36C25919R0086-005.pdf

PDF 33 KB Posted

Attached to
Renovate 7 East (VA-19-00024846)
Solicitation number
36C25919R0086
Issued by

About this file

36C25919R0086 ASI 1 - 117300 patient lifts 05.pdf

View the file

Other files

File Type Posted
36C25919C0174-000.docx DOCX document
36C25919R0086-0010000.docx DOCX document
36C25919R0086-0010001.pdf PDF
36C25919R0086-0009001.pdf PDF
36C25919R0086-0009000.docx DOCX document
36C25919R0086-0008000.docx DOCX document
36C25919R0086-0008001.pdf PDF
36C25919R0086-0007000.docx DOCX document
36C25919R0086-0006003.pdf PDF
36C25919R0086-0006001.pdf PDF
36C25919R0086-0006002.pdf PDF
36C25919R0086-0006000.docx DOCX document
36C25919R0086-0005002.pdf PDF
36C25919R0086-0005001.pdf PDF
36C25919R0086-0005000.docx DOCX document
36C25919R0086-0005006.pdf PDF
36C25919R0086-0005004.pdf PDF
36C25919R0086-0005005.pdf PDF
36C25919R0086-0005003.pdf PDF
36C25919R0086-0004000.docx DOCX document
36C25919R0086-0003001.pdf PDF
36C25919R0086-0003000.docx DOCX document
36C25919R0086-0002000.docx DOCX document
36C25919R0086-0002002.pdf PDF
36C25919R0086-0002001.pdf PDF
36C25919R0086-0001001.pdf PDF
36C25919R0086-0001000.docx DOCX document
36C25919R0086-016.pdf PDF
36C25919R0086-022.pdf PDF
36C25919R0086-009.pdf PDF
36C25919R0086-020.pdf PDF
36C25919R0086-008.pdf PDF
36C25919R0086-011.pdf PDF
36C25919R0086-040.pdf PDF
36C25919R0086-003.docx DOCX document
36C25919R0086-035.pdf PDF
36C25919R0086-032.pdf PDF
36C25919R0086-024.pdf PDF
36C25919R0086-038.pdf PDF
36C25919R0086-006.pdf PDF
36C25919R0086-028.pdf PDF
36C25919R0086-018.pdf PDF
36C25919R0086-036.pdf PDF
36C25919R0086-029.pdf PDF
36C25919R0086-044.pdf PDF
36C25919R0086-030.pdf PDF
36C25919R0086-042.pdf PDF
36C25919R0086-004.pdf PDF
36C25919R0086-026.pdf PDF
36C25919R0086-019.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA CITY VA HEALTH CARE SYSTEM

OKLAHOMA CITY, OKLAHOMA

635-16-101 RENOVATE 7 EAST

BID DOCUMENTS

11 73 00 - 1

CEILING MOUNTED PATIENT LIFT SYSTEM

SECTION 11 73 00

CEILING MOUNTED PATIENT LIFT SYSTEM

PART 1 - GENERAL

1.1 DESCRIPTION

Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.

B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS: Seismic requirements for non-structural equipment.

C. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General

Electrical Requirements and items, which are common to sections of

Division 26.

1.3 QUALITY ASSURANCE

A. Certification for compliance is required for Ceiling Mounted Patient

Lift Systems. Certifications shall be provided by an independent third party who will conduct testing to ensure that the ceiling lift and charging system are safe and in compliance with ISO 10535 & UL 60601-1

B. Inspection of equipment after installation is required prior to use for patient movement. Inspection shall be in accordance with manufacturer’s installation checklist and the facilities installation checklist

(Patient Safety Alert AL14-07).

1.4 SUBMITTALS

A. Submit in accordance with specification Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES.

B. Certificates of Compliance

C. Manufacturer's Literature and Data:

1. Lifting Capacity

2. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.

D. Individual Room layouts showing location of lift system installation shall be approved before proceeding with installation of lifts.

E. Manufacturer’s Checklist for after installation inspection.

635-16-101 RENOVATE 7 EAST

BID DOCUMENTS

11 73 00 - 2

CEILING MOUNTED PATIENT LIFT SYSTEM

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are listed in the text by the basic designation only.

B. International Organization for Standardization (IOS):

10535-06................Hoist for the Transfer of Disabled Persons-

Requirements and Test Methods

C. Underwriters Laboratories (UL):

60601-1(2003)...........Medical Electrical Equipment: General

Requirements for Safety

94-2013.................UL Standards for Safety Test for Flammability of Plastic Materials for Parts in Devices and

Appliances-Fifth Edition

D. International Electromagnetic Commission (IEC):

801-2(1991).............Electromagnetic Compatibility for Industrial-

Process Measurement and Control Equipment-Part

2: Electromagnetic Discharge Requirements

E. Patient Safety Alert AL14-07

PART 2 - PRODUCTS

2.1 CEILING TRACK SYSTEM

The Ceiling Track shall be made from high strength extruded aluminum

T66081-T5 at a thickness of 3/16” (4.8mm). Provide anchor supports at a minimum 3 per linear foot at ceiling substrate. The ceiling track shall be finished with baked enamel paint. The fixed ceiling tracks shall be recessed with a dropped traverse rail as shown per architectural drawings. The recessed tracks to be installed with bottom edge of track installed below ceiling finish to ensure the active traverse rail does not conflict with ceiling fixtures. The fixed tracks shall be held the minimum below finish ceiling to align with the active rails of the ceiling track system.

2.2 LIFT UNIT

A. The Lift Unit shall be constructed of a steel frame system driven by a gear reduced high torque motor.

B. The Lift system shall have the following features.

1. Lifting capacity: standard 440 lbs (200 kg); 800 lbs (363 kg)for bariatric and isolation room applications.

635-16-101 RENOVATE 7 EAST

BID DOCUMENTS

11 73 00 - 3

CEILING MOUNTED PATIENT LIFT SYSTEM

2. Electronic soft-start and soft-stop motor control

3. Emergency lowering device

4. Emergency stopping device

5. Current limiter for circuit protection in case of overload.

6. Safety device that stops the motor to lift when batteries are low.

7. Emergency brake (in case of mechanical failure)

8. Strap length up to 90in (2.3m) tested for 2998lbs (1360kg)

9. Cab: VO plastic–fire retardant, UL 94

10. Traverse switch for transfer between rooms shall be provided as indicated on the drawings.

2.3 BATTERIES

A. The life cycle (number of charging cycles) for batteries shall be in compliance with IEC 801-2.

B. Provide rechargeable batteries with up to 120 transfers with a load of

200lbs (74kg) and up to 70 transfers with its maximum load of 440lbs

(200kg) a minimum of 50 transfers with its maximum load of 800lbs.

2.4 CHARGER

A. Charger Input: 100-240 Vac, 50/60 Hz.

B. Charger Output: 27 Vdc, 1 A max.

C. Supplemental to the charger provide a clip-on charging station with indicator lights.

2.5 STRAPS AND SLING

A. The straps shall be made of threaded nylon. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.

B. The sling shall be made from a polyester/nylon net material that is pliable, breathable and easy to use. The sling shall cradle the body of the patient.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings.

B. If the distance in between the suspended ceiling and anchors is more than 18” consult with manufacturer to determine if lateral braces will be required.

635-16-101 RENOVATE 7 EAST

BID DOCUMENTS

11 73 00 - 4

CEILING MOUNTED PATIENT LIFT SYSTEM

3.2 INSTRUCTION AND PERSONNEL TRAINING

Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.

3.3 TEST

Conduct performance test, in the presence of the Resident Engineer and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements.

3.4 INSPECTION

Inspection of installed ceiling mounted patient lift systems shall be conducted in accordance with the manufacturer’s installation checklist and the facilities installation checklist (Patient Safety Alert AL14-

07) prior to use for patient movement.

- - - E N D - - -