This document provides details for a federal contract opportunity to upgrade IT closet storage areas at the New Mexico VA Healthcare System. The solicitation seeks general construction and alteration services to demolish and replace items and upgrade closet lighting and HVAC systems. Offerors must be registered in SAM.gov and VetBiz.gov. The period of performance is 365 calendar days from notice to proceed. The magnitude of the project is between $2 million and $5 million, and it falls under NAICS code 236220 for commercial and institutional building construction. The small business size standard is $36.5 million. A minimum of 15% self-performance is required in accordance with FAR 52.204-7 and VAAR 804.1103-70. Interested parties are encouraged to register on SAM.gov to receive notifications regarding the solicitation and any amendments.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT REVIEW

DATE: APPROVED: DIRECTOR

DATE: APPROVED: ASSOCIATE DIRECTOR

DATE: APPROVED: ASSISTANT DIRECTOR

DATE: APPROVED: CHIEF OF STAFF

DATE: APPROVED: CHIEF ENGINEER

DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES

DATE: APPROVED:

DATE: APPROVED:

ALBUQUERQUE

INTERNATIONAL

AIRPORT

GIBSON BLVD SE

RAYMOND G.

MURPHY VA MEDICAL

CENTER

I-25

S A

N M

A T

E O

B L

V D

S E

Y A

L E

B L

V D

S E

SUNPORT BLVD

PROJECT

LOCATION

ALBUQUERQUE

INTERNATIONAL

AIRPORT

GIBSON BLVD SE

CENTRAL AVE SE

RAYMOND G.

MURPHY VA

MEDICAL

CENTER

W Y

O M

IN

G

B L

V D

S E

CENTRAL AVE SE

I-25

I-25

I-40

S A

N M

A T

E O

B L

V D

S E

Y A

L E

B L

V D

S E

SUNPORT BLVD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/5

-1

-1

U p g ra d e I T

C lo s e ts

/5

-1

-1

V

A -A

B Q

B ld g

M

E P

.r v t

/2

/2

:5 :2

P

M

G-001

COVER SHEET

TRIPLE C The A/E Group

2266 S. Dobson Rd, Suite. 200

Mesa, AZ 85202

307-460-2054

Mat Perkins

UPGRADE IT CLOSET AREAS

1501 San Pedro Dr. SE, Albuquerque, NM 87108

501-17-110

07/02/2019 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

NEW MEXICO VA HEALTH CARE SYSTEM (NMVAHCS)

ISSUED FOR CONSTRUCTION SUBMISSION

JULY 02, 2019

VA PROJECT NO : 501-17-110

UPGRADE IT CLOSET AREAS

BUILDING 43

CLIENT:

Department of Veterans Affairs

Daniel Thelen Contracting Officer Office: 520.629.4830

Daniel.Thelen@va.gov

COR:

Byron Secatero

Office: 505.265.1711 x3844 Byron.Secatero@va.gov

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE________________________________ DATE ________________

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

THIRD-PARTY INSPECTIONS:

COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING

AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL

CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT.

THE VA HAS NO INSPECTION CAPABILITY. ANY REFERENCE TO VA INSPECTIONS

SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK.

CREDENTIALS SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE

TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR

OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE

ONLY, WHEN PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON

THE CONTRACTOR.

THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND

ON ANOTHER PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT

COMPLETE AND USABLE.

Sheet Index

Sheet Number Sheet Name

35% Submittal

65% Submittal

95% Submittal

100% Submittal

IFC

Submittal

IFC

Rev01

GENERAL

G-001 COVER SHEET 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-010 GENERAL PROJECT NOTES 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS 07/02/2019

G-012 GENERAL INDOOR AIR QUALITY NOTES 07/02/2019

GS101 GENERAL SITE PLAN 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-101 GENERAL REFERENCE PLAN - FIRST FLOOR - EXISTING 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-102 GENERAL REFERENCE PLAN - SECOND FLOOR - EXISTING 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-103 GENERAL REFERENCE PLAN - SECOND FLOOR - NEW 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

G-104 GENERAL REFERENCE PLAN - ROOF - NEW 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

ARCHITECTURE

A-001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS, & GENERAL NOTES 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-051 EXISTING SITE CONDITION PHOTOS 02/27/2019 04/24/2019 07/02/2019

A-151 ARCHITECTURAL ROOF - PROPOSED PLAN 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-401 ARCHITECTURAL ENLARGED PLANS 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-512 ARCHITECTURAL DETAILS 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-531 ARCHITECTURAL CEILING DETAILS 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

A-901 ARCHITECTURAL FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN 02/27/2019 04/24/2019 07/02/2019

INTERIORS

IN101 INTERIOR FINISH PLAN AND ROOM SCHEDULE 10/02/18 11/14/2018 02/27/2019 04/24/2019 07/02/2019

MECHANICAL

M-001 MECHANICAL LEGEND 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

M-102 MECHANICAL PLANS - SECOND FLOOR AND ROOF 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

M-701 MECHANICAL SCHEDULES 10/02/2018 11/20/2018 02/27/2019 04/24/2019 07/02/2019

M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

M-802 MECHANICAL CONTROL DIAGRAMS 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN 02/27/2019 04/24/2019 07/02/2019

ELECTRICAL

E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-002 OIT STATION STANDARD CLOSET 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-401 ENLARGED ELECTRICAL PLANS - SECOND FLOOR - DEFICIENCIES 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-402 ENLARGED ELECTRICAL PLANS - RECOMMENDED CORRECTIONS 07/20/18 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-501 ELECTRICAL DETAILS 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-601 ELECTRICAL DIAGRAMS 10/02/18 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-602 ONE LINE DIAGRAM 11/20/2018 02/27/2019 04/24/2019 07/02/2019

E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN 02/27/2019 04/24/2019 07/02/2019

E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN 02/27/2019 04/24/2019 07/02/2019

A. PROJECT SCOPE OF WORK

The purpose of this project is to provide a designed solution to address deficiencies associated with IT Closet Areas located within multiple buildings at the NMVAHCS. Multiple buildings on campus include Buildings 1, 2, 3, 4, 5, 6, 8, 10, 11, 18, 39, 41, 43, 45, and 46. Buildings 52 and 53 are in conformance with OIT requirements per OIT leadership and removed from the project at this time.

The Air Force ownes building 47 and was removed from the project per OIT leadership.

The OIT priority building order provided is: Buildings 11, 10, 5/6, 8, 3, 2, 43, 46, 45, 1, 4 ,41 Quadrants (BA, BD, BC, 1A,1B,1C,1D, 2A,2B,2C,2D, 3A,3B,3C,3D, 4B,4C,4D, 5A,5B,5C,5D, 6A,6D).

The construction shall include provisions for expanding the size of IT Closet Areas, addressing UPS deficiencies, grounding and bonding conditions within each closet, alarm monitoring, configuration of equipment within the closets such as cable trays/housings, rack configuration, sizing of sleeves for cabling, removing abandoned cable and addressing physical security needs. The construction shall provide new equipment rack(s) furnished with both horizontal and vertical cable managers, vertical bonding bars, UPS, patch panel and an optical fiber termination shelf. Scope will include re-pulling data drops associated with relocated equipment racks and the termination of optical fiber and all wire management is included in the scope of work.

Additionally, dedicated air conditioning units with monitoring shall be provided. The contractor shall ensure closets are enclosed smoke tight, provide access controls and video surveillance (per Physical security requirements), correct emergency power receptacles for UPS systems and monitoring and ensure cable management trays and removal of old CAT 3 cable infrastructure is documented.

Contractor shall develop and provide a complete set of ICRA drawings in coordination with the scope of each building for COR approval prior to construction. Provide limited construction period services as described in this and other sections of the contract and provide “as-builts” based on observation and contractors’ marked drawings.

LOCATION MAP NORTH

NORTHVICINITY MAP

BUILDING 43 SCOPE OF WORK:

Relocate existing mechanical and electrical infrastructure for new IT Closet on mezzanine, see 501-10-105 Optimize B43 Energy Plant Construct new IT Closet with new secure door (Qty. 1) and repair adjacent finishes, install new dry-agent fire sprinkler system Remove all flooring throughout, all Closets shall receive new wall base (Qty. 170 LF) and new paint (Qty. 815 SF) Remove and relocate existing signage as identified, or specified if no signage exists Provide a dedicated TIA-607-B telecom bonding (grounding) system including primary and secondary bonding bars, bond equipment racks and cable trays where applicable (Qty. 1 rooms) Provide new equipment rack with vertical wire management, bonding bar, 2U UPS unit (Qty. 2).

Provide 12”W x 4” H cable tray system (Qty. 50’-0”) Provide 6 port data jack and drop (Qty. 4) Install 42 data drops to existing data outlets, 100'-0" average length.

Provide L5-30R outlet (Qty. 2) Provide 3-Size 44 EZ-Path (Qty. 1) Provide 4’ linear LED strip light (Qty. 2) Provide occupancy sensor lighting control (Qty. 1) Install new mechanical split system cooling as secondary cooling (Qty. 1) Install access control and security hardware VA – CR needs to have a pin pad (C-CURE 9000, HSPD-12-Compliant, needs to be PIV ready (Qty. 1) VA – CCTV needs to be IC Realtime compliant, run to police operations B41, all digital Go from DVR’s to NVR’s (Qty. 1) No fiber optic expansions are required Slack needed in the cable to slide optical cable shelf

Revisions: Date:

TRIPLE C A& E GROUP, THE A-E OF RECORD FOR THE NEW MEXICO VA HEALTHCARE SYSTEM ON PROJECT 501-17-110, LOCATED IN ALBUQUERQUE, NEW MEXICO CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIAL (ACBM)

OR LEAD BASED PRODUCTS WERE DESIGNED/ SPECIFIED IN THE DESIGN.

AT TIME OF AS-BUILT DRAWINGS APPROVAL, THE A-E OF RECORD FOR THE NEW MEXICO VA HEALTHCARE SYSTEM ON PROJECT 501-17-110, LOCATED ALBUQUERQUE, NEW MEXICO CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) OR LEAD BASED PRODUCTS WERE APPROVED VIA ANY CONTRACT SUBMITTALS FROM THE CONSTRUCTION CONTRACTOR. TO THE BEST OF OUR KNOWLEDGE, AND BASED ON THE PRODUCT SUBMITTAL REVIEWS, ALL PRODUCTS USED FOR THE CONSTRUCTION ARE FREE OF ASBESTOS AND

LEAD.

A. CONTRACTOR SHALL FIELD VERIFY ALL NEW AND EXISTING CONDUIT, PIPE AND DUCT ROUTING IN THE AREA OR WORK, BETWEEN PROPOSED AND EXISTING IT CLOSETS AND FROM THE POINT OF BUILDING SERVICE TO NEW AND EXISTING IT CLOSET LOCATIONS. CONTRACTOR SHALL PROVIDE COORDINATION DRAWINGS IN COMPLIANCE WITH THE DIVISION 1, 21, 22, 23, 26, 27 AND 28 SPECIFICATIONS FOR VA/AE APPROVAL PRIOR TO COMMENCING ANY WORK. THESE COORDINATION DRAWINGS SHALL SHOW EXISTING AND PROPOSED CONDUIT, PIPE AND DUCT

ROUTING AND SHALL PROVIDE PROPER CLEARANCES AND ACCESS TO ALL SYSTEMS.

B. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING UNINTERRUPTED UTILITY SERVICE DURING THIS PROJECT. THIS WILL INCLUDE PROVIDING TEMPORARY UTILITIES AND APPROPRIATE PHASING TO ENSURE CHANGING OVER TO THE NEW OR RENOVATED IT CLOSETS DOES NOT RESULT IN DISRUPTIONS OF SERVICE. CONTRACTOR SHALL SUBMIT TEMPORARY UTILITY, PHASING AND SHUTDOWN/CHANGEOVER PLANS TO

THE VA/AE A MINIMUM (21) DAYS PRIOR TO COMMENCING ANY WORK.

C. CONTRACTOR IS RESPONSIBLE FOR ALL CABLING, TERMINATIONS AND OTHER ELECTRICAL AND COMMUNICATIONS CONNECTIONS ON THIS

PROJECT. VA PERSONNEL SHALL NOT BE RESPONSIBLE FOR ANY WORK IN THIS REGARD.

D. CONTRACTOR SHALL PROVIDE A THIRD-PARTY COMMISSIONING AGENT TO PERFORM THE COMMISSIONING SCOPE IDENTIFIED IN SPECIFICATION SECTIONS 01 91 00, 21 08 00, 22 08 00, 23 08 00, 26 08 00, 27 08 00 AND 28 08 00. PROJECT ACCEPTANCE BY THE GOVERNMENT IS CONTINGENT ON THE CONTRACTOR PROVIDING FULLY-COMMISSIONED IT CLOSETS FOR EACH BUILDING.

E. CONTRACTOR SHALL PERFORM ELECTRICAL LOAD TESTING ON THE PANELS IDENTIFIED IN SPECIFICATION 01 00 00, PRIOR TO COMMENCING WORK. THESE LOAD TESTS WILL VALIDATE CURRENT LOADS AND PANEL CAPACITY AT THE TIME OF CONSTRUCTION.

CONTRACTOR RESPONSIBILITIES:

Expires 6.30.16Expires: 6/30/1821

7/2 /19

ISSUED FOR CONSTRUCTION SUBMISSION

JANUARY, 21, 2020

Expires 6.30.16Expires: 6/30/1821

1/2 1/2

01/21/2019

Issue Date

01/21/202006/24/2020 Revision 1 06/24/2020

06/24/2020

BUILDING PRIORITY:

BASE BID: B1, B3, B11, B41 AND B45

ALTERNATE PRIORITY RANKING: B10, B4, B2, B8, B46, B43,B5/6, B39, B18

Expires 6.30.16Expires: 6/30/1821

6/2 4/2

06/24/2020

/2

4/

1/2 1/2

Expires 6.30.16Expires: 6/30/1821

6/2 4/2

Expires 6.30.16Expires: 6/30/1821

7/0 8/2

07/08/2020

F. ALL EXISTING CABLING SERVING EXISTING BUILDING DATA DROPS SHALL BE RETAINED AND REUSED. IT CLOSET SHALL BE RENOVATED WITH EXISTING

CABLING TO REMAIN.

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL

WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR TO

FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND

THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN

CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR

IMMEDIATELY.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES AND

LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER AND

PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT

INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL VERIFY

THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS. REPORT

DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK RELATED TO

ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH FOUNDATIONS, FLOORS, WALLS

AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL AS

APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL AND

ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED WITH COR.

SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

18. AN AIR QUALITY PERMIT WILL BE REQUIRED FOR THE GENERATOR FOR THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH THE ALBUQUERQUE VA AND AIR QUALITY

AUTHORITY HAVING JURISDICTION.

FIRE LIFE SAFETY NOTES

1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING

CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.

2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE

ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY

CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.

3. VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017,

REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS, SECTION 01 35 26 -

SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED CONSTRUCTION WORK.

FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION

1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES PER

LOCAL FIRE DEPARTMENT.

2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL TIMES

AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.

3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL

FIRE DEPARTMENT.

4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.

5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE CODES.

6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL FIRE

CODES.

7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES. TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE LOCAL FIRE DEPARTMENT.

8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.

9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME RETARDANT.

10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN

REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS MAY BE

SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.

11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE

ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND

DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL FIRE

DEPARTMENT IN THE FIELD.

FIRE ALARM

1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a" PROTECTION

OF THE INTERNATIONAL BUILDING CODE.

2. SUBMIT FOUR SETS OF PLANS TO STATE FIRE MARSHAL FOR APPROVAL PRIOR TO THE INSTALLATION.

3. SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE SUPERVISION &

POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING LOCATION OF ALL

COMPONENTS AND METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL OR LOCAL FIRE

DEPARTMENT.

4. THE FIRE ALARM SYSTEM SHALL CONFORM TO IFC 2012 STANDARDS AND APPLICABLE NFPA

STANDARDS. FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO STATE MARSHAL FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A

SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE

ENFORCING AGENCY.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE

EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH

EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL

EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.

FIRE SPRINKLER SYSTEM

1. FM200 SYSTEM TO BE INSTALLED IN ACCORDANCE WITH 2018 NFPA 2001.

2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS TO BE INSTALLED IN ACCORDANCE WITH 2016

NFPA 13.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE

PERMISSIBLE.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE OFFICE BUILDING IS EQUIPPED WITH A

FIRE SPRINKLER AND FIRE ALARM SYSTEM.

EXIT AND EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE

DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC GUIDELINES.

RATED DOOR AND WINDOW ASSEMBLIES

2. THE ROOM BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES

NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY

NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.

4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH- PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF

THE DOOR.

5. LEVEL FLOOR OR LANDING: THIS STRUCTURE IS AN UN-OCCUPIED BUILDING AND NOT REQUIRED TO BE

ACCESSIBLE.

6. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

7. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED

WITH A UL APPROVED METHOD AND MATERIAL APPROVED BY BUILDING.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM DIMENSIONS WITH

ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS CONTRACTOR

SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION

RELATED TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION

TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO

OUTSIDE GRIDLINE) AS SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE

PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE

PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF

FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND

LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE ARCHITECT AND COR

PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.

ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING

OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES

SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR REPAINTING

WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE

TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF

OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF

PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY

PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS

(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,

UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS

MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL NOTES.

THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR

EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL

SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN

ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE

PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED

IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED

OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT

TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE

ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE- FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, CONTACT THE

ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,

BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED

AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF

PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS. PROPER

PRIMING MUST BE USED WITH SEALANTS.

2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS

ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, CONTACT THE

ARCHITECT.

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL BE

USED AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT

UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED EQUIPMENT

FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS

(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL

AND/OR ROOF.

5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

7. CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY MEMORANDUM 111-40, SUBJ: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017. SUBMIT TO COR

PRIOR TO START OF WORK.

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION AND PHASING NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/5

-1

-1

U p g ra d e I T

C lo s e ts

/5

-1

-1

V

A -A

B Q

B ld g

M

E P

.r v t

/2

/2

:5 :3

P

M

G-010

GENERAL PROJECT NOTES

TRIPLE C The A/E Group

2266 S. Dobson Rd, Suite. 200

Mesa, AZ 85202

307-460-2054

Mat Perkins

UPGRADE IT CLOSET AREAS

1501 San Pedro Dr. SE, Albuquerque, NM 87108

501-17-110

07/02/2019 M. PERKINS F. CLARK

ISSUED FOR

CONSTRUCTION

Revisions: Date: Expires 6.30.16Expires: 6/30/1821

7/2 /19

Issue Date

01/21/2020 Expires 6.30.16Expires: 6/30/1821

1/2 1/2

Expires 6.30.16Expires: 6/30/1821

6/2 4/2

06/24/2020

/2

4/

1/2 1/2

Expires 6.30.16Expires: 6/30/1821

6/2 4/2

Expires 6.30.16Expires: 6/30/1821

7/0 8/2

07/08/2020

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED

END OF EVERY SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

INDICATOR SHALL BE AT 0.01 OR

GREATER (VERIFY DAILY). IF NOT

VERIFY ALL OPENING SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUR

NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PROVIDE TEMPORARY

ENCLOSURE AT AREAS TO REMAIN

OPERATIONAL, SEE DETAIL

D7

G-011

TEMPORARY WALL

FLOOR LINE

CEILING SYSTEM

AS SCHEDULED

EXISTING

STRUCTURE

FIRE RATED PLASTIC

TO PREVENT DUST

INSTALL PRIOR TO

CONSTRUCTION

/1

F

IN

IS

H E

D F

L O

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

L O

O R

T O

F L O

O R

H E

IG

H

T RENOVATED

SPRINKLER SYSTEM

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-SHEETED

ADHESIVE FLOOR PADS

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

STICKY

MAT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/5

-1

-1

U p g ra d e I T

C lo s e ts

/5

-1

-1

V

A -A

B Q

B ld g

M

E P

.r v t

/2

/2

:5 :3

P

M

G-011

GENERAL INFECTION CONTROL NOTES AND

SYMBOLS

TRIPLE C The A/E Group

2266 S. Dobson Rd, Suite. 200

Mesa, AZ 85202

307-460-2054

Mat Perkins

UPGRADE IT CLOSET AREAS

1501 San Pedro Dr. SE, Albuquerque, NM 87108

501-17-110

07/02/2019 M. Perkins K. Luke

ISSUED FOR

CONSTRUCTION

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE ALBUQUERQUE VA MEDICAL CENTER

ICRA PLAN AND AS DIRECTED BY THE CONTRACTING OFFICER

REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH

OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH

THE COR. ALL INTERIOR DOORS THAT LEAD TO THE

CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS

THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM

CLEANER PRIOR TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION

AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION

AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND

KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM

PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO

MAINTAIN DUST PROTECTION AND NEGATIVE AIR PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,

WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR

CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED

AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA

SHALL BE CLEANED IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH

OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER

REMOVAL AND REMOVE ISOLATION OF VAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO HIGH

LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH,

HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING

MATRIX, TO FIND THE CLASS OF PRECAUTIONS (I, II, III

OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES

REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW N/A N/A LOW LOW N/A

STEP 5: MECHANICAL ROOM

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6: IDENTIFY ISSUES RELATED TO: VENTILATION,

PLUMBING, AND ELECTRICAL IN TERMS OF THE OCCURRENCE

OF PROBABLE OUTAGES.

STEP 7. IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8. CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS

THERE A RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY

(FOR EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE ISOLATED

FROM THE OCCUPIED AREAS DURING CONSTRUCTION AND

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS.

STEP 9. WORK HOURS: CAN OR WILL THE WORK BE DONE

DURING NON-PATIENT-CARE HOURS?

STEP 10. DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11. DO THE PLANS ALLOW FOR THE REQUIRED NUMBER

AND TYPE OF HAND-WASHING SINKS?

STEP 12. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS

PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE

(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES AND

AREA.)

STEP 13. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE PLANS RELATIVE TO CLEAN AND

SOILED UTILITY ROOMS?

STEP 14. PLAN TO DISCUSS THE FOLLOWING CONTAINMENT

ISSUES WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC

FLOW, HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

CLASS I - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUCT.

2. IMMEDIATELY REPLACE CEILING TILE IF DISPLACED.

CLASS I - PRECAUTIONS UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. REMOVE ALL VISIBLE DEBRIS WITH A WET TOWEL AND/OR

MOP.

3. ENVIRONMENTAL MANAGEMENT SERVICE TO WIPE WORK

SURFACES AND FLOORS WITH DISINFECTANT.

CLASS II - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTO ATMOSPHERE

2. WATER-MIST WORK SURFACES TO CONTROL DUST WITH

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. PLACE STICKY MAT AT ENTRANCE AND EXIT OF WORK

AREA.

5. REMOVE AND ISOLATE HVAC SYSTEM IN AREAS WHERE

WORK ID BEING PERFORMED.

6. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS II - PRECAUTIONS UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS

3. WET MOP AND/OR VACUUM WITH HEPA FILTER BEFORE

LEAVING WORK AREA.

4. RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. ENVIRONMENTAL MANAGEMENT SERVICE SHALL WIPE

WORK SURFACES AND FLOORS WITH DISINFECTANT.

CLASS III - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION OF DUCT

SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA

OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORK SITE AND READINGS

SHOULD BE DOCUMENTED AT LEAST DAILY.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS III - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND CONTROL

AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

CLASS IV - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. INSTALL AND MAINTAIN CONSTRUCTION CRITICAL BARRIERS

AND CEILING PROTECTION.

2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

3. SEAL DOORS OPENING TO ADJACENT AREAS WITH DUCT

TAPE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

5. BLOCK OFF AND SEAL HVAC REGISTERS, GRILLES AND ANY

OPENINGS IN DUCTWORK TO REMAIN

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

7. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORK SITE AND READINGS

SHOULD BE DOCUMENTED AT LEAST DAILY.

8. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

9. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

10. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

11. PROVIDE MONITORING AND CLEARANCE SAMPLES FOR

MOLD/ASBESTOS.

12. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO

PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED

USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS

THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.

13. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO

WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED

EACH TIME THE WORKER EXITS THE WORK AREAS.

CLASS IV - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND CONTROL

AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

6. WET MOP AREA WITH CLEANER/DISINFECTANT.

7. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

INFECTION CONTROL RISK

ASSESSMENT:

NTS

B7

INFECTION CONTROL MEASURES, TYPICAL CONSTRUCTION LAYOUT

NTS

D7

INFECTION CONTROL MEASURES, TEMPORARY WALL SECTION

1. PROJECT SPECIFIC PLANS ARE REQUIRED FOR THIS PROJECT. CONTRACTOR

TO SUBMIT INFECTIOUS CONTROL PLAN, SAFETY PLAN AND QUALITY CONTROL

PLAN PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL MEET AND

DISCUSS EXTENT OF ABATEMENT WITH ALL PARTIES TO COORDINATE WITH

THE FACILITY INFECTION CONTROL TO CONDUCT AN INFECTION CONTROL

RISK ASSESSMENT PRIOR TO BEGINNING ANY ABATEMENT, REMOVAL, AND / OR

REPAIRS PER MCM 111-40.

2. THE CONTRACTOR SHALL WRITE THE ASBESTOS HAZARD ABATEMENT

PLAN (AHAP) AND DEVELOP A SCHEDULE FOR APPROVAL BY THE VETERANS

PROFESSIONAL INDUSTRIAL HYGIENIST (VPIH).

3. THE CONTRACTOR SHALL PERFORM NEGATIVE EXPOSURE ASSESSMENTS

(NEA) AND MONITORING PER OSHA 1926.1101(f) FOE EACH REMOVAL WORK

OPERATION IN EACH WORK AREA.

4. THE CONTRACTOR SHALL MONITOR AND SAMPLE AIRBORNE ASBESTOS LEVEL

PER OSHA 1926.1101 UTILIZING THE POINT COUNT METHOD (PCM). SITE VISITS

AND INSPECTIONS OF CONTAINMENT BARRIERS, ANTE-ROOMS, HEPA

EQUIPMENT AND CONTROL EQUIPMENT SHALL BE PER THE ASBESTOS HAZARD

ABATEMENT PLAN.

5. THE CONTRACTOR SHALL PERFORM THE ABATEMENT CLOSEOUT AND

CERTIFICATION OF COMPLIANCE AND FINAL AIR CLEARANCE TESTING WITH

VETERANS PROFESIONAL INDUSTRIAL HYGIENIST AS PER SPECIFICATION

SECTION 02 82 11.

6. THE CONTRACTOR SHALL MAINTAIN SAFETY DATA SHEETS.

7. THE CONTRACTOR SHALL STORE, TRANSPORT, REMOVE ANY MATERIAL AND

WASTE, AND CLEAN WORK AREA UPON COMPLETION OF EACH ABATEMENT.

8. THE CONTRACTOR SHALL MAINTAIN INTEGRITY OF ALL FIRE OR SMOKE

RESISTANT PENETRATIONS THAT ARE AFFECTED BY WORK WITHIN AREA.

REMOVE AND REPLACE OR REPAIR ANY UNSATISFACTORY SEALS WITHIN

AREAS OF WORK. REPORT AREAS AND UNSATISFACTORY CONDITIONS THAT

ARE NOT IN SCOPE PROMPTLY TO COR.

9. SAFETY (ILSM) PLAN IS REQUIRED. ICRA REQUIREMENTS MUST BE INCLUDED.

PROVIDE SIGNAGE SUBMITTAL PRIOR TO THE START OF WORK.

10. CONTRACTOR TO ENSURE DOOR IS LOCKED AND CLOSED WHEN NOT IN USE.

CONTRACTOR SHALL KEEP ALL DOORS SECURE IN ALL AREAS AT ALL TIMES.

11. CONTRACTOR TO VERIFY QUANTITIES AND LOCATIONS OF EXISTING

DUCTWORK, PIPING, AND EQUIPMENT THAT REQUIRES ABATEMENT PRIOR TO

COMMENCEMENT OF WORK.

12. CONTRACTOR WILL BE HELD RESPONSIBLE IF ACM IS USED ON THIS PROJECT.

ALL WORK TO REMOVE AND REPLACE ACM WILL BE AT THEIR COST IF ACM IS

USED.

13. CONTRACTOR TO PREPARE AND MAINTAIN A WASTE MANIFEST PER VA ACM

ABATEMENT REQUIREMENTS IN THE SPECIFICATIONS.

GENERAL ABATEMENT NOTES

APPLICABLE STANDARDS:

1. DEPARTMENT OF VETERANS AFFAIRS (VA) EXPERIENCE

A. ASSESSING AND IMPLEMENTING INFECTION CONTROL RISK

ASSESSMENT (ICRA)

2. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) TRAINING

A. OSHA 30-HOUR FOR ALL EMPLOYEES

B. TITLE 29 CFR 1926.1101 - CONSTRUCTION STANDARD FOR

ASBESTOS

C. TITLE 29 CFR 1910.132 - PERSONAL PROTECTIVE EQUIPMENT

D. TITLE 29 CFR 1910.134 - RESPIRATORY PROTECTION

E. TITLE 29 CFR 1926 - CONSTRUCTION INDUSTRY STANDARDS

F. TITLE 29 CFR 1910.20 - ACCESS TO EMPLOYEE EXPOSURE AND

MEDICAL RECORDS

G. TITLE 29 CFR 1910.1200 - HAZARD COMMUNICATION

H. TITLE 29 CFR 1910.151 - MEDICAL AND FIRST AID

I. TITLE 29 CFR 1910.151 – ASBESTOS

3. ENVIRONMENTAL PROTECTION AGENCY (EPA) PERMITS, TRAINING, AND

CERTIFICATIONS