36C25819B0023-008.pdf
PDF 1 MB Posted
- Attached to
- 36C258-19-AP-0947 / 605-19-3-6012-0126 - 605-19-416 ICU 2SE Bridge Completion (VA-19-00054195)
- Solicitation number
- 36C25819B0023
About this file
36C25819B0023 S02 Bridge 7 Fire Damper Power.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819B0023-0003002.pdf | ||
| 36C25819B0023-0003003.pdf | ||
| 36C25819B0023-0003000.docx | DOCX document | |
| 36C25819B0023-0003001.pdf | ||
| 36C25819B0023-0002011.pdf | ||
| 36C25819B0023-0002012.pdf | ||
| 36C25819B0023-0002010.docx | DOCX document | |
| 36C25819B0023-0002013.pdf | ||
| 36C25819B0023-0001005.pdf | ||
| 36C25819B0023-0001004.pdf | ||
| 36C25819B0023-0001003.pdf | ||
| 36C25819B0023-0001002.pdf | ||
| 36C25819B0023-0001001.pdf | ||
| 36C25819B0023-0001000.docx | DOCX document | |
| 36C25819B0023-001.docx | DOCX document | |
| 36C25819B0023-011.pdf | ||
| 36C25819B0023-007.pdf | ||
| 36C25819B0023-006.pdf | ||
| 36C25819B0023-002.pdf | ||
| 36C25819B0023-003.pdf | ||
| 36C25819B0023-010.pdf | ||
| 36C25819B0023-004.pdf | ||
| 36C25819B0023-005.pdf | ||
| 36C25819B0023-009.pdf | ||
| 36C25819B0023-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R.F.I.
(REQUEST FOR INFORMATION)
Project #: 605-331 RFI #: C – 129
Project Name: Intensive Care Unit Consolidation Date Requested: 8/11/17
Solicitation No.: VA262-15-J-6178 Reference: Fire Damper Power
Drawing:
MH103
Specification Section:
DESCRIPTION OF PROBLEM OR INFORMATION REQUESTED
ISSUE:
Mechanical Drawing MH103 shows (2) new fire dampers located along Column Line 17.There does not appear to be any power specifications for these on the electrical drawings.
Please provide Power and fire Alarm requirements if needed.
PROPOSED SOLUTION:
OWNER RESPONSE
OWNER TRACKING No.: AMEND No.:
VA Project Engineer/Manager: Date:
Provide critical power 120 volt circuit to (6) fire dampers, see attached sketches for more requirement.
Provide and install in-duct smoke detector as per Mechanical Drawings.
John Encio-IMEG 08/24/2017
SB02/8A
EQUIP RM
GS
280.79 djcampbell Typewritten Text In Scope djcampbell Line djcampbell Line
ACC02/8
ACCESS
GS
76.81
ST02-8
STAIR
251.12
SB02/8A
EQUIP RM
GS
280.79
87 SF
193 SF