STRUCTURAL MATERIALS OR COLUMN GRID LINES
UNLESS NOTED OTHERWISE. MASONRY DIMENSIONS ARE
MODULAR IN THAT THEY INCLUDE THE GROUT JOINT. ROUGH
OPENINGS ALLOW FOR SHIM SPACE.
11. THE TERM “ALIGN” REFERS TO LOCATING DIFFERENT
COMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSH
FINISH SURFACE.
GENERAL DRAWING AND DIMENSION NOTES
1. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR
WHERE DISSIMILAR MATERIALS INTERSECT PERPENDICULAR
TO EACH OTHER, AND THE INTERSECTION IS EXPOSED TO
VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
2. WHERE DOORS IN PARTITIONS ARE NOT DIMENSIONALLY
LOCATED ON THE PLANS, PROVIDE A MINIMUM HINGE SIDE
JAMB DIMENSION OF 6” FROM DOOR OPENING TO ADJACENT
PERPENDICULAR WALL.
3. PROVIDE CONTROL JOINT IN ALL GYPSUM BOARD WALLS
GREATER THAN 30’ LONG. PLACE CONTROL JOINTS AT
CORNERS OF DOORS OR WINDOWS.
4. ALL SURFACES AND SUBSTRATES SHALL BE PREPARED FOR
INSTALLATION PER MANUFACTURER'S RECOMMENDED
INSTRUCTIONS, UNO.
5. PROVIDE ALL BLOCKING (WOOD OR 16 G.A. GALVANIZED SHEET
METAL) AS REQUIRED FOR THE ATTACHMENT OF
MISCELLANEOUS EQUIPMENT INCLUDING BUT NOT LIMITED TO:
TOILET ACCESSORIES, DOOR HARDWARE, ELECTRICAL
DEVICES, KITCHEN EQUIPMENT, GRAB BARS, HAND RAILS, AND
CASEWORK.
6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
FINAL CLEAN UP FOLLOWING EACH PHASE AND UPON
COMPLETION.
7. NO UTILITY SERVICE INTERRUPTION SHALL OCCUR WITHOUT
THE PRIOR WRITTEN APPROVAL OF THE OWNER. ALL
REQUEST FOR UTILITY SERVICE INTERRUPTION SHALL
INCLUDE A COMPLETED “UTILITY SYSTEMS SERVICE/OUTAGE
NOTIFICATION” FORM. ALL UTILITY SERVICE INTERRUPTIONS
SHALL OCCUR AFTER NORMAL HOURS OF MEDICAL CENTER
OPERATION. ALL UTILITY SERVICES INTERRUPTION
PROCEDURES SHALL COMPLY WITH THE GENERAL
REQUIREMENTS SPECIFICATIONS.
8. CONTRACTOR TO PATCH AND REPAIR AREAS AFFECTED BY
DEMOLITION AND CONSTRUCTION ACTIVITIES. MATCH
EXISTING ADJACENT CONSTRUCTION AND FINISH.
CONTRACTOR TO FIELD. VERIFY SCOPE OF WORK.
GENERAL CONSTRUCTION NOTES
MANUFACTURER'S TRADE NAMES AND NUMBERS USED
HEREIN ARE ONLY TO IDENTIFY CHARACTER, COLORS,
FINISHES, TEXTURES AND PATTERNS AS THE BASIS OF
DESIGN. PRODUCTS OF AUTHORIZED EQUAL
MANUFACTURER'S EQUIVALENT TO QUALITY, COLORS,
FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS
LISTED THAT MEET THE REQUIREMENTS OF TECHNICAL
SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE
WITH SUBMITTAL OF A COMPLETED SUBSTITUTION
REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND
ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY
CONTRACTING OFFICER.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE A
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: I
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 6/G002.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 8/G-002
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN ASINGLE PHASE
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING
INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED
CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
// WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM. //
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.
COORDINATE WITH COR. ALL WORK TO BE COMPLETED AND OPEN FOR PUBLIC
USE AT THE END OF EACH NIGHT'S WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
NOTES APPLY TO PLANS ON AS109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:1
P M
G-002
ABBREVIATIONS AND SYMBOLS
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
Toilet-
Women
WOMEN’S
TOILET
MEN’S
TOILET
STAIRWELL
MEN’S
BATHROOM
WOMEN’S
BATHROOM
DOCK
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC).
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL
COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE
IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA
101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE
DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE
IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL
IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,
INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ)
AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH
ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED
NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE
ATTENTION OF THE VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2015 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS
PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES
NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION
OF THE INTERNATIONAL BUILDING CODE HAS BEEN USED.
PROJECT SCOPE
THE EXISTING BUILDING HAS FIRE BARRIER DEFICIENCIES WHICH ARE TO BE MITIGATED TO
COMPLY WITH NFPA 101.
CODE ANALYSIS
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT
REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL
BE PER CHAPTER 6 OF THE IBC FOR TYPE I-A AND LSC 1 (332) CONSTRUCTION AS FOLLOWS:
1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 19
2. CONSTRUCTION TYPE: I-A (IBC CHAPTER 5)
3. FIRE RESISTIVE RATINGS TYPE 1-A CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 3 -HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1.5-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
5. ALLOWABLE HEIGHT: UNLIMITED FT (IBC, TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4)
7. ALLOWABLE AREA: FULLY SPRINKLED: ALLOWABLE AREA: UNLIMITED (IBC, TABLE 506.2)
8. MEANS OF EGRESS
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.
• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING,
TREATMENT, OR USE OF INPATIENTS SHALL BENT LESS THAN 44 IN. CLEAR AND
UNOBSTRUCTED WIDTH.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 36 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)
• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)
• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)
• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)
• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)
• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)
9. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AN ESSENTIAL ELECTRICAL
SYSTEM PER NFPA 99 SHALL BE PROVIDED.
10. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH
SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1.2 SHALL BE PROTECTED AS INDICATED.
(LSC 18.3.2)
TABLE 18.3.2.1.2 HAZARDOUS AREA PROTECTION
• BOILER AND FUEL-FIRED HEATER ROOMS 1 HOUR CENTRAL/BULK LAUNDRIES LARGER THAN 100
FT2 1 HOUR.
• PAINT SHOPS EMPLOYING HAZARDOUS SUBSTANCES AND MATERIALS IN QUANTITIES LESS THAN
THOSE THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD 1 HOUR.
• PHYSICAL PLANT MAINTENANCE SHOPS 1 HOUR.
• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL 1 HOUR
• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL 1 HOUR† MINIMUM FIRE
RESISTANCE RATING.
• STORAGE ROOMS LARGER THAN 50 FT2 BUT NOT EXCEEDING 100 FT2 AND STORING
COMBUSTIBLE MATERIAL.
• STORAGE ROOMS LARGER THAN 100 FT2 AND STORING COMBUSTIBLE MATERIAL 1 HOUR.
11. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF
THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE
CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING AS FURNISHINGS OR
DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE
REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE TESTS FOR FLAME-RESISTANT
TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES
MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR
1632, ASTME E1537, AND ASTME E1590
12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER
NFPA 10.
13. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM
PER 9.6.4. (LSC 18.3.4.3.2)
14. FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE
WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION
DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017
EDITION
NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
GOVERNING CODES:CODE ANALYSIS - NFPA 101, CHAPTER 19
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:1
P M
G-101
LIFE SAFETY PLAN
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
SCALE: 1/32" = 1'-0"G-101
1 BASEMENT FLOOR PLAN - LIFE SAFETY
SCALE: 1/32" = 1'-0"G-101
4 GROUND FLOOR PLAN - LIFE SAFETY
ELEV
MECHANICAL ROOM
E:Storage
STORAGE
H.A.C.
H.A.C.
E:EKG−Primarily Walk−in
E:Cardio/Pulmonary Check−in/MSA
+3 Work Stations E:EKG−Scheduled/Walk−in +Ancillary Work Station
E:2 Work Stations F:Sterile Supplies
E:Pulmonary Function Testing +3 work stations F:Pulmonary Function Testing +Ancillary Work Station
E:Pulse Oximeter Testing +Lab Draws +Supplies
F:CPAP+Ancillary WS
+1 Work Station
Cardiac Event Monitoring +Stress Test +Ancillary Work Station
E/F:Pulmonologist Clinic
Procedures;
+ Ancillary WS
E/F:Cardiology Clinic
Noninvasive Vascular
E:CPAP
F:Non−VA Oxygen
Lab Draws
E:CPAP Supplies F:Non−VA Oxygen
F:Clean Equipment Room
Pulse Oxymeter Testing;
F:Cardio/Pulmonary Touchdown Spaces
2701 2702
2010(B)
Simulation Learning Center
TOILET
LOCKER
ROOM
MEN’S
SHOWER
WOMEN’S
SHOWER
COPY/ FAX
STORAGE
STORAGE
TOILET
WAITING ROOM
STAFF
LOUNGE
TOILET
STORAGE
FRONT END
BLOOD DRAW
2214BLOOD DRAW
TOILET
BLOOD DRAW
LAB
BLOOD BANK
2217(A)
OFFICE
MICROBIOLOGY
ANATOMIC
PATHOLOGY
DI ROOM
2221(A)
BIOHAZARD
EXAM
2007(A)
2007(B)
TOILET
2010(A)
2021(A)
ELEC.
ELEC.
TOILET
TOILET
WAITING ROOM
2675(A)
LAB
2693LOUNGE
26932696
2684 2685
26832679
MECH. RM.
MECHANICAL
ROOM
OFFICE
R.O.I.
FILE ROOM
R.O.I.
26082627
2673(A)2673(B)
2675(B)
2669(B)
2669(A)
2657(C)
2656 2658
STORAGE
DATA
TOILET
2419A 2419
TOILET
DRESS ROOM
2407 2407(A)
X−RAY
DRESS
ROOM
DRESS
ROOM
TOILET
ELEC.
X−RAY
TOILET
TOILET
MECHANICAL
ROOM
MECH. RM.
DATA
E:Dental Sterile Supply
E:Dental Clean Supply
DATA
ELEC.
RADIOLOGY
H.A.C.
2610(A)
LINEN CHUTE
ELEC.
ELEC.
IT Room
2657(B)
ELEVATOR
ELEVATOR
ELEVATOR
P−5
S−5
P−1P−2S−3
2425 2024
S−4
2657(A)2657(D)
E: Storage
(MH)
F: Office (MH)
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Admin Office
(MH)
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Med Students
(MH)
#: 2
F: Psych #: 1
2642A
2642B 2642E
2642D 2642C
E: Office
(MH)
#: 1
F: Med Students #: 2
E: Psych
(MH)
#: 1
E: Psych
(MH)
#: 1
E: Psych
(MH)
#: 1
E: Psych
(MH)
#: 1
E: Waiting Room
(MH)
E: Psych
(MH)
E: Storage (Prosthetics)
E: Group Room
(MH)
E: (MH)
#: 1
E: (MH)
#: 1
E: Nurse Practitioner
(MH)
#: 1
E: Housekeeping
E: Psych
(MH)
#: 1
E: Psych
(MH)
#: 1
E: Psych
(MH)
#: 1
E: (MH)
#: 1
E: (MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office
(MH)
#: 1
E: Office (MH) #:
F:2nd Suicide PRevention coord
E: #2 (audiology)
PROSTHETICS
PROSTHETICS
PROSTHETICS
PROSTHETICS
CHECK IN
E:Dental Dirty Utility
E:Dental Operatory
E:Dental Operatory
E:Dental Operatory
E:Dental Office
Chief (1)
E:Dental
MSA (2)
E:Dental Office (2)
E:Dental Operatory
E:CP / LAB
Team Rm
E: Office
(HIMS)
#: 2
E: COMPUTER
(HIMS)
#: 2
E: Patient education class
(HIMS)
#: 1
E:
(MH)
#: 5
E: Providers Office
(MH)
#: 1
E:Dental Operatory E:Dental
X−Ray
E: #2 (audiology)
E: #1 (audiology)
E: #1 (audiology)
E: #2 (audiology)
E: #1 (audiology)
E: Anechoic chamber
142NSF: Primary Care Team + 2 touchdown
149NSF:
Primary Care
Exam RM
E: #2 (radiology)
E: #1 (radiology)
E: soiled util (radiology)
E: #1 (radiology)
E: #3 (radiology) no dark room E: #3 (radiology)
E: #1 (radiology)
E: procedure room
(radiology)
E: xray storage (radiology)
E: #1 (radiology)
E: #2 (radiology)
E: #1 (radiology)
E: #1 (radiology) E: #1
(radiology)
E: #1 (radiology)
E: CT
#2
(radiology)
E: Lab Info Manager
#1 (radiology)
E: Ancillary testing coordinator #1
(radiology)
E:Lab/CP Waiting
WAITING
E:Dental X−Ray Viewing Rm
E:Dental X−Ray
E:HSKPNG
E:Toilet
E:In−Patient Speach
Therapist & Audiology
Telehealth; MMU TCT touchdown
150 NSF:
Primary Care
Team
131NSF:
Primary Care
Exam Rm
161NSF: Primary Care Exam Rm
181NSF:
P:CardioPulmonary
Touchdown
168NSF: T:RTLS
19 Mar − 6 Apr F:Neurology
Procedures + Ancillary Work
Station
136NSF: VACC
Supervisor
1689 NSF:
VACC Call
Center; MSA Call Center, RN Call
Center
Copier & Work Room
114NSF: Primary Care Exam Rm
Check In/Out
Add Toilet
60 NSF:
Supplies
2010(C) Grp1
Grp5
Grp7
Grp8
MSA
Grp9(2/2)Grp6
CALL
RN
CALL
TELEHEALTH
CALL
Grp4Grp3
Grp2
HOME
Grp9 (1/2)
MSA Sup.
E: Library
(HIMS)
#: 0
E: Office
(HIMS)
#: 1
STOR. STOR.
DRESS ROOM
UP
MECH 1
IT
3671A
3618A
3628 3629
3663 3664
3652A 3652B
R3450
R3450A R3404
R3007
R3009
R3008
R3403 R3406
R3405
3656A
S-2
S-1
X3401 X3402
3401A
S-5
30153604
3617A
3615A
X3402A
30133412
3671B
3603A
3618B
3635C
3017A 3017B 3018A 3018B 3019A 3019B
3020A3020B3021
3024A
30273028
3031 3030
3404A
3421 3405
3203 3202
3402A
3430 3003
P-1P-2
S-3
3022?
E: OFFICE
(PRIM)
#: 1
3401A
34073408
34243432
E: Primary Care Mondays;
supplies T−S F: 3rd floor reno
E: VITAL SIGN
(PRIM)
#: 1
E:
(PRIM)
#: 1
E: NURSE
OFFICE
(PRIM)
#: 1
E: SOCIAL
WORKER
F: Neurology #: 1
E: TELEHEALTH
(PRIM)
#: 1
E:
(PRIM)
#: 1
E: NURSE
(PRIM)
#: 1
E: Neurology Procedure
#: 1
E: STORAGE
(PRIM)
E:
(PRIM, NUR,
SOCIAL WORK)
#: 1
E: RECEPTION
(ACS)
#: 3
E:
(ACS)
#: 1
E: N STA
(ICU)
#: 6
E: PATIENT
(ACUTE SERV)
T:Infusion Room during Construction
Project
E: PATIENT
(ACUTE SERV)
E: SHOWER
(ACUTE SERV) E: PATIENT
(ACUTE SERV)
E: BATH
(ACUTE SERV)
E: BATH
(ACUTE SERV)
E: CLOSED FOR
REPAIRS
(ACUTE SERV) E: ICU NR 1
(ACUTE SERV)
E: PATIENT
(ACUTE SERV)
HOUSE−
KEEPING
E: STORAGE
(ACUTE SERV)
E: TUB ROOM
(ACUTE SERV) MEN
BATHROOM STAIRS
E: O2 STOR
(ACUTE
SERV)
E: KITCHEN
E: OFFICE
(ENDOSCOPY)
#1
E: DECONTAM
(STERILE
PROCESSING)
#: 5
E:STERILE/PACK
(STERILE
PROCESSING)
#: 6
E: OFFICE
(STERILE
PROCESSING)
#: 2
E: BATHROOM
(STERILE
PROCESSING)
E: ANTE
(STERILE
PROCESSING)
E: LOCKER
(STERILE
PROCESSING)
E: SCOPE
(STERILE
PROCESSING)
#1
E: CART WASH
(STERILE
PROCESSING)
E: CLEAN SPLY
(STERILE
PROCESSING)
E: DETER
(STERILE
PROCESSING)
E: TECH WK
(STERILE
PROCESSING)
E:EQUIP STOR
(SURGERY)
E:OR 1
(SURGERY)
#2
E:OR MNGR
OFFICE
(SURGERY)
#1
E:HSKPG
(SURGERY)
E:TRASH &
LINEN
(SURGERY)
E:SOIL HOLD
(SURGERY)
E:ORTHO
EQUIP
STORAGE
(SURGERY)
E:SEMI RES
CORR
(SURGERY)
E:MED GAS
STOR
(SURGERY)
E:HSKPG
(SURGERY)
E:EQUIP STOR
(SURGERY)
E:PLATFORM
ACCESS
CORR
EXIT
PASS
STAIRS
ELEC
COMM
MFR STOR
(STERILE
PROCESSING)
EQUIP STOR
(STERILE
PROCESSING)
E:OR 3
(SURGERY)
#2
E:OR 4
(SURGERY)
#2
E:STERILE
SUPPLY
(SURGERY)
E:CLEAN CORE
(SURGERY)
E:OR 2
(SURGERY)
#2
COMMELEC
CORR
STAIRS
E:SEMI RES
CORRIDOR
(SURGERY)
E:F TLT/SHWR
(SURGERY)
E:M TLT/SHWR
(SURGERY)
E:STAFF WK
(SURGERY)
#4 E:STAFF
LOUNGE
(SURGERY) E:SURGICAL
SERVICES
(SURGERY)
#3
E:ANESTHETIC
WORK & OFFICE
(SURGERY)
#5
E:ENDO 2
(SURGERY)
#1
E:CLEAN SPLY
(SURGERY)
E:CLEAN UP
(SURGERY)
E:ENDO 1
(SURGERY)
#1
MECH 3
E:CLEAN CORE
(SURGERY)
E:OR ASST
(SURGERY)
E:SEMI RES
CORR
(SURGERY)
E: PACU
(SURGERY)
E: N STA.
(SURGERY)
#6
E: NOUR
(SURGERY)
E: ACC TLT
(SURGERY)
E: ACC TLT
(SURGERY)
E: PASSAGE
(SURGERY)
E: ACC TLT
(SURGERY)
E: LINEN
(ACUTE
SERV)
E: NURSE
SERVICES
(ACUTE
SERV)
#5
E: CLEAN
SUPPLY
(ICU)
E: NITROGEN
MANIFOLD
(ICU)
E: OFFICE
(ENDOSCOPY)
#: 1
E: HSKPG
(ICU)
#: 1
E:ALCOVE
(SURGERY)
ELEC
ELEV
E: EQUIP
STORAGE
(ICU)
E: ICU 5
(ICU)
E: ICU 4
(ICU)
E: ICU 3
(ICU)
#1
E: ICU 2
(ICU)
#1
CORR
(ICU)
PASSAGE
(ICU)
STAFF
BATH
(ICU)
E: SOIL WORK
(ICU)
CORR
E: PRE OP
(SURGERY)
E: EQUIP
ALCOVE
(SURGERY)
E: STORAGE
(ACUTE
SERV)
E: OFFICE
(ACUTE
SERV)
E: BATHROOM
(ACUTE
SERV)
E: MAINT−
ENANCE
(ACUTE
SERV)E: PATIENT
(ACUTE
SERV)
CORR
CORR
CORR FX
CORR
CORR EX
E: ANTE
(ACUTE SERV)
E: BREAK RM
(ACUTE
SERV)
BATHROOM TELECOM
E: DICT
(ACUTE
SERV)
#2
CORR
E: SOILWK
(ACUTE
SERV)
CORR
E:Infusion
JANITOR
CLOSET
E: OFFICE
(ACUTE
SERV)
#1
WAITING
ROOM
MAINTENCE
ROOM
STAIRSELEC
CLOSET
CORR
STAIRS
MECHANICAL
BATHROOM
STORAGE
STAIRS BATHROOM BATHROOM
STAIRS
E:Family/Friends Waiting Room
T:Chief of Police #: 1
CORR
CORR
E:HOLIDAY
CLOSET
E: BIOMEDICAL
ENGINEERING
(BIO−MED)
UTILITY
CLOSET
E: SCHEDULER
Food & Nutrition
Svc #1
E: RECEPTION
(F&N Svc) #1
E: COUNSELOR
(F&N Svc)
#1
E: WEIGHING
(F&N Svc)
E: COUNSELOR
(F&N Svc)
#1
E: COUNSELOR
(F&N Svc)
E: CHEM
(F&N Svc)
E: CHIEF’S
OFFICE
(F&N Svc) #1 PAPER
SUPPLY
E: FREEZER
(F&N Svc)
E:Kitchen Food and Nutrition
Services
E: SUPPLEMENT
(F&N Svc)
E: DAIRY REF
(F&N Svc)
E: PRODUCE
REF
(F&N Svc)
E: STAIRS
E: ELEC
E: OFFICE
(Kitchen)
#2
E: OFFICE
(Kitchen)
E: BIO−MED
(BIO−MED)
LOBBY
E:SEMI
RES
CORRIDOR
(SURGERY)
E:EQUIP
ALCOVE
(SURGERY)
UP
LAV
LAV
WC
WC
ROOF
44164420
4418 4417
4414 4409
4407 4406
4405 4003
4006 40084007
4009 4011
40244021
40254022 4027
40314029
E: BATHROOM
MALE
S−3 P−2 P−1
ELEC
E:Qual(2)
RM/SPHM;
Transfer Coord
E: CADRIO
PULMINARY
SUPERVISOR
#1
E: ASSOC CHIEF
OF STAFF fpr Primary and Ancillary Services
#2
E:Sec Chief Accute Care
F:AO
Accute Care
#1
E:Dir. CLC F:Sec Chief Accute Care
#1
CORR
STAIRS
E: Vacant #1
E: PULMON−
OLOGIST
#1
E: AO Primary Care T: Dr. Hundley
F:ACOS Accute Care #1
E: QUAL(2)
Cred & Priv;
Ut Mgt
E: PACT Panels #1
E: ADMIN
ASSIST
#1
E:Locum Acute Care F:Dir CLC & Student
#2
E:Geriatrics #2
HOUSE−
KEEPING
STAIRS
STORAGE
E: MOD
QUARTERS
#1
E:Midlevel − Acute Care #4
E:Conference I:15−102−2020
F:Clinical
E:
I:15−102−2020
F:Clinical
E:VACC(7)
I:15−102−2020
F:Clinical
E:VACC Sup(1) I:15−102−2020
F:Clinical
E:VACC(6)
I:15−102−2020
F:Clinical
E:VACC(4)
I:15−102−2020
F:Clinical
E:VACC(4)
I:15−102−2020
F:Clinical
E:VACC(3)
I:15−102−2020
F:Clinical
E:VACC(1)
I:15−102−2020
F:Clinical
T:Furniture storage EMS March 2018
I:15−102−2020 F:Clinical
Kitchen
4002/4003/4001 E:Chaplain
E:CONFERENCE
S−3 P−2 P−1
E: STRG
F: INVEN MNGR
F: PURCH MNGR
(LOGISTICS)
E: EYEWASH
(LOGISTICS)
E: HOUSE−
KEEPING
(LOGISTICS)
E: STORAGE
& BREAK OUT ROOM
F: SUPPLY TECH(2)
(LOGISTICS)
E: CLEAN STORAGE
& ISOLATION CART
(LOGISTICS)
E: CLEAN STORAGE
(LOGISTICS)
ELEC
PTL CLOSET
E: LOCKER RM
E: STORAGE RM
(LOGISTICS)
E: PTL CLOSET
(LOGISTICS)
STAIRS
E: SPPLY CHAIN
MNGT SERVICES
#1
E:STORAGE RM
F: EMS OFFICE
(LOGISTICS)
LOBBY
E:Physicians − Acute Care #4
E: TEAM
ROOM
(LOGISTICS)
T:TeleHealth
Equipment Staging Mid
November
I:15−102−2020
F:Clinical
TOILET
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
DAY ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
ELEC.
ROOM
5008A
H.A.C.
5008B
LAUNDRY
UTIL.
CONF.
ROOM
NURSE STATION
SECLUSION
ROOM
CONTROLLED
USE
TOILET
5010A
ISOLATION
ROOM
TOILET
TOILET
TOILET
5431X
TOILET
5419A
ELEC. CLO.
TOILET
5431A
54185417
5431A
TOILET
DATA CLO.
DATA CLO.
5412 5411
TOILET
LAUNDRY
CLOSET
5400A
VESTIBULE
V 1
VESTIBULE
5010B
TOILET
WAITING ROOM
ELEC. CLO.
5203 5202
S−3 P−2 P−1
E: Nursing #5
(PACU)E: Patient Room #1
(PACU)
E: Patient Room #1
(PACU)
E: Patient Room #1
(PACU)
E: Patient Room #1
(PACU)
E: Patient Room #1
(PACU)
(female room)
E: Patient Room #1
(PACU)
E: Patient Room #1
(PACU)
E:2 patient
(PACU)
E: Patient Room #1
(PACU)
(female room)
E: Patient Room #1
(PACU)
(female room)
(kept empty for shower use)
E: Patient Room #1
(PACU)
(female room)
E: ICU equip storage
(PACU)
E: Telehealth Manager
#1
E: Clean Linen Closet
E: Dirty Utility (Podiatry)
E: Telehealth Tech Mgr 1 workstation
E: Exam Room #1
(Podiatry)
E: Exam Room #1
(Podiatry)
E: Retinal Imagery
#1 (Telehealth)
E: Clinic #1
(Telehealth)
E: Exam room #1
(Podiatry)
E: Exam Room #1
(Podiatry)
E: Nurse stations #4
(Podiatry)
E: Storage (Podiatry)
E: Team Room
(PACU)
E: Clean Supply
(PACU)
E: Dirty Utility
(PACU)
E: Nurse manager
(Mental Health)
E: Storage
E:Infection control (Quality)
PATIENT
ROOM
UP
DN
UP
DN
S−3
6006 6009
6403 6004
P−2 P−1
S−3
60016010
6203 6204
Associate Director for Patient Care Svcs
Chief of Staff AO to Chief of Staff
Dep Ass Director for Patient Care Svcs
AO for Patient Care Svcs
Group Practice Mgr +1
Kitchen
Conference Room Facility Planner / AO for Director
Director
IT
Associate Director AO for Associate Director
AA for Director
Work/ File Room
Secretaries (3)
Coat Closet Housekeeping Closet
Waiting Vestibule
Mech Plumb
Elec
Men’s
Stair ______
Corridor
Corridor
Stair ____
Stair 3
Women’s
Storage
C o rr id o r
DN
UP
METAL
LADDER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:1
P M
G-102
LIFE SAFETY PLAN
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
SCALE: 1/32" = 1'-0"G-102
1 SECOND FLOOR PLAN
SCALE: 1/32" = 1'-0"G-102
2 THIRD FLOOR PLAN
SCALE: 1/32" = 1'-0"G-102
3 FOURTH FLOOR PLAN
SCALE: 1/32" = 1'-0"G-102
4 FIFTH FLOOR PLAN
SCALE: 1/32" = 1'-0"G-102
5 SIXTH FLOOR PLAN
SCALE: 1/32" = 1'-0"G-102
6 SEVENTH FLOOR PLAN
Item # Flr. Room No.
Use/ Location
Brief Description Solution
1 B Mechanical Multiple locations in ceiling assembly that are not properly protected with thru penetration fire stop assembly.
12 1 Stair Penetrations exist in rated stair enclosure at basement.S8
13 1 Data Penetration through floor assembly is not properly protected with thru penetration fire stop assembly.2664
14 1 Penetration through ceiling assembly (floor drain) is not properly protected with thru penetration fire stop assembly.2663 Mechanical
1 Construction Type does not appear to match required construction type for Building 1. Unprotected steel structures members are present.
125027 Mechanical
1 Penetration smoke barrier is not properly protected to limit the transmission of smoke.142947 Corridor
1 There is a gap at the headwall joint in the 2 hour hour fire resistive wall. The wall is required to be 2 hour fire resistive when containing emergency electrical systems.
163451 Mechanical
1 163356 Mechanical Penetration through ceiling assembly (floor drain) is not properly protected with thru penetration fire stop assembly.
2 266362 Mechanical Penetration through floor and ceiling assembly is not properly protected with thru penetration fire stop assembly.
2 200267 Corridor Penetration through fire barrier (elevator shaft) is not properly protected with thru penetration fire stop assembly.
2 220670 Mechanical Penetration through ceiling assembly is not properly protected with thru penetration fire stop assembly.
3 Penetration smoke barrier is not properly protected to limit the transmission of smoke.302580 Check In
4 420088 Corridor Shaft Wall is not continous.
4 400489 Corridor Penetration through fire barrier (elevator shaft) is not properly protected with thru penetration fire stop assembly.
4 442290 Penetration through ceiling assembly is not properly protected with thru penetration fire stop assembly.Corridor
4 S591 Stair Penetration through fire barrier (stair shaft) is not properly protected with thru penetration fire stop assembly.
6 6209100 Mechanical Penetration through floor assembly (abondoned duct) is not properly protected with thru penetration fire stop assembly.
6 6406105 IT Penetration through floor assembly (hatch) is not properly protected with thru penetration fire stop assembly.
136 Quick response and Standard response sprinklers are installed in the same fire area.Mailroom1218
139 Sprinklers are located less than 6 feet apart.Waiting1402
S4 by CLC ramp
34-103
Stair
Stair Discharge
Exterior Stair
Conduit installed within stair enclosure that does not serve the stair.
It appears that a failure of the single lighting unit would result in an unacceptable level of illumination at the exit discharge.
It appears that a failure of the single lighting unit would result in an unacceptable level of illumination at the exit discharge.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 7/AS112 and 8/AS112
Pack assembly with fire barrier packing material and seal with fire caulk. See details 9/AS112 and 10/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 7/AS112 and 8/AS112
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk - paint exposed structural steel with spray applied fire protection.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 9/AS112 and 10/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 3/AS112 and 4/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See details 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 3/AS112 and 4/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 7/AS112 and 8/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 3/AS112 and 4/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 3/AS112 and 4/AS112.
Pack assembly with fire barrier packing material and seal with fire caulk. See detail 3/AS112 and 4/AS112.
Install new emergency light fixture with battery backup EU2LM12 by Lithonia Lighting or approved equal - connect to nearest power source.
Install new emergency light fixture with battery backup EU2LM12 by Lithonia Lighting or approved equal - connect to nearest power source.
Extend Shaft wall to underside of deck - install two layers of 5/8" Type-X Gyp. board on each side. Prime and paint two coats, floor to ceiling, corner to corner.
Pack assembly with fire barrier packing material and seal with fire caulk. See similar to details 7/AS112 and 8/AS112.
2 266461 Data Penetration through floor assembly is not properly protected with thru penetration fire stop assembly. Pack assembly with fire barrier packing material and seal with fire caulk. See details 9/AS112 and 10/AS112.
260 Quick response and Standard response sprinklers are installed in the same fire area.Corridor2709
379 Quick response and Standard response sprinklers are installed in the same fire area.3000 Corridor
7 7001106 Penthouse Penetration through floor assembly (hatch) is not properly protected with thru penetration fire stop assembly. Pack assembly with fire barrier packing material and seal with fire caulk. See detail 3/AS112 and 4/AS112.
Redistrubute sprinkler line to allow 12' head to head
Remove quick response and install standard heads
Remove quick response and install standard heads
Remove quick response and install standard heads
Section 7.1.3.2.1.10.i of NFPA 101 states that all exist penetrations for conduit in stairs are allowed.
125 Quick response and Standard response sprinklers are installed in the same fire area.Pharmarcy1006 Remove quick response and install standard heads
34 1 1243 Dock It appears that a failure of the single lighting unit would result in an unacceptable level of illumination at the exit discharge.
Install new emergency light fixture with battery backup EU2LM12 by Lithonia Lighting or approved equal - connect to nearest power source.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:0
P M
AS001
KEY NOTE CHART
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
MATCH
LINE
MATCH
LINE
KEY PLAN - NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\K n ie h a u s \D o c u m e n ts
\1 .1
.0
V A
G ra n d
J u n c ti o n
F ir e
B a rr ie r M it ig a ti o n
V k n ie h a u s g u id o n d e s ig n .c o m
.r v t
/1 /2
:3
:0
P M
AS101
BASEMENT FLOOR PLAN - NORTH
GUIDON DESIGN INC.
905 N. CAPITOL AVENUE SUITE 100
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
FIRE BARRIER MITIGATION,
BUILDING 1
GRAND JUNCTION, CO
575-17-102
BLDG 1
11/19/2018 JG KN
100% BID DOCUMENTS
SCALE: 3/32" = 1'-0"AS101
1 BASEMENT FLOOR PLAN - NORTH
N
SEE KEYNOTES ON SHEET AS001
MATCH
LINE
MATCH
LINE
ARCHITECTURAL GENERAL NOTES
A
B
C
D
VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
PATCH EXISTING WALLS WHERE NEW WALLS MEET.
PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ADA REQUIREMENTS.
WHERE NO DIMENSION IS INDICATED, FINISH DOORS 6" FROM EDGE OF
STUD FRAMING AT CORNERS UNLESS OTHERWISE NOTED.
KEY PLAN - SOUTH
Item # Flr. Room No.
Use/ Location
Brief Description Solution
1 B Mechanical…