36C25818B0335-0002000.docx
DOCX document 27 KB Posted
- Solicitation number
- 36C25818B0335
About this file
36C25818B0335 0002 36C25818B0335 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818B0335-0002004.pdf | ||
| 36C25818B0335-0002001.pdf | ||
| 36C25818B0335-0002002.pdf | ||
| 36C25818B0335-0002003.pdf | ||
| 36C25818B0335-0001001.pdf | ||
| 36C25818B0335-0001000.docx | DOCX document | |
| 36C25818B0335-001.docx | DOCX document | |
| 36C25818B0335-004.pdf | ||
| 36C25818B0335-005.pdf | ||
| 36C25818B0335-003.pdf | ||
| 36C25818B0335-002.pdf | ||
| 36C25818B0335-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 36C25818B0335 Amendment 0002 VA Project 691-18-111 Renovate OR Lights and Booms
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-21-2018 691-18-111 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818B0335
X X X August 27, 2018 at 2:00 p.m. local time.
Solicitation is amended as per following pages to provide schedule change, correction to design submissions, RFI answers, project data in the form of available drawings of the project space, and other items. An updated wage rate is provided. The bid due date has been extended to Monday, August 27, 2018, at 2:00 p.m. local time. - end-
Susan Pentz Contracting Officer
Solicitation is amended as follows:
Schedule changes –
1. Design submittal schedule – the first submittal due (35% i.e., Schematics/Part A) performance period is changed from 14 calendar days after notice to proceed (NTP) to 14 calendar days after equipment submittal approval.
2. The equipment submittal is due 14 calendar days after the NTP. VA review will take 14 calendar days.
3. Total contract period is changed to 178 calendars days comprised of the following:
a. Preconstruction period (126 calendar days), which includes equipment lead time and 63 calendar days for design per design submittal schedule in the scope of work. This anticipates time for issues that may come up during design that would necessitate additional VA design questions, review, and/or approval. Contractor will provide VA at least 30 calendar days notice prior to anticipated start of construction for VA approval. OR scheduling will be anticipating the 126 calendar day schedule and changes might not be approved. A construction schedule is also due at this time.
b. Construction period (52 calendar days), which includes 3 calendar days between phases for VA to use for project handling and room preparation.
Design submission changes – There are three design submissions as indicated in the design submittal schedule. Page 6 of the scope of work is changed from:
“Attend site walks necessary to provide 30%, 60%, 90%, and 100% drawing packages.”, and “Attend meetings for 30%, 60%, 90%, and 100% drawing reviews.”
to now read:
“Attend site walks necessary to provide 35%, 65%, and 100% drawing packages.”, and “Attend meetings for 35%, 65%, and 100% drawing reviews.”
Personal Protective Equipment – Contractor shall provide their own personal protective equipment (PPE) (e.g., coveralls) to access the OR area. The PPE shall comply with the VA standards for use inside the OR sterile area, including but not limited to “bunny suits”, shoe covers, and hair covers. If the contractor’s or their subcontractors’ employees exit the OR sterile areas, they shall have to put on fresh/new PPE before coming back into the OR sterile area.
Sterile areas – Contractor and subcontractors shall deliver all materials and tools, and perform any work that causes noise, smell, and/or vibration after-hours (usually from 7:00 p.m. until 5:00 a.m. on weekdays and all day on Saturday, Sunday, and federal holidays). All efforts shall be made to ensure that foot traffic through the area is minimized during the OR working hours. The contractor should plan so their impact on the OR areas are minimized. The sterile areas will be respected at all times and interference with patient care is not allowed. The VA reserves the right to suspend work in case of emergency and/or when contractor’s or subcontractors’ work impacts patient care operations.
Wage Rate – an updated wage rate is attached and replaces the one previously provided.
Attached for reference are as-built and life-safety interstitial drawings of the project area and RFI answers.
See attached document: RFI Answers.
See attached document: VALA B500_As-Built Drawings.
See attached document: VAWLA_Building 500 Interstitial Space_Life Safety.
See attached document: CA180033 08172018 CA33.