This document is a Question and Answer clarification issued by the Department of Veterans Affairs for Project 549A-SL-506, Replace Heat Exchanger Bonham. The clarifications address two original RFI questions and multiple follow-up questions regarding temporary hot water systems and work scheduling requirements for the heat exchanger replacement project across four buildings (Buildings 1, 2, 24, and 29).

Regarding temporary hot water systems, the VA confirms that temporary solutions are required for all four buildings during the replacement process. The VA will not provide temporary hot water systems; contractors must procure and install these independently. Mobile heat exchanger capacity requirements are 38 gallons per minute for Buildings 1, 2, and 29, and 75 gallons per minute for Building 24. Staging distances for mobile heat exchangers are approximately 30 feet of hose for Building 1 and approximately 100 feet for Buildings 2, 24, and 29. Contractors must provide temporary fencing around the staging areas to protect the temporary water heaters from vehicular and pedestrian traffic. Regarding tie-in requirements for connecting to building systems, the VA indicates that detailed information can be obtained through thorough attendance at a previously conducted site visit. For work scheduling, the VA clarifies that evening and weekend work should not be necessary with proper installation of temporary solutions, and work is expected to be performed during normal business hours as outlined in the original Statement of Work.

View the file

Other files

File Type Posted
36C25726R0058 0011.pdf PDF
36C25726R0058 0011_1.docx DOCX document
Answers to RFIs for 2nd Site Visit.pdf PDF
36C25726R0058 0010.pdf PDF
36C25726R0058 0010_1.docx DOCX document
36C25726R0058 0009_1.docx DOCX document
36C25726R0058 0009.pdf PDF
549A4-26-405 2nd site visit sign in sheet.pdf PDF
36C25726R0058 0008.pdf PDF
36C25726R0058 0008_1.docx DOCX document
36C25726R0058 0007_1.docx DOCX document
36C25726R0058 0007.pdf PDF
36C25726R0058 0006.pdf PDF
36C25726R0058 0006_1.docx DOCX document
RFI Heat Exchangers Combined and revised 4 20 26.pdf PDF
Statement of Work HEAT EXHANGERS BONHAM revised 4 20 26.pdf PDF
36C25726R0058 0005.pdf PDF
36C25726R0058 0005_1.docx DOCX document
36C25726R0058 0004.pdf PDF
36C25726R0058 0004_1.docx DOCX document
Bldg 1 Basement Heater location.pdf PDF
Tax Code.pdf PDF
Bldg 24 A Bldg 1st Floor.pdf PDF
Answers to RFI Heat Exchangers Bonham.pdf PDF
36C25726R0058 0003.pdf PDF
36C25726R0058 0003_1.docx DOCX document
Bldg 29 NHCU East Half.pdf PDF
Bldg 2 Basement.pdf PDF
36C25726R0058 0002.pdf PDF
36C25726R0058 Heat Exchanger Site Visit.pdf PDF
36C25726R0058 0001.pdf PDF
36C25726R0058 0001_1.docx DOCX document
PCRA ICRA Heater Exchange Bonham.pdf PDF
S02 36C25726R0058 Replace Heat Exchanger Bonham.pdf PDF
36C25726R0058_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarified Answers to RFI’s 13 and 36 Project 549A-SL-506

Replace Heat Exchanger Bonham

13. Will the Government require temporary hot water systems during the replacement process?

Answer: Yes, Required for all 4 buildings, 1, 2,24 and 29

Follow Up Questions

13a. The answer to this question is not clear on who is providing temporary hot water to each of the two buildings. Can the VA provide that?

Answer: VA will not provide temporary solutions. Thorough attendance at the previously provided site visit eliminates the exact question required to determine who would provide hot water.

13b. What are the requirements for a mobile heat exchanger above meeting building demand capacity?

Answer: 38gpm for buildings 1,2,29 and 75gpm for building 24.

13c. How far is the distance between where the mobile heat exchanger will be allowed to be staged and the building?

Answer: Building 1 approximately 30ft of hose from heat exchanger to connection area, approximately 100 ft of hosing for the remaining building, 2,24 and 29.

13d. What will the requirements be for tying into the building?

Answer: Thorough attendance at the previously provided site visit eliminates the exact question required to determine what the requirements would be for tying into the building.

13e. Will the staging area at each building need to have construction fencing to keep out vehicle or pedestrian traffic.

Answer: Temporary fencing will be required for the temporary water heaters.

Original Question

36. Will evening and/or weekend work be required for all phases?

Answer: Evening or weekend should not be necessary with the installation of temporary solutions.

Follow Up Question 36a. The original SOW calls out work to be performed during normal business hours. With the way the original question is asked and the answer that was received it is not clear on the amount of after-hours work that will have to be performed. Can the VA clarify their expectations?

Answer: See question 36 above