About this file

36C25819B0015 0005 S02_ATTACHMENT 15_ Dental Suite Info _Bldg 500 North Tower 691-19-111.pdf

View the file

Other files

File Type Posted
36C25819B0015-0005002.pdf PDF
36C25819B0015-0005004.pdf PDF
36C25819B0015-0005000.docx DOCX document
36C25819B0015-0005005.pdf PDF
36C25819B0015-0005001.pdf PDF
36C25819B0015-0004000.docx DOCX document
36C25819B0015-0003008.pdf PDF
36C25819B0015-0003007.pdf PDF
36C25819B0015-0003006.docx DOCX document
36C25819B0015-0002000.docx DOCX document
36C25819B0015-0001000.docx DOCX document
36C25819B0015-012.pdf PDF
36C25819B0015-005.pdf PDF
36C25819B0015-003.pdf PDF
36C25819B0015-001.docx DOCX document
36C25819B0015-004.pdf PDF
36C25819B0015-010.pdf PDF
36C25819B0015-006.pdf PDF
36C25819B0015-011.pdf PDF
36C25819B0015-008.pdf PDF
36C25819B0015-009.pdf PDF
36C25819B0015-002.pdf PDF
36C25819B0015-007.pdf PDF
36C25819B0015-000.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 15

Dental Suite Information

691-19-111

Part 1 of 1

9 pages

7 Aug 2019

Greater Los Angeles, California VA Health Care System (691)

North Tower Building 500

CONSTRUCTION

Reconstruction B500 Medical Services North Tower Pod-C Rev 01 with Dental Suites The scope of this project 691-19-111, Reconstruction B500 Medical Services North Tower Pod-C, is to addresses demolition with abatement, and restoration of destroyed patient care areas in Main Hospital, adjacent to Chase-15 from Sixth to Pipe-Basement floor. This is an urgent need since patients’ medical services on each floor have been interrupted and/or dispersed, postponed or referred to external service.

Restoration and Removal of hazardous waste clean-up must be completed at earliest time possible to eliminate subsequent contamination. Cleanup, demolition, abatement and removal shall strip floors bare and limited to areas identified by VA’s Industrial Hygienist (IH) & COR such as: Painted Wall system (Metal framed partitions, drywall, electrical, communication), T-bar ceiling system, lighting, doors, flooring, nurses station, bathroom & utility room, HVAC registers, duct & pipe’s insulations, pipes inside Chase-15 with isolation valves at each floor (Storm drain, sewer lines, cold & hot water lines, hot return line, natural Gas, medical air & vacuum lines) lockers, cabinets, furniture and, fixtures. The reconstruction shall replace & include all removed systems and elements for fully functional code compliant environment, equal or better prior the contamination.

Remove all contaminated materials within area from splashed and propagated sewage through I-Beams, columns, pipes and internal metal frames walls prior construction starts. Industrial Hygienist pointed out all areas contaminated that must be demolish stripped to expose concrete slab floor decks, affected structural steel to be striped of Monokote insulation, Hot water lines insulation, HVAC duct insulation and pipe lines inside chase 15. Decontamination, demolition, removal and disposition of waste shall be documented and meet all local City, County, State, DOT and Federal regulations.

Reconstruction shall rebuild all removed Wall system, ceiling system, lighting, doors, flooring, nurses station, bathroom & utility room, HVAC registers & duct insulations, pipes inside Chase-15 with isolation valves at each floor (Storm drain, sewer lines {Chemical resistant drain on ABS lines}, {cold & hot water lines copper Type-L, hot return line}, natural Gas with black pipe, {medical air & vacuum lines copper

Type-K}) lockers, cabinets, furniture, plumbing fixtures, and painting. All devices and components must be tested and in place ready to use such as: communication ports, fire alarm components, including metal structure’s fire proofing insulation, HVAC insulation and pipe stacks inside chase 15 must meet fire penetration codes and regulations. Rebuild nurse station with solid surface counter top and with storage lockable under-counter pull out drawer cabinets with built in letter size hanging rack. Provide and install patient’s lockers to replace and match existing quad-metal units 12” W x 72” H x24” D per compartments.

Provide and install two complete dental exam suite units to include Exam-chair with delivery system & instrumentation, Track mounted exam lights, Doctor’s and Assistant’s stool, assistant’s instrument’s cart.

Provide and install wall to wall, Base & Wall powder coated metal Cabinets on East wall and on West wall.

four walls base and wall cabinets in laboratory room.

All work is in and adjacent to Chase-15 by stairwell #3. See Drawing for work area. Everything within the demarked areas is included in the contract and all to be replaced new.

There is removal of flooring mastic adhesive with asbestos fiber and lead ceramic wall tile to be abated. Due to the sewer pipe spill the marked floor plan is the report and considered contaminated by sewage that must be replaced.

Fire proofing material (Monokote) shall be removed and replaced within the affected areas. All fire proofing shall be installed to a minimum of 2 hours rating or match existing if hire rating applies. Material for fire proofing must meet 2009 International Building Code (IBC) or later version of the IBC for building greater than 75ft in height.

Dental Suites details are herein included below. Dental lab to match existing arrangement with same type of cabinets as in dental suite.

DENTAL Suites (typical)

Provide and install wall to wall powder coated metal Cabinets for Base & Wall mounted on East wall on left side of entrance to exam room and chemical resistant counter top.

Group-A lay-out

Provide and install wall to wall powder coated metal Cabinets for Base & Wall mounted on West wall on right side of entrance to exam room and chemical resistant counter top.

Group-B lay-out