This is a Maintenance Inspection Report documenting the condition and status of medical gas and vacuum systems at a Veterans Affairs facility. The report provides a detailed assessment of the piped gas distribution infrastructure, including nitrogen, oxygen, nitrous oxide, and vacuum systems, along with identification of any deficiencies or non-compliance issues requiring corrective action. The inspection covers system components such as pressure regulators, alarm systems, isolation valves, and terminal units, with documentation of current operational status and safety certifications.

The report serves as a baseline assessment tool for the Medical Gas System Inspection and Maintenance Services contract (Solicitation 36C25726Q0888) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The findings documented in this inspection report inform the scope of work for contractors bidding on annual inspection, testing, and preventative maintenance services, as well as out-of-cycle inspection and testing requirements. Contractors will use this report to understand existing system conditions, identify deficiencies requiring correction, and develop comprehensive maintenance programs to ensure continued compliance and operational safety of the medical gas infrastructure.

View the file

Other files

File Type Posted
Site Visit Sign In Sheet.pdf PDF
S02 36C25726Q0888 0002.pdf PDF
S02 36C25726Q0888 0001.pdf PDF
S02 36C25726Q0888.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project ID(s): Annual Medical Gas Inspection

Project Date(s): 10/13/2025-10/17/2025

Evergreen Medical Services

Corporate Headquarters

8047 Castleton Road

Indianapolis, IN 46250

800-727-8321

MEDICAL GAS SYSTEMS MAINTENANCE INSPECTION

Project ID(s): Annual Medical Gas Inspection

Project Date(s): 10/13/2025-10/17/2025

Tested to NFPA 99:

ASSE Credential #:

Technician 5: ASSE Credential #:

Report Authored By:

Technician 2:

Technician 3:

Technician 4:

Technician 6:

david.murphy@va.gov

Dallas, TX

Project Contact:

David Murphy

Engineering

469.773.9197

Project Site:

123546

123456

VAMC Dallas www.EvergreenMedical.com

4500 S. Lancaster Rd.

12544604

12615654

123456789

11225

Billy Sigler ASSE Credential #:

Brandon Scott ASSE Credential #:

ASSE Credential #:

ASSE Credential #:

Per NFPA 99, the maintenance, inspection and testing operations of medical gas systems apply to all facilities—new and existing—with Category 1-3 Medical Gas, Vacuum, WAGD, and Medical Support Gas systems.

MEDICAL GAS SYSTEMS MAINTENANCE INSPECTION

PURPOSE

The inspection and testing documented in this report is designed around satisfying the medical gas systems maintenance program requirements laid out in NFPA 99 section 5.1.14. The purpose driving these maintenance program requirements is to ensure that medical gas system components are compliant with applicable NFPA 99 codes and standards, remain in good repair, and are operating within manufacturer specifications or recommendations.

SCOPE AND APPLICATION

TESTING & INSPECTION PROCEDURES

EMS has designed its testing & inspection scope and procedure around applicable NFPA 99 codes and pertinent inspection and accreditation requirements, and manufacturer recommendations following industry best practices. However, your facility's risk assessment committee has the ultimate responsibility in deciding the scope and frequency of scheduled inspections for medical gas components and the associated procedures. These inspections are to be developed with consideration of the original equipment manufacturer recommendations and other recommendations as required by the authority having jurisdiction.

The testing & inspection procedures represented in this report are as follows unless otherwise directed and document by the facility's risk assessment team:

MASTER ALARMS :

Master alarm panel location is recorded along with manufacturer and model of alarm and location of initiating device. Master alarm panels are tested for proper audible and visual alarm activation & deactivation, each signal is inspected for proper labeling and wiring is inspected for independence to initiating device.

All master alarm signals* are tested by simulating each alarm condition and/or actuating the signal at the initiating device wherever possible.

If it is not possible to simulate an alarm condition or actuate the signal by changing system conditions then the alarm's wiring will be tested for continuity from the initiating to the master alarm panels.

* Cryogenic liquid central supply system master alarm signals that terminate within the supplier-owned equipment are not tested per the EMS maintenance inspection

SOP as such signals are required to be tested by the supplier/equipment owner annually and EMS views this testing as sufficient in satisfying the NFPA 99 inspection requirement. EMS can test these signals per request, however the facility will have to direct the method used to perform this testing.

Report Section: SCOPE & PROCEDURES

Page: 2 of 263

Filename: R,SYS,2025,Dallas VA

Report Version: 3.7,5K

MEDICAL GAS SYSTEMS MAINTENANCE INSPECTION

OUTLETS & INLETS :

Outlet or inlet location, manufacturer, model, position and labeling is inspected and recorded. Outlets/inlets are tested for proper connect & release, leaks and general condition.

One outlet/inlet per zone is tested for static pressure and compared with zone valve gauge reading and/or area alarm pressure reading.

All outlets/inlets are tested for dynamic pressure/operational flow pressure drop.

All positive pressure medical gases are tested for oxygen concentration as a way of determining if existing cross-connections between two medical gases exist.

AREA ALARMS :

Area alarm panel location and area monitored is recorded along with manufacturer and model of alarm. Area alarm panels are tested for proper audible and visual alarm activation and deactivation through use of the alarm "test" function. Condition of area alarm and components are inspected.

System gas, high & low alarm setpoints are recorded and pressure reading is recorded and tested for accuracy.

Area monitored labeling and transducer location can only be verified by tracing piping and/or altering zone pressure. Actual alarm function under alarm conditions

(high or low pressure) can only be verified by altering zone pressure. These tests can be performed by request but are not included in EMS's maintenance inspection

SOP.

VALVES :

Valve location and labeling (including area(s) served, system gas and other required verbiage), manufacturer, valve type and pressure reading are inspected and recorded. Gauge pressure is recorded and tested for accuracy. Condition of valve assembly and enclosure are inspected and valves are checked for leaks.

Area served labeling can only be verified by tracing piping and/or altering zone pressure. This test can be performed by request but is not included in EMS's maintenance inspection SOP.

Report Section: SCOPE & PROCEDURES

Page: 3 of 263

MEDICAL GAS SYSTEMS MAINTENANCE INSPECTION

1)

2)

3)

GAS CONTAMINANTS :

Particulate Contaminants - A representative sampling of each gas system pipeline is tested for particulate contaminants using a 0.45 micron filter membrane connected to an outlet of each gas. Results of this test are then recorded.

Dew Point - A representative sampling of medical air and instrument air pipeline is tested for dew point using a portable dew point monitor connected to an outlet of each gas. Results of this test are then recorded.

Odor - All positive pressure outlets are tested for objectionable or pronounced odor and the results are then recorded.

Gaseous Contaminants - Testing each gas system pipeline and source for total nonmethane hydrocarbons and halogenated hydrocarbons can be performed by request but is not included in EMS's maintenance inspection SOP.

EMS service technicians are qualified to perform medical gas systems inspections and maintenance to one or more of the following qualification requirements per NFPA

99 5.1.14:

Documented training by which such persons are qualified to work with specific equipment as installed in that facility.

Credentialing to the requirements of ASSE 6040, Professional Qualification Standard for Medical Gas Maintenance Personnel.

Credentialing to the requirements of ASSE 6030, Professional Qualification Standard for Medical Gas Systems Verifiers.

QUALIFICATIONS

SOURCE EQUIPMENT :

All source systems' manufacturer, model number and specifications are recorded. Proper functioning of each system is observed and recorded. Each source type is inspected based on the associated inspection checklist visible on the page(s) of this report specific to that source system.

Report Section: SCOPE & PROCEDURES

Page: 4 of 263

TABLE OF CONTENTS

■ Summary of Findings

■ Master Alarms

■ Area Alarms

■ Valves

■ Outlets & Inlets

■ Contaminants

■ Source Equipment

■ Annex

Evergreen Medical Services has evaluated the medical piping systems indicated in this report in accordance with applicable NFPA 99 Health Care Facilities Code and ASSE 6000 Standards. These systems have been found to be within applicable guidelines except as noted within this report. Any deficiencies cited are based on the most applicable edition of NFPA 99. See coversheet for relevent NFPA 99 edition.

Per NFPA 99 an existing system that is not in strict compliance with the applicable codes may continue to be used as long as it is not a distinct hazard to safety. Fire/explosion hazards, labeling, manifold enclosures, medical air usage, & maintenance codes apply to new & existing facilities.

The information recorded in this report represents the state of the medical gas systems for the indicated inspection date(s) only. Any action taken in response to recommendations included in this report should be recorded on the appropriate pages. This report should not be copied unless in its entirety.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Master Alarm

Signals (133)

Area Alarm Signals (152)

Valves (473) Outlets & Inlets (4381)

Contaminant Test Sites

(33)

Source Systems (19)

Deficient 0 3 7 12 9 2

Compliant 133 149 466 4369 24 17

133 149 466 4369

3 7 12

MEDICAL GAS SYSTEMS HEALTH BY COMPONENT

93.1%

OVERALL MEDICAL

GAS SYSTEMS HEALTH

Report Section: SYSTEMS OVERVIEW

Page: 5 of 263

MASTER ALARMS

No deficiencies at time of test

No corrective action reported

AREA ALARMS

DEFICIENCY DETAIL - AREA ALARMS ALARM PANEL LOCATION(S) QTY

Power failure Bldg 74 O/S 1D-117, BLDG 2 OPP 2C-305C 4

CORRECTIVE ACTION DETAIL - AREA ALARMS ALARM PANEL LOCATION(S) QTY

No corrective action reported

SUMMARY OF DEFICIENCIES

Individual deficiencies and corrective action notes can be found in the component sections ( 'Master Alarms', 'Area Alarms', 'Valves', 'Outlets & Inlets', 'Contaminants', 'Sources & Pipeline' ). This summary provides an overview of deficiency or corrective action type, location and quantity. For discussion regarding what constitutes a deficiency, please note the "Scope & Procedures" section of this report. For findings that have not been marked as deficient but instead EMS has provided a recommendation, please note the "Annex" section of this report.

Report Section: SUMMARY OF FINDINGS

Page: 6 of 263

SUMMARY OF DEFICIENCIES

Individual deficiencies and corrective action notes can be found in the component sections ( 'Master Alarms', 'Area Alarms', 'Valves', 'Outlets & Inlets', 'Contaminants', 'Sources & Pipeline' ). This summary provides an overview of deficiency or corrective action type, location and quantity. For discussion regarding what constitutes a deficiency, please note the "Scope & Procedures" section of this report. For findings that have not been marked as deficient but instead EMS has provided a recommendation, please note the "Annex" section of this report.

VALVES

DEFICIENCY DETAIL - VALVES VALVE LOCATION(S) QTY

Gauge - inaccurate pressure reading BLDG 2 O/S 6C-211, BLDG 2 BC Radiation Oncology, BLDG

2J OPP 1A-102, BLDG 2J O/S Anesthesia Wrkrm, BLDG 2J

O/S OR 10, BLDG 2J O/S 5B 663

Gauge - incorrect scale range BLDG 2J O/S ER Exam 11 1

CORRECTIVE ACTION DETAIL - VALVES VALVE LOCATION(S) QTY

No corrective action reported

OUTLET & INLETS

Leaking inner check 5th Floor 2J Bldg SICU H, 5th Floor 2J Bldg SICU J 2

Leaking outer check BLDG 2 2nd Floor C 2C-305 1

No deficiencies at time of test

No corrective action reported

Report Section: SUMMARY OF FINDINGS

Page: 7 of 263

SUMMARY OF DEFICIENCIES

Individual deficiencies and corrective action notes can be found in the component sections ( 'Master Alarms', 'Area Alarms', 'Valves', 'Outlets & Inlets', 'Contaminants', 'Sources & Pipeline' ). This summary provides an overview of deficiency or corrective action type, location and quantity. For discussion regarding what constitutes a deficiency, please note the "Scope & Procedures" section of this report. For findings that have not been marked as deficient but instead EMS has provided a recommendation, please note the "Annex" section of this report.

GAS CONTAMINANTS

DEFICIENCY DETAIL - GAS CONTAMINANTS OUTLET/TEST PORT LOCATION(S) QTY

High Dew Point Bldg 2 4C-316, Bldg 2J 5B-623, Bldg 2J CCU 9, Bldg 2J EP

Lab 5B 647, Bldg 2J 1A 122, Bldg 2J CLC B-124, Bldg 2J OR

5, Bldg 2J OR 12

Water in Piping Bldg 74 1C124 1

CORRECTIVE ACTION DETAIL - GAS CONTAMINANTS OUTLET/TEST PORT LOCATION(S) QTY

No corrective action reported

SOURCE EQUIPMENT

AIR COMPRESSOR SYSTEMS

DEFICIENCY DETAIL - AIR COMPRESSOR SYSTEMS SOURCE EQUIPMENT TYPE / AREA(S) SERVED

Dewpoint above 32 degrees, Recommend dryer service Medical Air Compressor System serving BLDG 2J North side

Dewpoint above 32 degress, Recommend dryer service Medical Air Compressor System serving BLDG 74 S C I

CORRECTIVE ACTION DETAIL - AIR COMPRESSOR SYSTEMS SOURCE EQUIPMENT TYPE / AREA(S) SERVED

No corrective action reported

Report Section: SUMMARY OF FINDINGS

Page: 8 of 263

MASTER ALARM SIGNALS

BY SYSTEM GAS:

16 52 10 10 10 26 0 0 9

133TOTAL MASTER

ALARM SIGNALS

TOTAL MASTER ALARM PANELS:

MANUFACTURER MODEL MASTER ALARM PANEL DESCRIPTION

O

M A

N

O

N

C O

V A

C

W A

G D

IA

O th e r

Amico A2M Gray Cover with Red LED Indicators 14 52 10 10 10 26 9

Beacon 0321-77 Black-analog gauges-"Line Pressure Alarm" 2

133TOTAL MASTER

ALARM SIGNALS

MASTER ALARMS BREAKDOWN (*EACH MASTER ALARM SIGNAL COUNTED AS SEPARATE ALARM BY SYSTEM GAS BELOW)

Report Section: MASTER ALARM INVENTORY

Page: 9 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

1 Building 60 Entrance O2 Beacon 0321-77 High Line

Pressure Building 60 60 psi PASS

2 Building 60 Entrance O2 Beacon 0321-77 Low Line

Pressure Building 60 40 psi PASS

Energy Center

(Panel 1) O2 Amico A2M Liquid Level Low

O2 Bulk

Enclosure 75 inH2O PASS

Energy Center

(Panel 1) O2 Amico A2M

Secondary

Liquid Supply in

Use

O2 Bulk

Enclosure

80 PSI PASS

Energy Center

(Panel 1) O2 Amico A2M

Emergency

Reserve Low

O2 Bulk

Enclosure 30 inH2O PASS

Energy Center

(Panel 1) O2 Amico A2M

Reserve

Pressure Low

O2 Bulk

Enclosure

95 PSI PASS

Energy Center

(Panel 1) O2 Amico A2M

Line Pressure

Low In Hospital 40 PSI PASS

Energy Center

(Panel 1) O2 Amico A2M

Line Pressure

High In Hospital 60 PSI PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 2 Vac 1

Lag Pump In

Use

At Pump 17 inHg PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 2 Vac 2

Lag Pump In

Use

At Pump 15 inHg PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 2

Low Line

Pressure

Above Pump 12 inHg PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 2 MAC-1

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 74 SCI

High Line

Pressure

At Compressor 60 PSI PASS

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Report Section: MASTER ALARMS

Page: 10 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Energy Center

(Panel 1) MA Amico A2M

Bldg 74 SCI

Low Line

Pressure

At Compressor 40 PSI PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 74 SCI

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 74 SCI

Dew Point High At Compressor 35 ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 74 SCI

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 74 SCI

Low Line

Pressure

Above Pump 12 inHg PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 74 SCI

Lag Pump In

Use

At Pump 18 inHg PASS

Energy Center

(Panel 1) Vac Amico A2M

Bldg 74 SCI

Backup Lag

Pump In Use

At Pump 18 inHg PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 2 MAC-2

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 2 Line

Pressure

Abnormal

Above

Compressor

PSI PASS

Energy Center

(Panel 1) VAC Amico A2M

Bldg 60

Low Line

Pressure

At Pump 12 inHg PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 60

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 60

High Dew Point At Compressor 35 ºF PASS

Report Section: MASTER ALARMS

Page: 11 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Energy Center

(Panel 1) MA Amico A2M

Bldg 60

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 60

High Line

Pressure

Above

Compressor

60 PSI PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 60

Low Line

Pressure

Above

Compressor

40 PSI PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 2

High Dew Point At Compressor 35 ºF PASS

Energy Center

(Panel 1) MA Amico A2M

Bldg 2

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Line Pressure

High

Above

Compressor

60 PSI PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Line Pressure

Low

Above

Compressor

40 PSI PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

High Dew Point At Compressor 35 PSI PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Compressor

Malfuction

At Compressor ºF PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Line Pressure

High

Above

Compressor

60 PSI PASS

Report Section: MASTER ALARMS

Page: 12 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Line Pressure

Low

Above

Compressor

40 PSI PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

High Dewpoint At Compressor 35 ºF PASS

Energy Center

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 2) VAC Amico A2M

Bldg J2 MVP-1

Vac Malfuction At Pump ºF PASS

Energy Center

(Panel 2) VAC Amico A2M

Bldg J2 MVP-1

Vac Level Low Above Pump 12 inHg PASS

Energy Center

(Panel 2) VAC Amico A2M

Bldg J2 MVP-2

Vac Malfuction At Pump ºF PASS

Energy Center

(Panel 2) VAC Amico A2M

Bldg J2 MVP-2

Vac Level Low Above Pump 12 inHg PASS

Energy Center

(Panel 2) LA Amico A2M

Bldg J2 Lab Air

Lag

Compressor In

Use

At Compressor 80 PSI PASS

Energy Center

(Panel 2) LA Amico A2M

Bldg J2 Lab Air

Line Pressure

High

Above

Compressor

PSI PASS

Energy Center

(Panel 2) LA Amico A2M

Bldg J2 Lab Air

High Dewpoint At Compressor ºF PASS

Energy Center

(Panel 2) LA Amico A2M

Bldg J2 Lab Air

High CO Level At Compressor 10 PPM PASS

Energy Center

(Panel 2) VAC Amico A2M

Bldg 2J Lab Vac

Pressure Low

Above

Compressor

12 PSI PASS

Energy Center

(Panel 2) N2 Amico A2M

N2 Reserve In

Use At Manifold 270 PSI PASS

Energy Center

(Panel 2) N2 Amico A2M

N2 High Line

Pressure Above Maniflod 190 PSI PASS

Report Section: MASTER ALARMS

Page: 13 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Energy Center

(Panel 2) N2 Amico A2M

N2 Low Line

Pressure Above Maniflod 140 PSI PASS

Energy Center

(Panel 2) N2 Amico A2M

N2 High

Pressure

Reserve Low

Above Maniflod 250 PSI PASS

Energy Center

(Panel 2) N2 Amico A2M

N2 High

Pressure

Reserve In Use

Above Maniflod 250 PSI PASS

Energy Center

(Panel 2) N2O Amico A2M Reserve In Use At Manifold 110 PSI PASS

Energy Center

(Panel 2) N2O Amico A2M

Line Pressure

High Above Maniflod 60 PSI PASS

Energy Center

(Panel 2) N2O Amico A2M

Line Pressure

Low Above Maniflod 40 PSI PASS

Energy Center

(Panel 2) N2O Amico A2M

N2O High

Pressure

Reserve Low

Above Maniflod 90 PSI PASS

Energy Center

(Panel 2) N2O Amico A2M

N2O High

Pressure

Reserve In Use

Above Maniflod 90 PSI PASS

Energy Center

(Panel 2) CO2 Amico A2M Reserve In Use At Manifold 110 PSI PASS

Energy Center

(Panel 2) CO2 Amico A2M

Line Pressure

High Above Maniflod 60 PSI PASS

Energy Center

(Panel 2) CO2 Amico A2M

Line Pressure

Low Above Maniflod 40 PSI PASS

Energy Center

(Panel 2) CO2 Amico A2M

CO2 High

Pressure

Reserve Low

Above Maniflod 90 PSI PASS

Energy Center

(Panel 2) CO2 Amico A2M

CO2 High

Pressure

Reserve In Use

Above Maniflod 90 PSI PASS

Report Section: MASTER ALARMS

Page: 14 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 60

Line Pressure

High

Above

Compressor

60 PSI PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 60

Line Pressure

Low

Above

Compressor

40 PSI PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 60

Compressor

Malfuntion

At Compressor ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 60

High Dewpoint At Compressor 35 ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 60

High CO Level At Compressor 10 PPM PASS

Emergency Admin

(Panel 1) VAC Amico A2M

Bldg 60

Pump

Malfuction

At Pump ºF PASS

Emergency Admin

(Panel 1) VAC Amico A2M

Bldg 60

Low Line

Pressure

Above Pump 12 inHg PASS

Emergency Admin

(Panel 1) VAC Amico A2M

Bldg 74 SCI

Lag Pump In

Use

At Pump 17 inHg PASS

Emergency Admin

(Panel 1) VAC Amico A2M

Bldg 74 SCI

Low Line

Pressure

Above Pump 12 inHg PASS

Emergency Admin

(Panel 1) VAC Amico A2M

Bldg 74 SCI

Backup Lag In

Use

At Pump inHg PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 74 SCI

Line Pressure

High

Above

Compressor

60 PSI PASS

Report Section: MASTER ALARMS

Page: 15 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 74 SCI

Line Pressure

Low

Above

Compressor

40 PSI PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 74 SCI

Compressor

Malfunction

Above

Compressor

ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 74 SCI

High Dewpoint At Compressor 35 ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 74 SCI

High CO Level At Compressor 10 PPM PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 2 MAC-1

Compressor

Malfuction

At Compressor ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 2 MAC-2

Compressor

Malfuction

At Compressor ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 2

Line Pressure

Abnormal

Above

Compressor

PSI PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 2

High Dewpoint At Compressor 35 ºF PASS

Emergency Admin

(Panel 1) MA Amico A2M

Bldg 2

High CO Level At Compressor 10 PPM PASS

Emergency Admin

(Panel 1) O2 Amico A2M

Reserve Supply

In Use

O2 Bulk

Enclosure 80 inH2O PASS

Emergency Admin

(Panel 1) O2 Amico A2M

Reserve

Pressure Low

O2 Bulk

Enclosure

95 PSI PASS

Emergency Admin

(Panel 1) O2 Amico A2M

Reserve Liquid

Level Low

O2 Bulk

Enclosure 30 inH2O PASS

Emergency Admin

(Panel 1) O2 Amico A2M

Main Liquid

Level Low

O2 Bulk

Enclosure 75 inH2O PASS

Emergency Admin

(Panel 1) O2 Amico A2M

Line Pressure

High In Hospital 60 PSI PASS

Report Section: MASTER ALARMS

Page: 16 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency Admin

(Panel 1) O2 Amico A2M

Line Pressure

Low In Hospital 40 PSI PASS

Emergency Admin

(Panel 1) VAC Amico A2M

BLDG 2 MVP-1

Lag Pump In

Use

At Pump 17 inHg PASS

Emergency Admin

(Panel 1) VAC Amico A2M

BLDG 2 MVP-2

Lag Pump In

Use

At Pump 15 inHg PASS

Emergency Admin

(Panel 1) VAC Amico A2M

BLDG 2

Low Line

Pressure

Above Pump 12 inHg PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Compressor

Malfuction

At Compressure ºF PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Line Pressure

High

Above

Compressor

60 PSI PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

Line Pressure

Low

Above

Compressor

40 PSI PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

High Dewpoint At Compressure 35 ºF PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-1

High CO Level At Compressure 10 PPM PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Compressor

Malfuction

At Compressure ºF PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Line Pressure

High

Above

Compressor

60 PSI PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

Line Pressure

Low

Above

Compressor

40 PSI PASS

Report Section: MASTER ALARMS

Page: 17 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

High Dewpoint At Compressure 35 ºF PASS

Emergency Admin

(Panel 2) MA Amico A2M

Bldg J2 MAC-2

High CO Level At Compressure 10 PPM PASS

Emergency Admin

(Panel 2) VAC Amico A2M

Bldg J2 MVP-1

Malfuction At Pump ºF PASS

Emergency Admin

(Panel 2) VAC Amico A2M

Bldg J2 MVP-1

Low Line

Pressure

Above Pump 12 inHg PASS

Emergency Admin

(Panel 2) VAC Amico A2M

Bldg J2 MVP-2

Malfuction At Pump ºF PASS

Emergency Admin

(Panel 2) VAC Amico A2M

Bldg J2 MVP-2

Low Line

Pressure

Above Pump 12 inHg PASS

Emergency Admin

(Panel 2) LA Amico A2M

BLDG J2

Lag In Use At Compressor PSI PASS

Emergency Admin

(Panel 2) LA Amico A2M

Bldg J2

Line Pressure

High

Above

Compressor

PSI PASS

Emergency Admin

(Panel 2) LA Amico A2M

Bldg J2

Line Pressure

Low

Above

Compressor

PSI PASS

Emergency Admin

(Panel 2) LA Amico A2M

Bldg J2

High Dewpoint At Compressor ºF PASS

Emergency Admin

(Panel 2) LA Amico A2M

Bldg J2

High High CO

Level

At Compressor PPM PASS

Emergency Admin

(Panel 2) Vac Amico A2M

Bldg J2

Line Pressure

Low

Above Pump 12 inHg PASS

Emergency Admin

(Panel 2) N2 Amico A2M Reserve In Use At Manifold 270 PSI PASS

Report Section: MASTER ALARMS

Page: 18 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency Admin

(Panel 2) N2 Amico A2M

Line Pressure

High Above Manifold 190 PSI PASS

Emergency Admin

(Panel 2) N2 Amico A2M

Line Pressure

Low Above Manifold 140 PSI PASS

Emergency Admin

(Panel 2) N2 Amico A2M

High Pressure

Reserve Low Above Manifold PSI PASS

Emergency Admin

(Panel 2) N2 Amico A2M

High Pressure

Reserve In Use At Manifold PSI PASS

Emergency Admin

(Panel 2) N2O Amico A2M Reserve In Use At Manifold 110 PSI PASS

Emergency Admin

(Panel 2) N2O Amico A2M

Line Pressure

High Above Manifold 60 PSI PASS

Emergency Admin

(Panel 2) N2O Amico A2M

Line Pressure

Low Above Manifold 40 PSI PASS

Emergency Admin

(Panel 2) N2O Amico A2M

High Pressure

Reserve Low Above Manifold 60 PSI PASS

Emergency Admin

(Panel 2) N2O Amico A2M

High Pressure

Reserve In Use At Manifold PSI PASS

Emergency Admin

(Panel 2) CO2 Amico A2M Reserve In Use At Manifold 110 PSI PASS

Emergency Admin

(Panel 2) CO2 Amico A2M

Line Pressure

High Above Manifold 60 PSI PASS

Emergency Admin

(Panel 2) CO2 Amico A2M

Line Pressure

Low Above Manifold 40 PSI PASS

Emergency Admin

(Panel 2) CO2 Amico A2M

High Pressure

Reserve Low Above Manifold 60 PSI PASS

Emergency Admin

(Panel 2) CO2 Amico A2M

High Pressure

Reserve In Use At Manifold 125 PSI PASS

Emergency O/S Exam

O2 Amico A2M

High Line

Pressure

ER Ceiling

(A3M)

60 PSI PASS

Emergency O/S Exam

O2 Amico A2M

Low Line

Pressure

ER Ceiling

(A3M)

40 PSI PASS

Report Section: MASTER ALARMS

Page: 19 of 263

Master Alarm Panel

Location/#* *If multiple panels per location

(e.g. "Engineering Panel 1")

System MFR Model Condition

Monitored

Switch or

Source

Location S e t P o in t

U n it o f

M e a s u re Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

MASTER ALARMS: LOCATION & SPECIFICATION FUNCTION & CONDITION

Emergency O/S Exam

MA Amico A2M

High Line

Pressure

ER Ceiling

(A3M)

60 PSI PASS

Emergency O/S Exam

MA Amico A2M

Low Line

Pressure

ER Ceiling

(A3M)

40 PSI PASS

Emergency O/S Exam

VAC Amico A2M

Low Line

Pressure

ER Ceiling

(A3M) 12 inHg PASS

Report Section: MASTER ALARMS

Page: 20 of 263

TOTAL AREA ALARM SIGNALS

BY SYSTEM GAS:

48 45 5 3 2 47 2 0 0

152TOTAL AREA

ALARM SIGNALS

TOTAL AREA ALARM PANELS:

MANUFACTURER

(Or Current Parent

Company )

MODEL AREA ALARM DESCRIPTION

O

M A

N

O

N

C O

V A

C

W A

G D

IA

O th e r

Allied Digital II Gray cover with digital LCD display 26 26 3 1 25 1

Allied Impact Ivory Cover - Digital LEDs 10 10 10

Amico A2A Gray Cover with Digital Pressure 3 3 2 2 2 3

Amico A3A LCD Display 3 3 3

Beacon MEGA 2 Tan Cover - Digital LEDs 3 3

Beacon Mega 3 Touch Screen LCD 2 2 2 1

Tritech MedTouch Med Touch branding with touch LCD display 1 1 1

AREA ALARMS BREAKDOWN (EACH AREA ALARM SIGNAL COUNTED AS SEPARATE ALARM BY SYSTEM GAS BELOW)

TOTAL AREA

ALARM SIGNALS

Report Section: AREA ALARMS INVENTORY

Page: 21 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s u re

R e a d in g

(A ll G a s e s P

S I/

V A

C

W A

G D

H g

H ig h P re s s

S tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

1 Bldg 60 Rm C-166 C-105, 108 & 110 O2 Beacon MEGA 2 51 60 40 PASS

2 Bldg 60 Rm C-166 C-105, 108 & 110 Air Beacon MEGA 2 50 60 40 PASS

3 Bldg 60 Rm C-166 C-105, 108 & 110 Vac Beacon MEGA 2 20 12 PASS

4 Bldg 60 Rm C-161 C-114, 116, 119, 120, 123, 126 O2 Beacon MEGA 2 52 60 40 PASS

5 Bldg 60 Rm C-161 C-114, 116, 119, 120, 123, 126 Air Beacon MEGA 2 49 60 40 PASS

6 Bldg 60 Rm C-161 C-114, 116, 119, 120, 123, 126 Vac Beacon MEGA 2 20 12 PASS

7 Bldg 60 Rm C-155 C-130, 133, 136, 138, 139, 142, 145 O2 Beacon MEGA 2 52 60 40 PASS

8 Bldg 60 Rm C-155 C-130, 133, 136, 138, 139, 142, 145 Air Beacon MEGA 2 49 60 40 PASS

9 Bldg 60 Rm C-155 C-130, 133, 136, 138, 139, 142, 145 Vac Beacon MEGA 2 20 12 PASS

10 Bldg 74 O/S 1D-117 SCI Main Alarm O2 Allied Digital II 51 60 40 PASS

11 Bldg 74 O/S 1D-117 SCI Main Alarm MA Allied Digital II 49 60 40 PASS

12 Bldg 74 O/S 1D-117 SCI Main Alarm N2O Allied Digital II 53 60 40 PASS

13 Bldg 74 O/S 1D-117 SCI Main Alarm VAC Allied Digital II 29 60 12 PASS

14 Bldg 74 O/S 1D-117 SCI Main Alarm N2 Allied Digital II N/A 190 140 PASS Power failure

BLDG 74 OPP 1C-

RMS 1C-

100,104,108,110,11

4,118+

121,124,128,136

,140,144+ 148

O2 Allied Digital II 51 60 40 PASS

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

Report Section: AREA ALARMS

Page: 22 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 74 OPP 1C-

RMS 1C-

100,104,108,110,11

4,118+

121,124,128,136

,140,144+ 148

MA Allied Digital II 49 60 40 PASS

BLDG 74 OPP 1C-

RMS 1C-

100,104,108,110,11

4,118+

121,124,128,136

,140,144+ 148

VAC Allied Digital II 28 12 PASS

BLDG 2 OPP 8C-

8C 113, 114, 117, 118, 119, 120, 121, 122, 128j, 128i, 128g, 128e

O2 Allied Impact N/A 60 40 NOT IN USE Under Construction

BLDG 2 OPP 8C-

8C 113, 114, 117, 118, 119, 120, 121, 122, 128j, 128i, 128g, 128e

MA Allied Impact N/A 60 40 NOT IN USE Under Construction

BLDG 2 OPP 8C-

8C 113, 114, 117, 118, 119, 120, 121, 122, 128j, 128i, 128g, 128e

VAC Allied Impact N/A 12 NOT IN USE Under Construction

BLDG 2 O/S 7C

7C 202, 203, 206, 207, 208, 212, 214, 215, 220, 221, 222

O2 Allied Digital II 50 60 40 PASS

BLDG 2 O/S 7C

7C 202, 203, 206, 207, 208, 212, 214, 215, 220, 221, 222

MA Allied Digital II 52 60 40 PASS

BLDG 2 O/S 7C

7C 202, 203, 206, 207, 208, 212, 214, 215, 220, 221, 222

VAC Allied Digital II 21 12 PASS

Report Section: AREA ALARMS

Page: 23 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 O/S 7C-

7C 104, 107, 108, 109, 110, 111, 113, 118, 119, 120

O2 Allied Impact 50 60 40 PASS

BLDG 2 O/S 7C-

7C 104, 107, 108, 109, 110, 111, 113, 118, 119, 120

MA Allied Impact 52 60 40 PASS

BLDG 2 O/S 7C-

7C 104, 107, 108, 109, 110, 111, 113, 118, 119, 120

VAC Allied Impact 21 12 PASS

BLDG 2 O/S 7C-

7C 409-411, 414, 415, 418, 419, 420, 41, 422, 423, 425

O2 Allied Impact 50 60 40 PASS

BLDG 2 O/S 7C-

7C 409-411, 414, 415, 418, 419, 420, 41, 422, 423, 425

MA Allied Impact 52 60 40 PASS

BLDG 2 O/S 7C-

7C 409-411, 414, 415, 418, 419, 420, 41, 422, 423, 425

VAC Allied Impact 21 12 PASS

30 BLDG 2 6C-101

6C104-

106,110,112,113,11

5,116,117,120A+

121A

O2 Allied Digital II 51 60 40 PASS

31 BLDG 2 6C-101

6C104-

106,110,112,113,11

5,116,117,120A+

121A

MA Allied Digital II 49 60 40 PASS

32 BLDG 2 6C-101

6C104-

106,110,112,113,11

5,116,117,120A+

121A

VAC Allied Digital II 22 12 PASS

Report Section: AREA ALARMS

Page: 24 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 6C-101

Right

6C-

201,202,203,204,20

8,209,216,217,218

O2 Allied Digital II 52 60 40 PASS

BLDG 2 6C-101

Right

6C-

201,202,203,204,20

8,209,216,217,218

MA Allied Digital II 52 60 40 PASS

BLDG 2 6C-101

Right

6C-

201,202,203,204,20

8,209,216,217,218

VAC Allied Digital II 22 12 PASS

BLDG 2 O/S 6C-

6C-408-

410,413,414,417-

422,424,425

O2 Allied Impact 52 60 40 PASS

BLDG 2 O/S 6C-

6C-408-

410,413,414,417-

422,424,425

MA Allied Impact 52 60 40 PASS

BLDG 2 O/S 6C-

6C-408-

410,413,414,417-

422,424,425

VAC Allied Impact 22 12 PASS

39 BLDG 2 I/S 5C-131 5C-131 O2 Allied Impact 49 60 40 PASS

40 BLDG 2 I/S 5C-131 5C-131+ 5C131A MA Allied Impact 50 60 40 PASS

41 BLDG 2 I/S 5C-131 5C-131 VAC Allied Impact 21 12 PASS

42 BLDG 2 @ N/ST

5C-404, 405, 406, 407, 408,410, 411, 412, 413, 414,419 , O2 Allied Impact 50 60 40 PASS

Report Section: AREA ALARMS

Page: 25 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 400 Rms

N/ST

5C-404, 405, 406, 407, 408,410, 411, 412, 413, 414,419 , MA Allied Impact 50 60 40 PASS

BLDG 2 400 Rms

N/ST

5C-404, 405, 406, 407, 408,410, 411, 412, 413, 414,419 , VAC Allied Impact 21 12 PASS

45 BLDG 2 Center NS

4C-104,105,107, 108, 109, 111, 112, 114,119, 120, 121

O2 Allied Digital II 52 60 40 PASS

46 BLDG 2 Center NS

4C-104,105,107, 108, 109, 111, 112, 114,119, 120, 121

MA Allied Digital II 51 60 40 PASS

47 BLDG 2 Center NS

4C-104,105,107, 108, 109, 111, 112, 114,119, 120, 121

VAC Allied Digital II 25 12 PASS

48 BLDG 2 O/S 4C213

4C 215, 216, 219, 220, 221, 222, 223 O2 Allied Digital II 51 60 40 PASS

49 BLDG 2 O/S 4C213

4C 215, 216, 219, 220, 221, 222, 223 MA Allied Digital II 50 60 40 PASS

50 BLDG 2 O/S 4C213

4C 215, 216, 219, 220, 221, 222, 223 VAC Allied Digital II 25 12 PASS

BLDG 2 O/S 4C

4C 207, 208, 209 O2 Allied Digital II 51 60 40 PASS

BLDG 2 O/S 4C

4C 207, 208, 209 MA Allied Digital II 50 60 40 PASS

BLDG 2 O/S 4C

4C 207, 208, 209 VAC Allied Digital II 25 12 PASS

BLDG 2 4C Opp

Bed 13

4C Same Day

Surgery 1-28 O2 Allied Digital II 50 60 40 PASS

Report Section: AREA ALARMS

Page: 26 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 4C Opp

Bed 13

4C Same Day

Surgery 1-28 MA Allied Digital II 52 60 40 PASS

BLDG 2 4C Opp

Bed 13

4C Same Day

Surgery 1-28 VAC Allied Digital II 25 12 PASS

BLDG 2 4C O/S Pre-

Op Entry

4C 316, 317, 318, 321, 322, 323, 324, 325, 327, 328, 329

O2 Allied Digital II 50 60 40 PASS

BLDG 2 4C O/S Pre-

Op Entry

4C 316, 317, 318, 321, 322, 323, 324, 325, 327, 328, 329

MA Allied Digital II 50 60 40 PASS

BLDG 2 4C O/S Pre-

Op Entry

4C 316, 317, 318, 321, 322, 323, 324, 325, 327, 328, 329

VAC Allied Digital II 17 12 PASS

BLDG 2 O/S 3C-

3rd Fl C Wing O2 Allied Impact 50 60 40 PASS

BLDG 2 O/S 3C-

3rd Fl C Wing MA Allied Impact 50 60 40 PASS

BLDG 2 O/S 3C-

3rd Fl C Wing VAC Allied Impact 21 12 PASS

BLDG 2 OPP 2C-

305C

2C 305C & 305I

Rehab/Therapy

Gym

O2 Allied Digital II N/A N/A N/A FAIL Power failure

BLDG 2 OPP 2C-

305C

2C 305C & 305I

Rehab/Therapy

Gym

MA Allied Digital II N/A N/A N/A FAIL Power failure

BLDG 2 OPP 2C-

305C

2C 305C & 305I

Rehab/Therapy

Gym

VAC Allied Digital II N/A N/A N/A FAIL Power failure

BLDG 2 2C

Therapy

2C 305, 412B, 407

Rehab/Therapy

Gym

O2 Allied Digital II 51 60 40 PASS

Report Section: AREA ALARMS

Page: 27 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 2C

Therapy

2C 305, 412B, 407

Rehab/Therapy

Gym

MA Allied Digital II 50 60 40 PASS

BLDG 2 2C

Therapy

2C 305, 412B, 407

Rehab/Therapy

Gym

VAC Allied Digital II 22 12 PASS

BLDG 2 2C Oral

Surgery Entry

2C Oral Surgery 3, 4, 5, 6 O2 Allied Digital II 52 60 40 PASS

BLDG 2 2C Oral

Surgery Entry

2C Oral Surgery 3, 4, 5, 6 MA Allied Digital II 51 60 40 PASS

BLDG 2 2C Oral

Surgery Entry

2C Oral Surgery 3, 4, 5, 6 N2O Allied Digital II N/A NOT IN USE

BLDG 2 2C Oral

Surgery Entry

2C Oral Surgery 3, 4, 5, 6 VAC Allied Digital II 25 12 PASS

BLDG 2 2C Oral

Surgery Entry

2C Oral Surgery 3, 4, 5, 6 WAGD Allied Digital II 25 12 PASS

BLDG 2 2D

Elopment Risk

N/ST

2D 503-507 O2 Tritech MedTouch 50 60 40 PASS

BLDG 2 2D

Elopment Risk

N/ST

2D 503-507 MA Tritech MedTouch 50 60 40 PASS

BLDG 2 2D

Elopment Risk

N/ST

2D 503-507 VAC Tritech MedTouch 18 12 PASS

BLDG 2 O/S 2C

2C 204, 205, 207, 208, 209, 227, 228, O2 Allied Digital II 52 60 40 PASS

BLDG 2 O/S 2C

2C 204, 205, 207, 208, 209, 227, 228, MA Allied Digital II 51 60 40 PASS

Report Section: AREA ALARMS

Page: 28 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2 O/S 2C

2C 204, 205, 207, 208, 209, 227, 228, VAC Allied Digital II 20 12 PASS

BLDG 2

PolyTrauma 2C-213 A-D O2 Amico A2A 50 60 40 PASS

BLDG 2

PolyTrauma 2C-213 A-D MA Amico A2A 51 60 40 PASS

BLDG 2

PolyTrauma 2C-213 A-D VAC Amico A2A 23 12 PASS

BLDG 2 OPP 1C-

1C Clinic 11 O2 Allied Digital II 52 60 40 PASS

BLDG 2 OPP 1C-

1C Clinic 11 MA Allied Digital II 50 60 40 PASS

BLDG 2 OPP 1C-

1C Clinic 11 VAC Allied Digital II 24 12 PASS

BLDG 2 3T-114

Nurse Desk

3T-107 + 3T-112

MRI + 3T-114 MRI

Hold

O2 Allied Impact 52 60 40 PASS

BLDG 2 3T-114

Nurse Desk

3T-107 + 3T-112

MRI + 3T-114 MRI

Hold

MA Allied Impact 49 60 40 PASS

BLDG 2 3T-114

Nurse Desk

3T-107 + 3T-112

MRI + 3T-114 MRI

Hold

VAC Allied Impact 21 12 PASS

89 BLDG 2J 5A N/S 5A 224-5A290 O2 Allied Digital II 52 60 40 PASS

90 BLDG 2J 5A N/S 5A 224-5A290 MA Allied Digital II 49 60 40 PASS

91 BLDG 2J 5A N/S 5A 224-5A290 VAC Allied Digital II 18 12 PASS

92 BLDG 2J CCU N/S CCU 1-10+5A-109H O2 Allied Digital II 52 60 40 PASS

93 BLDG 2J CCU N/S CCU 1-10+5A-109H MA Allied Digital II 49 60 40 PASS

Report Section: AREA ALARMS

Page: 29 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

94 BLDG 2J CCU N/S CCU 1-10+5A-109H VAC Allied Digital II 17 12 PASS

95 BLDG 2J MICU N/S 5A109 MICU 1-10 O2 Allied Digital II 51 60 40 PASS

96 BLDG 2J MICU N/S 5A109 MICU 1-10 MA Allied Digital II 50 60 40 PASS

97 BLDG 2J MICU N/S 5A109 MICU 1-10 VAC Allied Digital II 20 12 PASS

BLDG 2J SICU

N/ST

SICU G-H, J-N, P-

T+ W-Y O2 Allied Digital II 51 60 40 PASS

BLDG 2J SICU

N/ST

SICU G-H, J-N, P-

T+ W-Y MA Allied Digital II 48 60 40 PASS

BLDG 2J SICU

N/ST

SICU G-H, J-N, P-

T+ W-Y VAC Allied Digital II 22 12 PASS

BLDG 2J TICU

N/ST

TICU L+ P-X O2 Allied Digital II 51 60 40 PASS

BLDG 2J TICU

N/ST

TICU L+ P-X MA Allied Digital II 49 60 40 PASS

BLDG 2J TICU

N/ST

TICU L+ P-X VAC Allied Digital II 22 12 PASS

BLDG 2J Hall to the

Right I/S GI Entry Special Procedure O2 Beacon Mega 3 51 60 40 PASS

BLDG 2J Hall to the

Right I/S GI Entry Special Procedure MA Beacon Mega 3 49 60 40 PASS

BLDG 2J Hall to the

Right I/S GI Entry Special Procedure VAC Beacon Mega 3 18 12 PASS

Report Section: AREA ALARMS

Page: 30 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 2J Hall to the

Right I/S GI Entry Special Procedure WAGD Beacon Mega 3 18 60 40 PASS

BLDG 2J Hall to the

Right I/S GI Entry Endo 1-3 O2 Beacon Mega 3 51 60 40 PASS

BLDG 2J Hall to the

Right I/S GI Entry Endo 1-3 MA Beacon Mega 3 50 60 40 PASS

BLDG 2J Inside

MRI

Endo 1-3 VAC Beacon Mega 3 17 12 PASS

BLDG 2J Dialysis

N/ST Opp 13

Dialysis Treatment

Center O2 Allied Digital II 51 60 40 PASS

BLDG 2J Dialysis

N/ST Opp 13

Dialysis Treatment

Center MA Allied Digital II 50 60 40 PASS

BLDG 2J Dialysis

N/ST Opp 13

Dialysis Treatment

Center VAC Allied Digital II 22 12 PASS

BLDG 2J ENT

Reception 3B-100 ENT Clinics O2 Allied Impact 50 60 40 PASS

BLDG 2J ENT

Reception 3B-100 ENT Clinics MA Allied Impact 49 60 40 PASS

BLDG 2J ENT

Reception 3B-100 ENT Clinics VAC Allied Impact 22 12 PASS

BLDG 2J O/S MRI

Hold MRI + Hold O2 Allied Impact 50 60 40 PASS

BLDG 2J O/S MRI

Hold MRI + Hold MA Allied Impact 50 60 40 PASS

BLDG 2J O/S MRI

Hold MRI + Hold VAC Allied Impact 16 12 PASS

Report Section: AREA ALARMS

Page: 31 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG J2 ER O/S

Exam 4

ER Exam Rms 1-7, 25,26+ Psychiatric

Exams 5+6(1A-

405I+1A 405C)

O2 Amico A3A 51 60 40 PASS

BLDG J2 ER O/S

Exam 4

ER Exam Rms 1-7, 25,26+ Psychiatric

Exams 5+6(1A-

405I+1A 405C)

MA Amico A3A 49 60 40 PASS

BLDG J2 ER O/S

Exam 4

ER Exam Rms 1-7, 25,26+ Psychiatric

Exams 5+6(1A-

405I+1A 405C)

VAC Amico A3A 20 12 PASS

BLDG J2 ER O/S

Exam 17

ER Exam Rms 8, 9, 16-24 O2 Amico A3A N/A 60 40 PASS

BLDG J2 ER O/S

Exam 17

ER Exam Rms 8, 9, 16-24 MA Amico A3A N/A 60 40 PASS

BLDG J2 ER O/S

Exam 17

ER Exam Rms 8, 9, 16-24 VAC Amico A3A N/A 12 PASS

BLDG J2 ER O/S

Exam 13

ER Exam Rms 10-

O2 Amico A3A 51 60 40 PASS

BLDG J2 ER O/S

Exam 13

ER Exam Rms 10-

MA Amico A3A 50 60 40 PASS

BLDG J2 ER O/S

Exam 13

ER Exam Rms 10-

VAC Amico A3A 17 12 PASS

BLDG J2 O/S Exam

ER Exam Rms 27-

O2 Allied Digital II N/A N/A N/A UNAVAILABLE Under Construction

BLDG J2 O/S Exam

ER Exam Rms 27-

MA Allied Digital II N/A N/A N/A UNAVAILABLE Under Construction

BLDG J2 O/S Exam

ER Exam Rms 27-

VAC Allied Digital II N/A N/A N/A UNAVAILABLE Under Construction

132 O/S 1B-308 1B-300-400 Rms O2 Allied Digital II 50 60 40 PASS

Report Section: AREA ALARMS

Page: 32 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

133 O/S 1B-308 1B-300-400 Rms MA Allied Digital II 49 60 40 PASS

134 O/S 1B-308 1B-300-400 Rms N2O Allied Digital II 20 60 40 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto O2 Amico A2A 51 60 40 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto MA Amico A2A 49 60 40 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto N2O Amico A2A 48 60 40 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto VAC Amico A2A 18 12 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto N2 Amico A2A 156 180 140 PASS

Bldg 2J OR Control

Desk Right OR 1-4,6-12+ Cysto CO2 Amico A2A 47 60 40 PASS

Bldg 2J OR Control

Desk Left OR 5 O2 Amico A2A 51 60 40 PASS

Bldg 2J OR Control

Desk Left OR 5 MA Amico A2A 49 60 40 PASS

Bldg 2J OR Control

Desk Left OR 5 N2O Amico A2A 49 60 40 PASS

Bldg 2J OR Control

Desk Left OR 5 VAC Amico A2A 20 12 PASS

Bldg 2J OR Control

Desk Left OR 5 N2 Amico A2A 156 180 140 PASS

Bldg 2J OR Control

Desk Left OR 5 CO2 Amico A2A 47 60 40 PASS

Bldg 2J Cath Lab

Control Rm-5B 661 Cath Lab O2 Allied Digital II 51 60 40 PASS

Bldg 2J Cath Lab

Control Rm-5B 661 Cath Lab MA Allied Digital II 49 60 40 PASS

Report Section: AREA ALARMS

Page: 33 of 263

# Physical Location Area/Rooms

Monitored System MFR Model

P re s s a d

G a s e s P

S I/

V A

C

W A g

H ig h P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

L o w P re s s tt in g

(A ll

G a s e s P

S I/

V A

C

W A g

Component

Condition /

Test Results

Deficiency Detail or

Corrective Action

Needed/Taken

AREA ALARMS: LOCATION & SPECIFICATION FUNCTION AND CONDITION

Bldg 2J Cath Lab

Control Rm-5B 661 Cath Lab VAC Allied Digital II 21 12 PASS

150 PACU Opp 10

5B Recovery 1-13, ISO

500B,500E,500F

O2 Allied Digital II 52 60 40 PASS

151 PACU Opp 10

5B Recovery 1-13, ISO

500B,500E,500F

MA Allied Digital II 51 60 40 PASS

152 PACU Opp 10

5B Recovery 1-13, ISO

500B,500E,500F

VAC Allied Digital II 21 12 PASS

2J Nuc Med

Reception Desk Nuc Med Area O2 Allied Digital II 50 60 40 PASS

2J Nuc Med

Reception Desk Nuc Med Area MA Allied Digital II 51 60 40 PASS

2J Nuc Med

Reception Desk Nuc Med Area VAC Allied Digital II 23 12 PASS

Report Section: AREA ALARMS

Page: 34 of 263

TOTAL VALVES

BY SYSTEM GAS:

22 30 14

23 0 9

473TOTAL

VALVES

TOTAL ZONE VALVE BOXES

MANUFACTURER VALVE TYPE VALVE DESCRIPTION

O

M A

N

O

N

C O

V A

C

W A

G D

IA

O th e r

Allied Zone - 1/4 Turn Accessible valve through which all station outlets/inlets are served 108 108 19 29 14 110 23 9

Amico Zone - 1/4 Turn Accessible valve through which all station outlets/inlets are served 6 6 6

Beacon Zone - 1/4 Turn Accessible valve through which all station outlets/inlets are served 11 10 3 1 10

VALVES BREAKDOWN (EACH SYSTEM GAS COUNTED AS SEPARATE ZONE VALVE)

473TOTAL

VALVES

Report Section: VALVES INVENTORY

Page: 35 of 263

# Physical Location Area/Rooms Served System MFR Valve Type

Gauge

Reading (All Gases PSI/

VAC & WAGD

inHg)

Component

Condition / Test

Results

Deficiency Detail or

Corrective Action

Needed/Taken

Bld 60 Main Entrance

Bld 60 All Wings Main

Valve O2 Beacon Zone - 1/4 Turn PASS

2 Bld 60 A Wing O/S A-

Bld 60 Rooms A103-

A118 O2 Beacon Zone - 1/4 Turn 53 PASS

3 Bld 60 A Wing O/S A-

Bld 60 Rooms A103-

A118 MA Beacon Zone - 1/4 Turn 50 PASS

4 Bld 60 A Wing O/S A-

Bld 60 Rooms A103-

A118 VAC Beacon Zone - 1/4 Turn 20 PASS

5 Bld 60 A Wing O/S

A151

Bld 60 Rooms A119-

A133 O2 Beacon Zone - 1/4 Turn 53 PASS

6 Bld 60 A Wing O/S

A151

Bld 60 Rooms A119-

A133 MA Beacon Zone - 1/4 Turn 49 PASS

7 Bld 60 A Wing O/S

A151

Bld 60 Rooms A119-

A133 VAC Beacon Zone - 1/4 Turn 20 PASS

8 Bld 60 B Wing O/S B-

Bld 60 Rooms B103-

B118 O2 Amico Zone - 1/4 Turn 53 PASS

9 Bld 60 B Wing O/S B-

Bld 60 Rooms B103-

B118 MA Amico Zone - 1/4 Turn 52 PASS

10 Bld 60 B Wing O/S B-

Bld 60 Rooms B103-

B118 VAC Amico Zone - 1/4 Turn 20 PASS

11 Bld 60 B Wing O/S B-

Bld 60 Rooms B119-

B132 O2 Amico Zone - 1/4 Turn 50 PASS

12 Bld 60 B Wing O/S B-

Bld 60 Rooms B119-

B132 MA Amico Zone - 1/4 Turn 50 PASS

13 Bld 60 B Wing O/S B-

Bld 60 Rooms B119-

B132 VAC Amico Zone - 1/4 Turn 20 PASS

14 Bld 60 C Wing O/S C-

Bld 60 Rms C105, 108 & 110 O2 Beacon Zone - 1/4 Turn 54 PASS

15 Bld 60 C Wing O/S C-

Bld 60 Rms C105, 108 & 110 MA Beacon Zone - 1/4 Turn 49 PASS

16 Bld 60 C Wing O/S C-

Bld 60 Rms C105, 108 & 110 VAC Beacon Zone - 1/4 Turn 21 PASS

VALVES: LOCATION & SPECIFICATION FUNCTION AND CONDITION

Report Section: VALVES

Page: 36 of 263

# Physical Location Area/Rooms Served System MFR Valve Type

Gauge

Reading (All Gases PSI/

VAC & WAGD

inHg)

Component

Condition / Test

Results

Deficiency Detail or

Corrective Action

Needed/Taken

VALVES: LOCATION & SPECIFICATION FUNCTION AND CONDITION

Bld 60 C Wing O/S C-

Bld 60 Rms C114, 116, 119, 120, 123, O2 Beacon Zone - 1/4 Turn 54 PASS

Bld 60 C Wing O/S C-

Bld 60 Rms C114, 116, 119, 120, 123, MA Beacon Zone - 1/4 Turn 52 PASS

Bld 60 C Wing O/S C-

Bld 60 Rms C114, 116, 119, 120, 123, VAC Beacon Zone - 1/4 Turn 19 PASS

Bld 60 C Wing O/S C-

Bld 60 Rms C130, 133, 136, 138, 139, 142, 145

O2 Beacon Zone - 1/4 Turn 52 PASS

Bld 60 C Wing O/S C-

Bld 60 Rms C130, 133, 136, 138, 139, 142, 145

MA Beacon Zone - 1/4 Turn 50 PASS

Bld 60 C Wing O/S C-

Bld 60 Rms C130, 133, 136, 138, 139, 142, 145

VAC Beacon Zone - 1/4 Turn 20 PASS

BLDG 74 SCI

O/S 1C-100

RM. 1C-

100,104,108,110,114, 118+ 121

O2 Allied Zone - 1/4 Turn 51 PASS

BLDG 74 SCI

O/S 1C-100

RM. 1C-

100,104,108,110,114, 118+ 121

MA Allied Zone - 1/4 Turn 52 PASS

BLDG 74 SCI O/S

1C-100

RM. 1C-

100,104,108,110,114, 118+ 121

VAC Allied Zone - 1/4 Turn 29 PASS

BLDG 74 SCI

O/S 1C-124

RMS 1C-124,128,136

,140,144+ 148 O2 Allied Zone - 1/4 Turn 50 PASS

Report Section: VALVES

Page: 37 of 263

# Physical Location Area/Rooms Served System MFR Valve Type

Gauge

Reading (All Gases PSI/

VAC & WAGD

inHg)

Component

Condition / Test

Results

Deficiency Detail or

Corrective Action

Needed/Taken

VALVES: LOCATION & SPECIFICATION FUNCTION AND CONDITION

BLDG 74 SCI

O/S 1C-124

RMS 1C-124,128,136

,140,144+ 148 MA Allied Zone - 1/4 Turn 50 PASS

BLDG 74 SCI

O/S 1C-124

RMS 1C-124,128,136

,140,144+ 148 VAC Allied Zone - 1/4 Turn 29 PASS

74 SCI O/S 1D-117

1D-127, 1D-133, 1D-

134+ 1B-111(Pool) O2 Allied Zone - 1/4 Turn NOT IN USE Under Construction

74 SCI O/S 1D-117

1D-127, 1D-133, 1D-

134+ 1B-111(Pool) MA Allied Zone - 1/4 Turn NOT IN USE Under Construction

74 SCI O/S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .