36C25918Q0420-013.doc
DOC document 78 KB Posted
- Solicitation number
- 36C25918Q0420
About this file
36C25918Q0420 QASP_ Janitorial Services.doc
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25919C0195-000.docx | DOCX document | |
| 36C25918Q0420-0002001.pdf | ||
| 36C25918Q0420-0002000.docx | DOCX document | |
| 36C25918Q0420-0001002.docx | DOCX document | |
| 36C25918Q0420-0001000.docx | DOCX document | |
| 36C25918Q0420-0001001.docx | DOCX document | |
| 36C25918Q0420-0001003.pdf | ||
| 36C25918Q0420-006.pdf | ||
| 36C25918Q0420-005.pdf | ||
| 36C25918Q0420-010.pdf | ||
| 36C25918Q0420-008.pdf | ||
| 36C25918Q0420-002.docx | DOCX document | |
| 36C25918Q0420-004.pdf | ||
| 36C25918Q0420-007.pdf | ||
| 36C25918Q0420-011.pdf | ||
| 36C25918Q0420-001.docx | DOCX document | |
| 36C25918Q0420-012.pdf | ||
| 36C25918Q0420-009.pdf | ||
| 36C25918Q0420-003.docx | DOCX document | |
| 36C25918Q0420-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place?
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. Government Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
3. Contractor Representatives
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – As assigned by facility
b. Other Contractor Personnel - As assigned by facility
4. Performance Standards Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Note: Refer to Table below.
| Required Services |
| Performance Standards |
| Acceptable Performance Levels |
| Methods of Surveillance |
| Frequency of Inspections |
| PWS Reference |
| Trash Removal from Unoccupied Buildings |
| All trash removed daily. |
| No trash is found visible in any of the VAMC owned buildings during 95% of the reviews by VAMC staff. |
| Periodic visual inspections made by COR, VA EMS Supervisor, VAMC Activation Project Team Members. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.5
| Terminal Cleaning |
| Remove moveable objects in the room, clean horizontal/vertical surfaces, lighting and air ducts. Clean everything downward from the ceiling to the floor, working out of the room. Items that are removed from the room during the terminal cleaning process are disinfected, sanitized, and/or decontaminated prior to returning to the room. |
| No visible dust, dirt or debris in any of the VAMC owned buildings during 95% of the reviews by VAMC staff. |
| Visual inspection performed by COR or VAMC EMS Supervisor that provides a ‘go / no-go’ evaluation of work completion. This work is not considered complete until this acceptability is provided. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.1, 4.1.6, 4.1.8, 4.1.9, 4.2.1
| Bathroom cleaning |
| Restrooms that are identified as dirty during weekly inspections are cleaned within 48 hours of identification. |
| Toilets are free of waste, debris ‘rings’, dirt and stains 95% of the time. |
| Periodic visual inspections made be COR, VA EMS Supervisor or VAMC Activation Project Team Members. Customer feedback. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.6, 4.1.7, 4.2.1, 4.2.2
| Floor Maintenance - Waxed |
| Floors to maintained on a daily basis and are to be free from dirt, dust, debris, scuff and heel marks as needed. Buffed, shiny appearance maintained. |
| Waxed floors buffed with shine free from all dust, dirt, and debris 95% of the time. |
| Periodic visual inspections made by COR, VA EMS Supervisor or VAMC Activation Project Team Members. Customer feedback. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.2
| Floor Maintenance - Carpeted |
| All carpeted floors are to be free from, dust, dirt, and debris Shampooed as needed with particular attention to high traffic areas. Spot cleaning of carpets to be performed when spills, stains, and odors are identified. |
| Carpeted floors are to be free of dust, dirt, and debris and odors 95% of the time. |
| Periodic visual inspections made by COR, VA EMS Supervisor or VAMC Activation Project Team Members. Customer feedback. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.8, 4.1.9, 4.1.11
| High/Low Dusting |
| All horizontal surfaces free from dust, dirt, and debris. Window sills and blinds dusted and spot cleaned weekly. Concourse window borders (up to 8 feet) to be dusted weekly. Ceiling, intake registers, speakers, foyer surfaces, foyer door jams, tops of exit signs, as well as piping in the service level concourse are to be free of dust and debris. |
| Horizontal surfaces, window borders and sills, hand rails, baseboards, are to be free of dust, dirt, and debris 95% of the time. |
| Periodic visual inspections made by COR, VA EMS Supervisor or VAMC Activation Project Team Members. Customer feedback. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
4.1.13
| Stairwells |
| Stairwells and stairsteps are to be free of dust, dirt, and debris. Stairwell floors are to be swept and mopped. Handrails and door knobs are to be disinfected with VA approved germicidal solution. |
| Stairwells and stairsteps are to be free of dust, dirt, and debris 95% of the time. |
| Periodic visual inspections made by COR, VA EMS Supervisor or VAMC Activation Project Team Members. Customer feedback. |
| Inspections to occur weekly. COR will record date and time of the inspection. COR will notify supervisor or quality inspector if inspection indicates unacceptable performance. |
| 4.1.12, 4.2.1, 4.2.3 |
DELIVERABLES:
| Deliverable |
| Due Date |
| PWS |
Reference Distribution
| Ensure training requirements for the VA are met |
| Provide completed training certificates before beginning work. |
| 5.2 |
| COR will maintain electronic file of training certification for The Contractor staff. |
COR and CO
| Ensure VA security measures are met. The Contractors must have background check completed before starting work |
| Provide completed passing background checks/ any associated completed training certificates. Fingerprinting, Background check, and PIV Badging are mandatory before any and all contract staff can begin work. |
| 5.4 |
| COR will initiate Fingerprinting and PIV badging process. The Contractor Supervisor will email COR a Log of employees and report staffing changes weekly. |
COR and CO
| Conduct inspections to guarantee compliance |
| Provide a weekly inspection report beginning two weeks after contract execution date. |
| 12.1 |
12.1.3 The Contractor Supervisor will forward Weekly Inspection Reports to the COR.
COR and CO
5. Incentives/RATING STANDARDS Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. Methods of QA Surveillance
Various methods exist to monitor performance.
a. Direct Observation
b. Periodic Inspection
c. User Survey
d. Validated User/Customer Complaints
e. Inspection
f. Periodic Sampling
g. Random Sampling
h. Progress or Status Meetings
i. Analysis of Contractor’s Progress Reports
7. Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE The Government shall document positive OR NEGATIVE performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE performance When unacceptable performance occurs, the COR shall work with the Contracting Officer (CO) inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file. To assure that the contractor receives impartial, fair, and equitable treatment under this contract, the COR will work with the contractor to increase performance to an acceptable level.
When the COR and CO determines formal written communication is required, the COR and CO shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. Frequency of Measurement
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.
Signature – Contractor
Date Name:
Signature – Contracting Officer Representative
Date Name:
See above Acceptable Performance Level & Method of Surveillance located in QASP
File details come from the government source that posted it.