About this file

36C25819B0015 0005 S02_ATTACHMENT 13_ RFI Log REVISION 1 _ Bldg 500 North Tower 691-19-111.pdf

View the file

Other files

File Type Posted
36C25819B0015-0005002.pdf PDF
36C25819B0015-0005003.pdf PDF
36C25819B0015-0005004.pdf PDF
36C25819B0015-0005000.docx DOCX document
36C25819B0015-0005005.pdf PDF
36C25819B0015-0004000.docx DOCX document
36C25819B0015-0003008.pdf PDF
36C25819B0015-0003007.pdf PDF
36C25819B0015-0003006.docx DOCX document
36C25819B0015-0002000.docx DOCX document
36C25819B0015-0001000.docx DOCX document
36C25819B0015-012.pdf PDF
36C25819B0015-005.pdf PDF
36C25819B0015-003.pdf PDF
36C25819B0015-001.docx DOCX document
36C25819B0015-004.pdf PDF
36C25819B0015-010.pdf PDF
36C25819B0015-006.pdf PDF
36C25819B0015-011.pdf PDF
36C25819B0015-008.pdf PDF
36C25819B0015-009.pdf PDF
36C25819B0015-002.pdf PDF
36C25819B0015-007.pdf PDF
36C25819B0015-000.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13

ATTACHMENT 13

Request for Information (RFI) Log

REVISION 1 (Follow-on)

691-19-111

Part 1 of 1

21 pages

6 Aug 2019

Greater Los Angeles, California VA Health Care System (691)

North Tower Building 500

CONSTRUCTION

Request for Information (RFI) Log Building 500 North Tower (Revision 2)

Construction 30 July 2019

Greater Los Angeles, California VA Health Care System (691) West Los Angeles

RFI

Number

Date Question Answer

001 23 May 2019

Will the VA set up a conference call for contractors to participate in the public bid opening for those who emailed bids sent from outside of Phoenix?

The VA does not intend to host a teleconference as part of the public bid opening.

002 23 May 2019

Will a scanned executed copy of the bid bond be sufficient for electronic bid submission?

Electronic Copies of the Bonding will be acceptable for bid opening so long as all other elements of the executed bond are present. Physical copy of the actual bonding, with the raised seal shall be received mail from the apparent low offeror within 48 hours of the conclusion of the public opening, or will be ineligible for award.

003 2 May 2019 Will the Govt specify the meeting location for the site visit?

See Amendment 001

004 2 May 2019 Will the Govt supply formal Specifications for this project?

Yes

005 2 May 2019

The project documents posted on fbo.gov does not include specifications. Please provide.

Yes.

006 2 May 2019

Please verify date for job walk.

Block 10 on page 1 of the solicitation and page 60 of the solicitation lists job walk date

See Amendment 001

007 2 May 2019

Please clarify which is the correct Range of Magnitude for this project in accordance with VAAR 836.204

-Between $2,000,000 and $5,000,000 as outlined in SF-

008 2 May 2019 provide the offer due date and site visit date

See Amendment 001

009 6 May 2019

RFP Section B - Statement of Work, first paragraph state that “cleanup, demolition, and abatement and removal shall strip floors bare an limited to areas identified by VA’s Industrial Hygienist & COR”. Will the VA provide the actual VA’s Industrial Hygienist’s report so that the bidders might quantify the actual scope of the demolition and replacement of materials and assemblies for the impacted areas?

Clean up demolition to the boundaries.

All materials and fixtures to be new in areas marked.

See drawings: B500 North Tower Restoration Work 1.

010 6 May 2019

The IFB mentions abatement. Will the VA provide the current Hazardous Material Survey that includes all of the areas impacted in this project?

Please read Spec Section 02 82

13.19 Asbestos Floor Tile &

mastic Abatement.

011 6 May 2019

In reviewing the documents issued with the RFP, it appears as if the government has issued the original B500 construction as built drawings. It also appears as if the government issued a “summary” level scope of work. Is the government going to issue drawings that actually show where the work is to take place and the extent of the actual demolition and renovation?

Accurate floor plans of where all of the work is to take place would allow all of the bidders to actually bid the same scope of work, or is the government expecting each

All work is in and adjacent to Chase-15 by stairwell #3.

See Drawing for work area.

Everything within the demarked areas is included in the contract and all to be replaced new.

There is floor asbestos mastic adhesive and lead ceramic wall tile.

Due to the sewer pipe spill the marked floor plan is the report and considered contaminated by sewage that must be replaced.

contractor to do their own detailed site investigation and guess at what the government actually wants them to reconstruct?

012 6 May 2019

Are the as built drawings issued the RFP actually most current as built drawings reflecting any number of the changes that have occurred since the drawings were issued in 1974? As an example I was under the impression that the 5th floor north wing was the operating suite, yet the drawings issued show it to be that of an inpatient medical suite

All materials and fixtures to be new in areas marked. See drawings: B500 North Tower Restoration Work 1.

013 6 May 2019

Is this a design build? If it is to be a design build will the government specify how many design submissions, they will want to see and what the governments review time will be for each submission?

This is a Design Bid Build project.

Shop drawing submittal needed before start.

014 6 May 2019

One section of the statement of work says to “Provide and install two complete dental exam suite units to include Exam-chair with delivery system & instrumentation, Track mounted exam lights, Doctor’s and Assistant’s stool, assistant’s instrument’s cart.” On sheet 500-

1.18 I see what appears to be a lot

of different dental type rooms.

Can you tell us the room numbers that are to be renovated? Do you have a specification for the exam chairs with delivery system & instrumentation? Do you have a specification for the track mounted exam lights? Do you have a specification for the Dr’s and Assistant’s stool and instrument cart?

Room # 0029, 0030, 0031, Also affected Rooms # 0028 & 0032 due to separating wall removals.

015 6 May 2019

One section of the statement of work says to “Provide and install wall to wall, Base & Wall powder coated metal Cabinets on East wall and on West wall. four walls base and wall cabinets in laboratory room”. Can you tell us where this work is to be performed and provide a floor plan of this room that shows the cabinet layout?

Room # 0029, 0030, 0031. Layout to be included.

016 6 May 2019

One section of the statement of work says to “Rebuild nurse station with solid surface counter top and with storage lockable under-counter pull out drawer cabinets with built in letter size hanging rack” Can you tell us where this work is to be performed and provide a floor plan of this room that shows the nurse station layout?

Nurse Stations 3rd, 4th & Ground Floors. Rooms # 3041, 4062, 0029, 0030, 0031.

017 6 May 2019

Does the government have a list of rooms that have been impacted by the flood and are to be included in this contract?

Rooms marked in drawings: B500 North Tower Restoration Work 1

018 6 May 2019

Statement of Work, 3rd paragraph mentions the metal structure’s fireproofing insulation. For bidding purposes, what is the extent of fireproofing removal and replacement on the various floors? Although the VA provided some as-built drawings, the structural drawings depicting the steel requiring fireproofing were not provided. Will the VA provide the as-built structural drawings to assist the Contractors in determining the full scope of the fireproofing work?

Fire proofing shall be removed and replaced within the affected areas marked in drawings. All fire proofing shall be installed to match existing and consisting to a minimum of 2 hours rating.

019 14 May 2019 The Classification Code for this set aside for service Disabled Veteran Owner Small Business

Under amendment 001, states that a General Contractors License Must be submitted with the proposal. The Classification for the License is assumed to be A or B. Please confirm since both licenses are equivalent in building structures, A license does provide additional expertise in knowledge of Engineering Structures and Site.

(SDVOSB). Prime contractor is responsible for providing qualified personnel.

020 15 May 2019

Please provide a HAZMAT report.

There is not a comprehensive report. Please consider the areas contaminated that are under containment.

021 15 May 2019

Please provide specifications for materials, finishes, products, furniture, fixtures and equipment to be installed.

Contract is restoration.

Contractor to provide current like materials.

022 15 May 2019

Please provide construction drawings showing work to be performed.

Please see drawings: B500 North Tower Restoration Work 1

023 16 May 2019

During the site visit it was mentioned a few times that the medical gas system piping replacement was to be an option.

I do not see a price schedule for any options. Is there a bid option?

If yes please provide a price schedule listing the bid option and provide a detailed scope describing the option work.

No, please read Statement of Work B.1 Introduction.

024 16 May 2019

During the site walk the COR spoke about floor plans that had been highlighted showing the limits of construction. The RFP package downloaded from FBO did not include any floor plans that show the limits of construction. The only plans issued via FBO are the original scanned copies of the "as built" drawings of Building 500. Please

Please see drawings: B500 North Tower Restoration Work 1 issue the drawings that actually show the limits of construction and the work that we are to bid on.

025 16 May 2019

Par. B.1 says the contractor is to "eliminate subsequent contamination. Cleanup, demolition, abatement and removal shall strip floors bare and limited to areas identified by VA’s Industrial Hygienist (IH) & COR" this statement appears to indicate that there is a detailed 026 report that clearly identifies the actual scope of work. In reviewing the RFP we don't find anything that details the scope of work. Can the government please provide some documentation that tells us what to bid. We need a floor plan of each area that shows the work to be performed or a report that tells us what and how much needs to be replaced in each room on each floor. At minimum we need scalable floor plans that have the correct room numbers of the rooms we are to repair and renovate.

See Drawing for work area.

Everything within the demarked areas is included in the contract and all to be replaced new.

There is asbestos mastic adhesive and lead ceramic wall tile.

Due to the sewage spill the marked floor plan is the report and considered contaminated.

026 16 May 2019

Par. B.1 says the contractor is to "Provide and install patient’s lockers to replace existing Quad-metal units 12” W x 72” H x24” D per division". During the site walk we were not shown where these lockers go and the RFP does not include a plan that shows where they go and the RFP does not include a specification describing what/how the lockers are to be constructed. Can the VA provide a plan showing where the lockers are to be installed and provide a specification or a basis of design for the lockers?

Room 4061, 3040

027 16 May 2019

Par. B.5 says that the "Contractor shall preset an acceptable schedule and phased solution prior to start of work" in order to provide a schedule and to accurately bid the job, we need to know if we are going to be allowed to shut of all utilizes in the pipe basement, demo out all of the system and then work all of the systems from top to bottom or are we going to be limited to returning each utility to fully functioning after every shift, or are we going to have to run all new systems and only shut the systems down long enough to tie in each floor and then demo out all of the old systems? In other words we need to know how the VA expects the contractor to perform the work.

Some of the utility work will be scheduled off hours and weekends to minimize impact of patient’s services.

It is required to have systems up during Construction. It will require removal of un-used 8” Sprinkler Riser before installing other piping.

028 16 May 2019

During the site visit it was mentioned that we are not to replace the blue drain pipe, will the VA please confirm that we are to replace all utility piping in the utility chase, except for the blue chemical resistant drain pipe?

Yes, Confirmed the blue sewer pipe will remain in place.

029 16 May 2019

Is there a hazardous material survey for all of the areas we will be working in, assuming there is one, will the VA please provide it?

If one is not available are we to test all materials and any hazardous materials found will be treated as a change condition and handled via a modification?

It’s considered all hazardous materials because of the pipe break within the outlined areas Please see drawing There is asbestos mastic adhesive and lead ceramic wall tile.

030 16 May 2019

Considering there is not any actual plans, can the VA provide a list of rooms that we will be performing work within?

Yes, Please see drawings: B500

031 16 May 2019 What is the fire rating of the existing fire proofing that our new

It’s a Two (2) hour fire rating which the contractor is to match.

fire proofing is to meet/match. Is it 1 hour or 2 hour or something different?

(See Fire safety Study of Building 500)

032 16 May 2019

During the site visit we noticed that some rooms had all of the walls stripped down to the stud, and it appeared as if there were rough in for plumbing fixtures but the fixtures were missing. For plumbing situation where the fixtures have been removed or will need to be removed are we going to reinstall the existing or provide new fixtures? If we are to provide new will the VA please provide a specification of manufacture and model for each plumbing fixture that is to be installed?

drawings: B500 North Tower Restoration Work 1

033 16 May 2019

When you have a room that has ceramic tile on the walls left untouch and only one wall has been removed, are we to replace all of the walls tile or just the wall that has been removed? Will the VA please provide a plan or schedule that shows exactly what finishes will be installed in each room covered by the scope of work? We need to know by what is to be installed on the floors, walls and ceilings for each room we are to working? We need this because many rooms either have no finishes on them or no walls at all.

drawings: B500 North Tower Restoration Work 1

034 16 May 2019

Does the pipe chase as it passes from floor to floor have to be fire stopped? If yes what is the fire rating? Please provide specifications.

Fire rating is 2 hours See

Restoration Work 1

035 16 May 2019 All of the finishes had been removed from the fourth-floor dirty utility room, does that room

See “Statement of Work” B.1 Introduction. All materials and fixtures to be new in areas get painted walls or ceramic tile on the wall.

marked. See drawings: B500

036 16 May 2019

Are all of the lights in the affected area to be changed?

See ‘Statement of Work” All materials and fixtures to be new in areas marked. See drawings:

B500 North Tower Restoration Work 1

037 16 May 2019

Does the VA have a specific product they want used for the acoustical ceiling grid and tile?

Match existing areas.

038 16 May 2019

In room 3041 none of the finishes have been removed, are all of the finishes to be removed and replaced even though they are currently not removed or damaged?

039 16 May 2019

Please confirm that on the 5th floor and 2nd floor the work is limited to the removal and replacement of drywall and finishes needed to replace the utilities and the replacement of the utilities?

drawings: B500 North Tower Restoration Work 1

040 16 May 2019

Are we to keep all of the utilities on line and functioning and run the new pipes parallel to the existing system and then tie in each floor keeping all utilities live expect during the tie-in shutdown?

041 16 May 2019

If the medical gas pipe option is taken will the contractor be able to shut the system off in the basement and work it none stop to the 6the floor and do a single test of the entire system or are we expected to keep the existing systems live throughout the construction and tie in and test each floor independently?

No, can replace one or more gas pipes as long as Contractor maintain operations for Hospital use during Construction.

042 16 May 2019 Are all of the doors in the work area to be removed and replaced?

If yes please provide specifications for the door frames, doors and hardware?

Restoration Work 1”

043 16 May 2019

Can you provide a specification or manufacture and color for the wall paper that needs to be replaced on the first floor?

Match existing.

16 May 2019

Is the terrazzo flooring and/or Terrazzo cove base on the first floor to be replaced?

Must save the terrazzo side of flooring.

045 16 May 2019

What vendor does the VA prefer for their dental casework? If the VA does not have a preference can the VA provide either a basis of design or specification so that we know what to bid?

See attached layout

046 16 May 2019

Is the sterile system in the dental lab to be replaced or removed and reinstalled?

047 16 May 2019

Does the VA want the air and gas outlets in the dental lab replaced or reused?

drawings: B500 North Tower Restoration Work 1

048 16 May 2019

Can the government provide an actual as built of the existing dental clinic that shows the case work, lights, receptacles ect.

See attached layout

049 16 May 2019

Can the VA provide either a specification for the dental chair and overhead light or a manufacture and model they use as the bases of design.

See attached layout.

050 16 May 2019

In the pipe basement please confirm that we are to replace all of the risers all the way to the first valve and replace the valve or are we just replacing the pipe to the first valve?

Replace all the risers all the way to the first valve and replace the valve.

051 16 May 2019

Is the abandoned fire sprinkler pipe that is in the chase to be removed as part of this contract?

Remove piping per Statement of Work B.1 Introduction.

052 16 May 2019

Will the contractor be able to set up temporary barriers on each floor and work in all of the areas or are we going to be expected to do one floor and then move to the next floor?

contractor to set up one-hour temporary barriers on each floor to work in all of the areas.

053 16 May 2019

Are all of the HVAC registers to be replaced or cleaned and reinstalled?

drawings: B500 North Tower Restoration Work 1

054 17 May 2019

There are as-built drawings only in the solicitation documents.

Please issue demolition plans and installation plans. If there are not those plans, please mark the contract work area on the as-built drawings for quantity measurement and describe the contract work with finish schedule of each room with specifications for unit price estimate.

Demolition is for areas in marked

Restoration Work 1

055 17 May 2019

There are not plumbing drawing and specification in the solicitation documents.

Please furnish with plumbing drawings and specifications.

The work is replacement of existing piping.

056 17 May 2019

There is a bed wall behind Chase-15 as shown in the attached picture record.

Please verify the bed wall is to remain.

What is a bed wall?

Bed head to remain operational with new Med gas connections.

057 17 May 2019

There are storm drain pipe, sewer pipes, water supply pipes, and gas pipe in Chase- 15 including drain pipe from 6th floor dialysis unit as shown in the attached picture record.

All materials and fixtures to be new in areas marked. See drawings: B500 North Tower

New blue piping to remain.

Please verify all pipes in Chase-15 including the drain from the dialysis unit are to be replaced with new.

058 17 May 2019

Please furnish with the hazardous material survey report of the building.

There is floor asbestos mastic adhesive and lead ceramic wall tile.

Due to the sewer pipe spill the marked floor plan is the report

059 17 May 2019

Please furnish with the steel structure drawings of the building for Monokote insulation quantity measurement.

See drawings: B500 North Tower Restoration Work 1

060 17 May 2019

Please furnish with the lighting fixture schedule of each room.

Match existing layout.

061 17 May 2019 Please furnish with the door schedule of each room.

062 17 May 2019 Please furnish with the nurse station detail drawing.

063 17 May 2019

Please furnish with drawing, specification, and quantity of the patient’s locker.

new in areas marked. See

064 17 May 2019

Please furnish with specifications and quantity of the exam-chair with delivery system & instrumentation, the track mounted exam lights, the doctors’ and assistant’s tool, the assistant’s instrument’s cart those are described in the solicitation.

Dental suite layout.

065 17 May 2019

Please furnish with detail drawing and specification of “wall to wall, Base & Wall powder metal Cabinets on East wall and on West wall.

Four walls base and wall cabinets in laboratory room”

Room 4061, 3040 All materials and fixtures to be new in areas marked. See which is described in the solicitation.

Please verify the renovation of the 5th floor and 2nd floor except plumbing inside Chase- 15 is not included in this contract.

Yes, included in contract.

067 22 May 2019

The drawings provided in the RFP do not include an electrical floor plan for the ground floor, second floor, 3rd floor, 4th floor, please provide an accurate electrical floor plans and lighting plan for these floors.

Match existing. See drawings:

B500 North Tower Restoration Work 1.

068 22 May 2019

The electrical drawing provided for the 6th floor is labeled as “6th Fl South” , Please provide an electrical floor plan and lighting plan that shows an accurate representation of the 6th floor North wing.

No electrical work on 6th floor

069 22 May 2019

It was stated during the site visit that the 5th floor and 2nd floor had already been repaired. Can the government please provide and accurate floor plan depicting the limits of the work along with pictures of each of these areas, showing the wall, floor and ceiling finishes and specifications for the finishes in these areas. We were not allowed to visit these two floors during the site visit.

Only one pipe was replaced. All other need to be installed. See

070 22 May 2019

The mechanical drawings included in the RFP did not include a mechanical floor plan for the 2nd floor, please provide an accurate mechanical floor plan for the 2nd floor.

071 22 May 2019

During the Site Visit it was mentioned that the work for the 5th and 2nd floor was limited to removing only those finishes needed to replace the plumbing pipes in the pipe chase, will the VA confirm and/or clarify that this

Only one pipe was replaced. All other need to be installed. See is to mean that with the exception of any fire proofing or pipe insulation that the contractor removes to facilitate their work, there will NOT be any fire proofing or mechanical insulation repair or replacement required in the interstitial or floor space for these two floors?

072 22 May 2019

The drawings issued with the RFP do not include any plumbing drawings, will the VA please provide plumbing drawings of each floor that shows the plumbing fixtures in each of the rooms, pipe layout and a plan that shows all of the pipe that are in the pipe chase from the sub-basement to the 6th floor?

Only one pipe was replaced. All other need to be installed matching existing. See drawings:

073 22 May 2019 What type of water leaked Sewer.

074 22 May 2019 Is this a design/build project Shop drawing submittal needed before start.

075 22 May 2019 Does the VA have a phasing plan for completing this work? If so, please provide.

Contractor is responsible for creating CPM schedule for Project.

076 22 May 2019

Was a survey taken of the limits of water damage? If so please supply.

Inter markings of areas shown.

077 22 May 2019

SOW states “Cleanup, demolition, abatement and removal shall strip floor bare and limited to areas identified by VA’s IH and COR. Provide floor plans showing areas identified to serve as a limits of work area

Areas identified See drawings:

078 22 May 2019

The current walls are plaster. Can double sheets of 5/8” gypsum board be installed for the reconstruction?

Yes, fire rated.

079 22 May 2019 Verify the basement dental lab countertops are asbestos containing Transite.

Yes, it is asbestos containing Transite countertops

080 22 May 2019

Verify the basement dental lab flooring has asbestos containing mastic.

Needs to be abated and replaced.

081 22 May 2019 Provide plans, equipment list and specification for dental area and lab.

See attached layout.

082 22 May 2019

Provide a plumbing scope of work. Are all plumbing lines to be replaced in the sub-basement (not just the risers)?

Per Statement of work B.1 Introduction “The reconstruction shall replace & include all removed systems and elements for fully functional code compliant environment, equal or better prior the contamination.

083 22 May 2019

Do the ceramic tiles need to be removed from the fourth floor walls? If so, how are the walls to be finished?

Yes. Match existing tile color.

084 22 May 2019 Specify light fixtures and locations.

Yes. Match existing light fixtures.

085 22 May 2019

Third floor ceramic tile is lead glazed. Are these to be removed? If so, what is the replacement finish?

Yes. Match existing tile color.

086 22 May 2019 In locations where ductwork does not have insulation should the insulation be installed?

Yes.

087 22 May 2019

Indicate which pipes need to be replaced and their sizes.

This work was exposed during the site walk. Only one pipe was replaced. All other need to be replaced. See drawings: B500 North Tower Restoration Work 1.

088 22 May 2019

Provide material data for piping material.

This work was exposed during the site walk. Only one pipe was replaced. All other need to be replaced. See drawings: B500 North Tower Restoration Work 1.

089 22 May 2019

Is plumbing work limited to risers only or does this include laterals as well? Please indicate locations where each is to be replaced.

Yes, laterals within five feet of connections as well. drawings:

090 22 May 2019

Third floor pipe chase is congested with no room to place new riser while keeping the old one in place. Please advise.

Create a by-pass for work by removing unused pipes like 8” fire riser.

The following RFI responses are posted as attachement S02_ATTACHMENT_13 via Amedment 36C25819B0015-0004

091 1 July 2019

Amendment 0003 was issued effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions.

Question #36 regarding the Dental Lab sterile system was not answered. Will the VA provide a response to Question #36?

RFI #36 is about lighting. See answer to #36.

RFI #46 is dental lab and is “yes” as well.

092 1 July 2019

Amendment 0003 was issued effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Of the questions answered, a large number of the questions were answered with the phrase “See drawings: B500 North Tower Restoration Work 1”. We do not find drawings associated with this Amendment. Will the VA issue the drawings titled “B500 North Tower Restoration Work 1”?

All work is in and adjacent to Chase-15 by stairwell #3.

See Drawing for work area.

Everything within the demarked areas is included in the contract and all to be replaced new.

There is floor asbestos mastic adhesive and lead ceramic wall tile.

Due to the sewer pipe spill the marked floor plan is the report

093 1 July 2019 effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Questions #38 & #39 were answered with “see attached layout”. We did not find a layout attached to this amendment. Will the VA provide the “layout” related to Questions #38 & #39?

RFI #38 – Yes RFI #39 - B500 North Tower Restoration drawings with clouded areas of work is provided.

094 1 July 2019

Amendment 0003 was issued effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Question #10 was answered with see Spec Section 02 82 13.19 Asbestos Floor Tile & Mastic Abatement. We do not see Specifications provided for

Use caution. Original Mastic is known to contain Asbestos fiber.

Remove all contaminated area by licensed contractor.

this solicitation. Will the VA provide the Specifications required for this project?

095 1 July 2019 effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Question #11 response states that “We are in the process of identifying the Chase 13 area of work”. Will the VA provide this information with enough time to process before the bid date?

The area of Work for this project is Chase #15 from Sixth Floor to Pipe-Basement floor. Chase #13 was a typo. All work to be done on this Contract can be found in “Statement of Work”

096 1 July 2019

Amendment 0003 was issued effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Question #14 was only partially answered regarding the dental exam suites. The VA did not provide the requested information for the specific equipment required for these dental suites and the Contractors have insufficient information to provide a responsive quote for this work. Will the VA provide complete Specifications and the Basis of Design for all required equipment in these suites and sufficient time to distribute and obtain pricing for this equipment?

Contractor to replace all furnishings and fixtures.

All work is in and adjacent to Chase-15 by stairwell #3.

See Drawing for work area.

Everything within the demarked areas is included in the contract and all to be replaced new.

There is floor asbestos mastic adhesive and lead ceramic wall tile.

Due to the sewer pipe spill the marked floor plan is the report

097 1 July 2019 effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Question #26 regarding the lockers was only partially answered. The VA failed to provide a drawing / specification for the lockers to be

Please match existing lockers in Rooms 4061, 3040.

Lockers are 4 compartments each 12”W x 24”D x 72”H or equal.

provided. These lockers cannot be fairly priced by the Contractors without at least a Basis of Design. Will the VA provide a Specification / Basis of Design for the required lockers?

098 1 July 2019 effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Question #31 regarding the fireproofing was answered with “See the Fire Safety Study of B500”. We do not find that this study was provided. Will the VA provide the Fire Safety Study for Building 500?

drawings with clouded areas of work is provided. Fire rating is Two (2) hour rating.

099 1 July 2019

Amendment 0003 was issued effective June 26, 2019 and this question is directly related to follow-up on the VA responses provided for the RFI questions. Questions #45, 48, & 49 related to the Dental Casework were answered with “see attached layout”. We did not find a layout attached to this amendment. Will the VA provide the “layout” related to Questions #45, 48, & 49?

Providing information for Dental suites.

100 1 July 2019

Please provide the drawings referenced as B500 North Tower Restoration Work 1 referenced in the RFI responses.

Drawings provided.

101 1 July 2019

On FBO the only drawings posted are the 1972 “as built drawings”, there were never any construction drawings issued. The RFI response I think assumes that the drawings called “B500 North Tower Restoration Work 1” were issued with the original RFP, or issued with the amendment. It is

Only one (1) set of drawings are available (As-Builts). Drawings show work adjacent to Chase 15 work area.

next to impossible to bid this job without the drawings referenced in amendment 3 and per the amendment are called “B500 North Tower Restoration Work 1”.

8 July 2019

Need specifications. RFI 4 response says VA will provide. Were specs to be included in Amendment 3? Please provide specifications.

Specifications are provided.

102 8 July 2019

Need plans showing area/limits of work. RFI response says VA in process of identifying. RFI responses throughout Amendment 3 states “See drawings: B500 North Tower Restoration Work 1”. Please provide drawings.

work is provided.

103 8 July 2019

Not all Room numbers on as-builts match current room numbering or RFI responses. For example, Fourth Floor as-builts indicate work in Rooms N428, N431 & N442. RFI responses refer to 4061 and 4062. Please provide limits of work with current room numbers shown.

Numbers to match existing.

104 8 July 2019

Please provide structural steel drawings showing where Monokote is to be removed and replaced.

work is provided. Monokote to match existing for columns and bracing members.

105 8 July 2019

RFI 32 response does not provide enough information to determine what plumbing fixtures need to be replaced. Please provide list and/or floor plan showing fixtures and locations.

106 8 July 2019

Please provide detailed plumbing scope of work for the basement. During the walk it was mentioned to replace all the plumbing lines not just the

Replace risers and include branching out at each floor.

risers. Please clarify plumbing scope as I do not think ALL plumbing is basement is included in this scope of work.

107 8 July 2019

RFI responses 45, 46, 48 and 49 refer to an attached layout for the dental exam suite which was not included with Amendment 3. Please provide layout.

work is provided.

108 12 July 2019

Per index of Drawings on Sheet CS, the following Sheets are missing: ED-101, ED-101A, ED-

102A, ED-103A, ED-105A,ED-

105B, ED106A

Electrical work to replace lighting, receptacles, low voltage nurse calls, fire alarm and data communication. Match existing.

109 12 July 2019

The following Sheets that were included were not listed in the Index: E-109, ED-102, ED-103B, ED-105

Electrical work to replace lighting, receptacles, low voltage nurse calls, fire alarm and data communication. Match existing.

110 12 July 2019

Will the VA supply any Sheets deemed to be missing and provide a REVISED Index of Sheets so the Contractor can be assured the correct Drawings have been issued?

Yes.