This file contains detailed architectural and engineering design drawings for renovating the police area at George H. O'Brien, Jr. Veterans Affairs Medical Center in Big Spring, Texas. The comprehensive set of drawings covers multiple disciplines including architectural, structural, mechanical, electrical, plumbing, fire protection, and technology systems for a complete renovation of the facility's police department spaces.
The project involves a phased renovation of approximately 2,280 square feet, transforming existing spaces into a modernized police area with new security features. Key renovations include creating a security control center, interview rooms, evidence room, armory, holding area, and administrative offices. The drawings specify detailed requirements for architectural modifications, infrastructure upgrades, security systems, technology infrastructure, electrical and mechanical systems, and specialized security features like ballistic-resistant walls, doors, and windows. The project is set for 100% construction documents as of December 13, 2024, with a VA project number of 519-17-800 and is designed to enhance the facility's police department operational capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GEO Report.pdf | ||
| 36C25725R0056 0004.docx | DOCX document | |
| 36C25725R0056 0003.docx | DOCX document | |
| Additonal Pre-Bid RFIs 36C25725R0056.xlsx | XLSX spreadsheet | |
| Pre-Bid RFIs 36C25725R0056 Responses.xlsx | XLSX spreadsheet | |
| 36C25725R0056 0002.docx | DOCX document | |
| ATTACHMENT 1 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Site Visit Sign in sheet Copy.pdf | ||
| 36C25725R0056 0001.docx | DOCX document | |
| PreBid RFIs 36C25725R0056 Responses.pdf | ||
| VHA ICRA-RenoPD 5-7-25 - Copy.pdf | ||
| Attachment 4 Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C25725R0056_1.docx | DOCX document | |
| VHA PCRA-RenoPD 5-7-25 - Copy.pdf | ||
| 20-372 Drawings 100Percent SS 20240930 - Copy.pdf | ||
| 20-372 Specs 100percent SS 20240930 - Copy.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
POC/COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
JONATHAN SCHMIDT
CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
/1
/2
:1
:0
P
M C
U s e rs
\b n e e d h a m
\R e v it F ile B a c k u p s \A
-V A
B ig
S p ri n g R e n o v P o lic e b n e e d h a m
H L
.r v t
G-001
COVER SHEET
1 6BN
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720 DECEMBER 13, 2024
100% CONSTRUCTION DOCUMENTS
519-17-80020-372-Q22
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720
VA PROJECT #: 519-17-800
JAB
DRAWING INDEX
GENERAL
G-001 COVER SHEET 1 6
G-002 CAMPUS PLAN 2 6
G-101 ICRA DETAILS - TYPICAL STANDARDS 3 6
GC101 PROPOSED FIRST FLOOR PHASING PLAN - POLICE AREA 4 6
GL101 OVERALL FIRST FLOOR LIFE SAFETY PLAN 5 6
GL102 FIRST FLOOR POLICE AREA LIFE SAFETY PLAN 6 6
CIVIL
CS101 SITE AND PAVING PLAN 1 1
STRUCTURAL
S-101 PARTIAL CRAWL SPACE FOUNDATION PLAN, WALL SECTION AND DETAILS 1 1
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 12
AD101 FIRST FLOOR DEMOLITION PLAN - POLICE AREA 2 12
AD110 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN 3 12
AE101 FIRST FLOOR PLAN POLICE AREA 4 12
AE102 DEMOLITION ROOF PLAN - POLICE AREA & ROOF PLAN - POLICE AREA 5 12
AE110 FIRST FLOOR REFLECTED CEILING PLAN 6 12
AE401 ENLARGED FLOOR PLANS 7 12
AE501 PARTITION TYPES AND DETAILS 8 12
AE502 DETAILS, INTERIOR ELEVATIONS, SECTION 9 12
AE503 ROOFING EQUIPMENT DETAILS 10 12
AE601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 11 12
AE602 DOOR DETAILS 12 12
INTERIORS
I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 6
I-101 FIRST FLOOR FINISH AND WALL PROTECTION PLAN 2 6
I-201 CASEWORK AND MILLWORK ELEVATIONS 3 6
I-202 CASEWORK DETAILS 4 6
I-411 FIRST FLOOR OVERALL EQUIPMENT PLAN 5 6
I-421 ENLARGED EQUIPMENT PLANS 6 6
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 FIRST FLOOR FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
PW101 FIRST FLOOR DRAIN, WASTE, AND VENT PLANS 2 4
PP101 FIRST FLOOR DOMESTIC WATER PLANS 3 4
P-501 PLUMBING DETAILS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 8
MH101 FIRST FLOOR MECHANICAL PLANS 2 8
MH102 LOW ROOF MECHANICAL PLAN 3 8
MP101 FIRST FLOOR MECHANICAL PIPING PLAN 4 8
M-501 MECHANICAL DETAILS 5 8
M-502 MECHANICAL DETAILS 6 8
M-503 MECHANICAL CONTROLS 7 8
M-601 MECHANICAL SCHEDULES 8 8
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLANS 2 9
EP100 BASEMENT POWER PLAN 3 9
EP101 FIRST FLOOR POWER PLAN 4 9
EL101 FIRST FLOOR LIGHTING PLAN 5 9
EM101 MECHANICAL POWER PLANS 6 9
E-501 ELECTRICAL DETAILS 7 9
E-601 SINGLE LINE DIAGRAM 8 9
E-602 PANEL SCHEDULES 9 9
TECHNOLOGY
TK001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 6
TK101 FIRST FLOOR TECHNOLOGY PLAN 2 6
TP101 FIRST FLOOR SECURITY PLAN 3 6
TK501 TECHNOLOGY DETAILS 4 6
TK502 DOOR HARDWARE DETAILS 5 6
TK601 TECHNOLOGY RISERS 6 6
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
FA101 FIRST FLOOR FIRE ALARM PLAN 2 2
PROJECT LOCATION
CONTROLLED BY: Department of Veterans Affairs
CUI CATEGORY: PRVCY
LIMITED DISSEMINATION CONTROL: FEDCON
POC: Jonathan Schmidt, Jonathan.Schmidt@va.gov
PROJECT AREA
Docusign Envelope ID: CAFEF8F9-82CC-4A46-B2B6-64E662A83660
12/12/2024
BLDG 3
BLDG 2BLDG 19
BLDG 20
BLDG 21
BLDG
BLDG 17
BLDG 1
BLDG 16
BLDG 10
BLDG 7
BLDG
BLDG
BLDG 4
BLDG
BLDG
EM
STOR.
BLDG
BLDG
BLDG
LAYDOWN
AREA
C O N
TR
AC
TO
R
P
AR
K
IN
G
W. VETERANS BLVD.
RYON ST.
S O
U T
H G
R E
G G
S T
W MARCY DR.
S
L A
N C
A S
T E
R S
T
RYON ST.
L A
L O
M A
A V
E
S
L A
N C
A S
T E
R S
T
PROPOSED CRANE LOCATION FOR NEW ROOF TOP
EQUIPMENT INSTALLATION. CRANE LIFT SHOULD BE
SCHEDULED ON OFF HOURS/WEEKENDS DUE TO
STAFF OCCUPANCY MONDAY THRU FRIDAY. GC TO
INFORM VA COR 14 DAYS PRIOR TO THE START OF
ANY CRANE ACTIVITIES.
CONTRACTOR LAYDOWN AREA
AREA OF WORK
CONTRACTOR PARKING AREA
EXISTING BUILDING
Engineers Architects
Revisions: Date
Drawing Title
POC/COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
JONATHAN SCHMIDT
CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
/1
/2
:1
:0
P
M C
U s e rs
\b n e e d h a m
\R e v it F ile B a c k u p s \A
-V A
B ig
S p ri n g R e n o v P o lic e b n e e d h a m
H L
.r v t
G-002
CAMPUS PLAN
2 6BN
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720 DECEMBER 13, 2024
100% CONSTRUCTION DOCUMENTS
519-17-80020-372-Q22
JAB
Scale: 1" = 50'-0"
CAMPUS PLAN
BUILDING 1 - MAIN HOSPITAL
BUILDING 2 - WAREHOUSE/BOILER PLANT
BUILDING 3 - ENGINEERING
BUILDING 4 - IRM
BUILDING 7 - QUARTERS
BUILDING 8 - HUMAN RESOURCE
BUILDING 10 - EMS/COMPLIANCE
BUILDING 16 - TRAINING ROOM
BUILDING 17 - BUSINESS SPACE
BUILDING 18 - DOMICILIARY
BUILDING 19 - EMERGENCY MANAGEMENT
BUILDING 20 - SWING SPACE
BUILDING 21 - EDUCATION
BUILDING 22 - GENERATOR BUILDING
BUILDING 23 - WATER TOWER
BUILDING 25 - SMALL HOUSE
BUILDING 77 - BMS STORAGE
BUILDING 78 - BMS STORAGE
CAMPUS PLAN LEGEND
CAMPUS BUILDING LIST
NORTH
0 5025 100
PLASTIC
WINDOW
SWIVEL
CASTERS
WITH TWO
LOCKING
BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
SEALANT, BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
NON RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
EXHAUST LOCATION
- SEE NOTE A
FLEX DUCT
EXISTING WALL
BARRIER
NOTE:
1. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL
VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATE POLICE AREA
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
A. THIS PROJECT NEEDS AN ENTRY VESTIBULE
FOR CLOTHING CHANGES (PROVIDE AND
LOCATE A STAGING AREA FOR HAZMAT SUITS
NEAR THE PLASTIC BARRIER ENTRANCE
SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO
CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE
AND TIGHT SEALS SHALL BE MAINTAINED AT
THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE
IMMEDIATELY CLEANED IF TRACKED OUTSIDE
OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE,
DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST
AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE
BEFORE REMOVAL OF A PERMANENT BARRIER.
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND
EXIT PROCEDURES SHALL BE DEFINED.
EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED
DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE.
SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
C. DEMOLITION DEBRIS: DEBRIS SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, USING DESIGNATED TRAFFIC
ROUTES .EFFORTS SHALL BE MADE TO
MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE
LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL
BE REMOVED DAILY AND AT TIMES SPECIFIED
BY THE VAMC. IF CHUTES ARE USED TO DIRECT
DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE
AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT
IN USE. FILTERS SHALL BE BAGGED AND
SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE COR.
D. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND
WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR
PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH
AN INDUSTRIAL GRADE, PORTABLE HEPA
FILTER CAPABLE OF FILTRATION RATES OF
300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST SHALL BE
TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
E. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
F. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR
SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE
AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY
THE COR.
G. WORKSITE CLOTHING: CONTRACTOR
PERSONNEL CLOTHING SHALL BE FREE OF
LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE
APPAREL IS NOT WORN (E.G., COVERALLS,
FOOTGEAR AND HEADGEAR) A HEPA-FILTERED
VACUUM SHALL BE USED TO REMOVE DUST
FROM CLOTHING BEFORE LEAVING THE
BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED, THE CONTRACTOR SHALL
CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING
EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET
WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
H. POST CONSTRUCTION: DO NOT REMOVE
BARRIERS AND KEEP ALL HVAC ISOLATION
UNTIL CONTRACTOR HAS CLEANED
CONSTRUCTION SITE.
I. PROVIDE RATED BARRIERS AS INDICATED ON
DRAWINGS. BARRIERS SHALL BE INSPECTED BY
VA ICRA STAFF PRIOR TO START OF
CONSTRUCTION. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
J. THESE DETAILS ARE TYPICAL ICRA DETAILS
AND NOT PROJECT SPECIFIC. ICRA
REQUIREMENTS ARE TO BE SUBMITTED FOR
REVIEW PRIOR TO INSTALLATION OF ICRA
REQUIREMENTS.
K. PROVIDE STICKY MAT AT EACH CONSTRUCTION
POINT IN ALL PHASES.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
C
LA
S S
II
I
C
LA
S S
IV
C
LA
S
S V
During Construction Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Type of Construction / Project Activity Table
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
TYPE A
TYPE B
TYPE C
TYPE D
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
• Office areas (non-clinical)
• FES/EMS areas
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing
Service
• Intensive Care Units
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type
Patient Risk Group
LOW Risk Group 1
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4
TYPE A TYPE B TYPE C TYPE D
I
I
I
III
II
II
III
IV
II
III
IV
V
III
IV
V
V
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
Class III or Class IV control procedures are necessary.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project Upon Completion of Project
C
LA
S S
I C
LA
S
S
II
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Engineers Architects
Revisions: Date
Drawing Title
POC/COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
JONATHAN SCHMIDT
CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
/1
/2
:1
:0
P
M C
U s e rs
\b n e e d h a m
\R e v it F ile B a c k u p s \A
-V A
B ig
S p ri n g R e n o v P o lic e b n e e d h a m
H L
.r v t
G-101
ICRA DETAILS - TYPICAL STANDARDS
3 6BN
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720 DECEMBER 13, 2024
100% CONSTRUCTION DOCUMENTS
519-17-80020-372-Q22
JAB
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
DN
UP
H
I
J
20 69 72 27 28
LOCKER
ROOM
4B
TRAINING
ROOM
4A
SHARED
OFFICE
1G
CHIEF
1D
STORAGE
1D
CORRIDOR
1A
DEPUTY
CHIEF
1B
MENS
TOILET
WOMEN
TOILET
POLICE
CHECK
IN
HOLDING
4F
ARMORY
4E
CHIEF POLICE
OFFICE
MAIN
LOBBY
VESTIBULE
ELEVATOR
LOBBY
PHASE
PHASE
PHASE
PHASE
22 70 71 73
DISPATCH
PHASE
4OFFICE
4C
OFFICE
82 23 25 26 26.A24
NOT IN CONTRACT
PHASE 1 - OFFICE AREA
PHASE 2 - SECURITY CONTROL CENTER
PHASE 3 - INTERVIEW AREA AND EVIDENCE ROOM
PHASE 4 - POLICE CHECK-IN / OPERATIONS
PHASE 5 - ARMORY AND HOLDING
Engineers Architects
Revisions: Date
Drawing Title
POC/COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JONATHAN SCHMIDT
CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
/1
/2
:1
:0
P
M C
U s e rs
\b n e e d h a m
\R e v it F ile B a c k u p s \A
-V A
B ig
S p ri n g R e n o v P o lic e b n e e d h a m
H L
.r v t
GC101
PROPOSED FIRST FLOOR PHASING
PLAN - POLICE AREA
4 6BN
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720 DECEMBER 13, 2024
100% CONSTRUCTION DOCUMENTS
519-17-80020-372-Q22
JAB
N O R
TH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
PROPOSED FIRST FLOOR PHASING PLAN - POLICE AREA
1. WORK IN THE PHASE 1 AREA CAN BE PERFORMED
CONCURRENTLY WITH ANY OTHER PHASE. THIS AREA
WILL BE VACATED DURING PHASE 1 CONSTRUCTION,
2. PHASE 2 AND 3 CAN BE PERFORMED
CONCURRENTLY.
3. PHASE 2 MUST BE COMPLETED AND THE SCC AND
SCC EQUIPMENT ROOM MUST BE OPERATIONAL,
WITH ALL DISPATCH EQUIPMENT AND FUNCTIONS
RELOCATED TO THE SCC, BEFORE STARTING PHASE
4.
4. PHASE 3 MUST BE COMPLETED PRIOR TO STARTING
PHASE 5.
5. INSTALL ICRA BARRIERS, PER REQUIREMENT ON
SHEET G-101, IN EACH PHASE OF CONSTRUCTION TO
MAINTAIN ICRA REQUIREMENTS.
6. THE ARMORY (4E) AND HOLDING SPACE (4F) MUST
BE FUNCTIONAL AND IN OPERATION DURING ALL
PHASE 5 WORK.
A. CONTRACTOR TO COORDINATE WORK OF EACH
PHASE WITH C.O.R. THE POLICE DEPARTMENT
MUST REMAIN OPERATING THROUGHOUT THE
CONSTRUCTION PROJECT.
B. MECHANICAL ROOM FOR THE SCOPE OF WORK,
ALL MECHANICAL EQUIPMENT FOR POLICE AREA IS
LOCATED ON THE ROOF AND IS NOT TIED INTO
ANY EXISTING MECHANICAL SPACES.
C. THE POLICE AREA ELECTRICAL SPACES WILL BE
TIED INTO THE EXISTING ELECTRICAL ROOM
LOCATED IN THE BASEMENT LEVEL BETWEEN
GRIDLINE '20' AND 26A' AND SHOWN ON
ELECTRICAL DRAWINGS.
D. REFER TO SHEET G-101 FOR TYPICAL DETAILS FOR
INFECTIOUS CONTROL MEASURES TO BE
IMPLEMENTED FOR EACH PHASE OF THE
PROJECT.
E. CONTRACTOR MAY BE REQUIRED TO PERFORM
SOME PARTS OF CONSTRUCTION DURING NON
WORKING HOURS (7:30 AM - 4:00 PM M-F),
COORDINATE ALL OFF HOURS WORKS WITH COR.
F. DESCRIPTION OF PHASING ON THIS SHEET
INCLUDES A GENERAL OVERVIEW OF THE SCOPE
OF WORK TO BE PERFORMED IN EACH PHASE.
REFER TO ALL CONTRACT DOCUMENTS FOR
ADDITIONAL ITEMS WHICH MAY NOT BE NOTED ON
THIS SHEET.
G. CONTRACTOR TO COORDINATE ALL NEW
MECHANICAL PENETRATIONS WITH PLUMBING
DRAWINGS AND ARCHITECTURAL DRAWINGS.
H. CONTRACTOR SHALL COORDINATE WITH THE COR
ALL SLAB PENETRATION WORK AND SLAB REPAIR
WORK TO BE PREFORMED.
I. CONTRACTOR SHALL COORDINATE WITH THE COR
ALL INSTALLATION OF ABOVE CEILING DUCTWORK
AND CONDUIT IN AREAS NOT IN THE DESIGNATED
AREA OF WORK. THIS WORK TO BE PERFORMED
DURING OFF HOURS.
J. IF SPACE REMAINS OCCUPIED DURING PHASING
ACTIVITIES, CONTRACTOR SHOULD ALWAYS
PROVIDE A SAFE MEANS OF EGRESS TO THE
NEAREST POINT OF EXITING.
# KEY NOTES:
STRUCTURAL
• NO WORK ANTICIPATED.
ARCHITECTURAL
• OFFICES ON EAST SIDE OF MAIN LOBBY TO BE CONVERTED FROM EXAM ROOM, NURSES AND
PROVIDER OFFICES TO TWO PRIVATE POLICE OFFICES AND ONE SHARED POLICE OFFICE. WORK INCLUDES REMOVAL OF CASE WORK AND REFINISHING ALL EXISTING FINISHES, WALL, FLOORS, CEILINGS, DOORS, INSTALLATION OF NEW HARDWARE AND DOOR FROM LOBBY INTO OFFICE
AREA 101A.
FIRE PROTECTION
• REMOVE EXISTING SPRINKLERS AND ADD NEW SPRINKLERS IN NEW CEILINGS TO MEET NFPA 13.
PLUMBING
• REMOVE PLUMBING FIXTURE AS SHOWN - AND INSTALL NEW WHERE SHOWN.
MECHANICAL
• REMOVE EXISTING DUCTWORK IN PHASING AREA. ADD NEW AIR HANDLING UNIT ON THE ROOF
AND EXTEND TO EACH ROOM, INCLUDING VAV BOXES.
ELECTRICAL
• (A) PROVIDE AND INSTALL SUPPORTING INFRASTRUCTURE IN BASEMENT FOR NEW SECURITY
EQUIPMENT ROOM FOR TIE-IN DURING PHASE 2. SEE ELECTRICAL BASEMENT PLANS FOR
ADDITIONAL INFORMATION.
• (B) DISCONNECT AND REMOVE EXISTING POWER AND LIGHTING DEVICES. PROVIDE AND
CONNECT NEW LIGHTING, EQUIPMENT, AND RECEPTACLES FOR REMODELED SPACE.
TECHNOLOGY
• DISCONNECT AND REMOVE EXISTING DATA, COMMUNICATION, AND SECURITY DEVICES.
PROVIDE AND CONNECT NEW DATA AND COMMUNICATION DEVICES FOR REMODELED SPACE.
PROVIDE AND ROUGH-IN SECURITY DEVICES FOR REMODELED SPACE CONNECT NEW DEVICES
TO NEW SECURITY EQUIPMENT ROOM DURING PHASE 2.
FIRE ALARM
• DISCONNECT AND REMOVE EXISTING FIRE ALARM DEVICES. PROVIDE AND CONNECT FIRE
ALARM DEVICES FOR REMODELED SPACE.
PHASE 1 - OFFICE AREA
STRUCTURAL
• PROVIDE NEW FOOTING AND FOUNDATION WALL IN CRAWL SPACE, FULL LENGTH. COMPLETE
BLAST WALL BETWEEN COLUMN 99 AND COLUMN 103.
ARCHITECTURAL
• CONVERSION OF EXISTING LOCKER ROOM AND FLAG DISPLAY AREA INTO A SECURITY CONTROL
CENTER, 2 LOCKER ROOMS AND AN SECURITY EQUIPMENT ROOM, INCLUDING CONSTRUCTION
OF 12" CMU WALL BETWEEN MAIN LOBBY AND NEW POLICE OPERATIONS AREA.
FIRE PROTECTION
• REMOVE EXISTING SPRINKLERS AND ADD NEW SPRINKLERS IN NEW CEILINGS TO MEET NFPA 13.
PLUMBING
• REMOVE PLUMBING FIXTURE AS SHOWN - AND INSTALL NEW WHERE SHOWN.
MECHANICAL
• REMOVE EXISTING DUCTWORK IN PHASING AREA. ADD NEW AIR HANDLING UNIT ON THE ROOF
AND EXTEND TO EACH ROOM, INCLUDING VAV BOXES.
ELECTRICAL
• DISCONNECT AND REMOVE EXISTING POWER AND LIGHTING DEVICES. PROVIDE AND INSTALL
ASSOCIATED ELECTRICAL EQUIPMENT FOR NEW SECURITY EQUIPMENT ROOM AND CONNECT
DEVICES TO ROUGHED IN INFRASTRUCTURE. PROVIDE AND CONNECT NEW LIGHTING,
EQUIPMENT, AND RECEPTACLES FOR REMODELED SPACE.
TECHNOLOGY
• DISCONNECT AND REMOVE EXISTING DATA, COMMUNICATION, AND SECURITY DEVICES.
PROVIDE AND CONNECT NEW DATA, COMMUNICATION, AND SECURITY DEVICES FOR
REMODELED SPACE. CONNECT ROUGHED IN SECURITY DEVICES IN POLICE OFFICE SPACE TO
SECURITY EQUIPMENT ROOM.
FIRE ALARM
• DISCONNECT AND REMOVE EXISTING FIRE ALARM DEVICES. PROVIDE AND CONNECT FIRE
ALARM DEVICES FOR REMODELED SPACE.
PHASE 2 - SECURITY CONTROL CENTER
STRUCTURAL
• PROVIDE WALL REINFORCEMENT FOR EVIDENCE ROOM.
ARCHITECTURAL
• CONVERSION OF CHIEF OF POLICE OFFICE AND PRIVATE OFFICE INTO AN INTERVIEW ROOM AND
AN EVIDENCE ROOM, BOTH SPACES MUST BE SECURE AREA.
FIRE PROTECTION
• REMOVE EXISTING SPRINKLERS AND ADD NEW SPRINKLERS IN NEW CEILINGS TO MEET NFPA 13.
PLUMBING
• NO WORK ANTICIPATED.
MECHANICAL
• EXTEND DUCTWORK FROM NEW AIR HANDLING UNIT INSTALLED IN PHASE 2 TO EACH ROOM IN
PHASE 3.
ELECTRICAL
• DISCONNECT AND REMOVE EXISTING POWER AND LIGHTING DEVICES. PROVIDE AND CONNECT
NEW LIGHTING, EQUIPMENT, AND RECEPTACLES FOR REMODELED SPACE.
TECHNOLOGY
• DISCONNECT AND REMOVE EXISTING DATA, COMMUNICATION, AND SECURITY DEVICES.
PROVIDE AND CONNECT NEW DATA, COMMUNICATION, AND SECURITY DEVICES FOR
REMODELED SPACE.
FIRE ALARM
• DISCONNECT AND REMOVE EXISTING FIRE ALARM DEVICES. PROVIDE AND CONNECT FIRE
ALARM DEVICES FOR REMODELED SPACE.
PHASE 3 - INTERVIEW AREA + EVIDENCE ROOM
STRUCTURAL
• COMPLETE BLAST WALL BETWEEN COLUMN 94 AND COLUMN 99.
ARCHITECTURAL
• RENOVATION OF THE POLICE CHECK-IN SPACE AND CONVERSION OF THE TRAINING ROOM INTO
POLICE OPERATIONS. WORK IN THE POLICE CHECK-IN SPACE WILL INCLUDE ADDITION OF A
VESTIBULE AT THE MAIN ENTRY DOOR FROM THE LOBBY, ADDITION OF TWO PASS THRU/ TELLER
TYPE WINDOWS, ONE ON THE LOBBY WALL AND ONE IN THE VESTIBULE. CONVERSION OF THE
TRAINING SPACE TO A POLICE OPERATIONS AREA, WORK INCLUDES THE RELOCATION OF THE
DISPATCH AREA IN POLICE TRAINING INTO THE NEW SCC SPACE.
FIRE PROTECTION
• REMOVE EXISTING SPRINKLERS AND ADD NEW SPRINKLERS IN NEW CEILINGS TO MEET NFPA 13.
PLUMBING
• NO WORK ANTICIPATED.
MECHANICAL
• EXTEND DUCTWORK FROM NEW AIR HANDLING UNIT INSTALLED IN PHASE 2 TO EACH ROOM AND
PHASE 4.
ELECTRICAL
• DISCONNECT AND REMOVE EXISTING POWER AND LIGHTING DEVICES. PROVIDE AND CONNECT
NEW LIGHTING, EQUIPMENT, AND RECEPTACLES FOR REMODELED SPACE.
TECHNOLOGY
• DISCONNECT AND REMOVE EXISTING DATA, COMMUNICATION, AND SECURITY DEVICES.
PROVIDE AND CONNECT NEW DATA, COMMUNICATION, AND SECURITY DEVICES FOR
REMODELED SPACE.
FIRE ALARM
• DISCONNECT AND REMOVE EXISTING FIRE ALARM DEVICES. PROVIDE AND CONNECT FIRE
ALARM DEVICES FOR REMODELED SPACE.
PHASE 4 - POLICE CHECK IN / OPERATIONS
STRUCTURAL
• NO WORK ANTICIPATED.
ARCHITECTURAL
• RENOVATION OF THE HOLDING ROOM INCLUDES THE REMOVAL OF THE DOOR AND REVERSING
THE DOOR SWING. THE NEW DOOR WILL BE A HEAVY DUTY DOOR WITH PACS ACCESS
HARDWARE. THE ARMORY MUST REMAIN ACCESSIBLE THROUGHOUT CONSTRUCTION,
RENOVATION WILL INCLUDE FINISHES AND HARDWARE REPLACEMENT.
FIRE PROTECTION
• REMOVE EXISTING SPRINKLERS AND ADD NEW SPRINKLERS IN NEW CEILINGS TO MEET NFPA 13.
PLUMBING
• NO WORK ANTICIPATED.
MECHANICAL
• CONNECT ARMORY SUPPLY DIFFUSER TO DUCT INSTALLED IN PHASE 2.
ELECTRICAL
• DISCONNECT AND REMOVE EXISTING POWER AND LIGHTING DEVICES. PROVIDE AND CONNECT
NEW LIGHTING, EQUIPMENT, AND RECEPTACLES FOR REMODELED SPACE.
TECHNOLOGY
• DISCONNECT AND REMOVE EXISTING DATA, COMMUNICATION, AND SECURITY DEVICES.
PROVIDE AND CONNECT NEW DATA, COMMUNICATION, AND SECURITY DEVICES FOR
REMODELED SPACE.
FIRE ALARM
• DISCONNECT AND REMOVE EXISTING FIRE ALARM DEVICES. PROVIDE AND CONNECT FIRE
ALARM DEVICES FOR REMODELED SPACE.
PHASE 5 ARMORY + HOLDING
PROPOSED PHASING LEGEND
114A
114B
18B
3A
87I
87K
20A
113B
107A
107B
96C
96B
127 128
72F
18A
147C
65B
91G
91J
119A
119B
125D
120D
122A 122B
122D 122C
124A 124B
124C 124D
125A
125C 125B
136137
147B
147A
ATS
ENG.
145A
120C
120B 120A119C
119C
113A
112H
106B
106A
104A
105A
100A
98 97
164A162 161160159
85A
158A82
91C
95A
95B
96A
96D96E
91B
91D 91E
91H
91A 91I
91F87E
87D
9090A
87C 87B
87O
87P
87N 87M
87A
87F87G
87L
152A
153B
153A
1556A78910
65A
72G
55A
53B5353A
28A
31E
31A
31E
31B
31C
91K
91M91N
91L
112A
HEALTH
BENEFIT
ADMIN.
64B
64A
67A
112B
112C
112D
112E
112F
112G
HEALTH
BENEFIT
ADMIN.
EYEWASH
RO WATER
ICE MACHICE
EYEWASH
EYEWASH
Hose Bibb
3 washers
WH
washer
138A
CLOSET
MENS
BATH RM
CHEMICAL STORAGE
CART WASH
ELECTRICAL CLOSET
HOUSE
KEEPING
SUPPLY
MALE
REST RM
DRESSING RM
DRESSING RM
MALE
REST RM
EMS
SOILED
LINEN RM
REST RM
MALE
REST RM
CLOSET
HOUSE KEEPING
TELECOM
CLOSET
SCALE
SOILED UTILITY
REST RM
REST
RM STAFF
TOILET TELECOM CLOSET
REST RM
ELECTRICAL RM
HOUSE
KEEPING
CLOSET
HOUSE
KEEPING
FP
FP
NURSE OFFICE ER
MED DISPENSING
PHARMACY VAULT
SMOKING SHELTERSMOKING SHELTER
FP
CLINIC
WAITING
AREA PRIMARY CARE
SOCIAL
WORKER
NURSE
Office
Primary Care Nurse
ELECTRICAL RM
MED
DISPENSARY
STAIR
EXAM
RM
(PURPLE)
CLINIC
(ORANGE)
COPY RM NURSE CLINIC (GOLD)PHYSICAIN (GOLD)
VACANT
CLINIC
ROOM
(GOLD)
EXAM ROOM (GOLD)
NURSE TRIAGE (SILVER)
PHYSICAIN
(SILVER)
EXAM
RM
(SILVER)
EXAM
ROOM
(SILVER)
NURSE
TRIAGE
(PURPLE)
EXAM
RM
(PURPLE)
PHYSICIAN
(PURPLE)
TELE- HEALTH
WHEEL
CHAIR
AREA
RECEPTION CONTROL
STAIR
C
TEXAS
VETERANS
COMMISSION
CLOSET
D.A.V
CLINIC EXAM (GOLD)
physicain (ORANGE)
NURSE
CLINIC
(ORANGE)
Pahamacist health behavior Coor, AUDIOLOGIST
TRIAGE
UC BED
BREAK RM
MED
RM
CORRIDOR
PATIENT
AFFECT
RM / EMS
PATIENT CLOTHING
LINEN REPAIR
OUTDOOR EQUIP
BREAK RM
LAUNDRY FOREMAN
CLEAN
LINEN
STORAGE
SOILED LINEN
RM / EMS
LINEN
RM EMS
FEMALE
REST
RM EMS
RELEASE OF
INFORMATION
CHIEF
HIMS
STORAGE
EQUINOX RM IRM FILE RM
CLINICAL
PHARMACY
MY
HEALTHY
VET
TELE-
HEALTHPHARMACY WAITING AREA
PHARMACY PATIENT COUNSELING
LINEN CHUTE
BREAK RM
FIRE
ALARM
PHARMACY CHIEF
SECY
AUDIOLOGY
BOOTH
SUPPLY
RM IRM
OFFICEOFFICE
NARC VAULT
STORAGE
CONSULTING RM
INPATIENT PHARMACY
IV
RM
BREAK RM
MEDICATION DISPENSINGINGREDIENT CONTROL
DIET
OFFICE
TRAVEL AGENTAGENT CASHIER
NUTRITION AND FOOD
CHIEF
NUTRITION
FOOD AND SVC
DISHWASHER AREA
FP
POTS
AND
PANS
WASH RM
WALK-IN
REFRIGERATION
FREEZER
FREEZER
WALK-IN REFRIED
WALK-IN
REFRIGERATION
DESSERT / NOURISHMENT AREA
VEGETABLE PREP
WALK-IN
REFRIGERATION
STORAGE
C&P
VACANT
STAFF
OPHTHALMOLOGY
PATIENT
REPRESENTATIVE
DIRECTOR
FP
FEE
BASIS
DIRECTORS
STAIR
- B
COMMUNCATION
SPECIALIST
STORAGE
VOLUNTARY
STORAGE
VCS STORAGE
A/O
CANTEEN OFFICE
FP
FEMALE
REST RM
CHAPEL
FP
CHAPLAIN
STAIR - A
CONFERENCE RM
A/O
INTEGRATED
CARE
A/O
TO THE
DIRECTOR
HEALTH
SYSTEM
BENEFITS
A/O TO
CHIEF OF
STAFF
COPIER
ADMIN OFFICER
ASSOCIATE DIRECTOR
ASST
COS
ADMIN
DIRECTOR
CHIEF STAFF
TELEPHONE
SWITCH
BOARD /
IRM
CORRIDOR
ELEVATOR
CORRIDOR
TOILET
CHEMICAL STORAGE
MALE REST RM
FP
TOILET
ELEVATOR
FP
STAIR
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PHARMACY PATIENT COUNSELING
C&P
VACANT
C&P
VACANT
C&P
FILEROOM
C&P
EXAM
C&P
EXAMC&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
CORRIDOR
PATIENT
REPRESENTATIVE
DIRECTOR
PRIVACY
OFFICER
PATIENT
REPRESENTATIVE
DIRECTOR
CHIEF
VOLUNTARY
VOLUNTARY
SERVICE
NURSE
MANAGER
ASST TO
CHIEF
NURSING
NURSE
CHIEF
HEALTH
SYSTEM
BENEFITS
A/O
INTEGRATED
CARE
HK
AOD
EQUIPMENT
STORAGE
UC BED
UC BED
UC BED
ISOLATION
ROOM
AUDIOLOGISTAUDIOLOGY TECH
TELE- HEALTH
WAITING
AREA
VACANT
W A T E R
S U P P
LY
DISH
WOMANS
HEALTH
FEMALE
REST RM
MALE
REST RM
ROLLING SHUTTER
ROLL UP DOOR 10'2"
UP
WOMEN'S
D6 D6D6
D8
D8
D8 D8
D8
D8
D8
D11
D11 D11
D6
D6
D6
D22
D22
D8
D8
D8
D
D6
D
D 6
D
D 6
D
D 6
D
D
D 6
D8D8
D6 D6D6
D8
D8
D8 D8
D8
D8
D8
D11
D11 D11
D6
D6
D6
D22
D22
D8
D8
D8
D
D6
D
D 6
D
D 6
D
D 6
D
D
D 6
D8D8
ENTRANCE OPC
INFORMATION
1'-6 1_
RAMP
RAMP
RAMP
VCS
STORAGE
FP
DN UP
S
S
S S
S S
S
S
S S
S S
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
CA
DE
KB
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
A. SEE SHEETS AG001 FOR SYMBOLS AND
ABBREVIATIONS.
B. SEE CIVIL DRAWINGS FOR INFORMATION INCLUDING
CONCRETE SIDEWALKS, CONCRETE PADS. CIVIL
BACKGROUND DRAWING INFORMATION IS FOR
REFERENCE ONLY.
C. SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION & FRAMING DIMENSIONS. ALL
DIMENSIONS ARE FOR REFERENCE ONLY- VERIFY ALL
FRAMING WITH STRUCTURAL DRAWINGS.
D. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING
SYSTEM(S).
E. REFER TO MECHANICAL DRAWINGS FOR INFORMATION
CONCERNING HVAC SYSTEM(S).
F. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND COMMUNICATION
SYSTEM(S).
G. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
H. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
I. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
J. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
K. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND
OTHER SEPARATIONS TO BOTTOM OF ROOF/FLOOR
DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY) AND
TO EXTERIOR WALL. SEAL JOINT BETWEEN EDGES OF
PARTITION WITH FIRE RATED SEALANT AND/OR
INTUMESCENT ASSEMBLY.
L. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM AND
RATING REQUIRED.
M. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE TYPE
OF CONSTRUCTION BEING PENETRATED AND THE
FIRE/SMOKE RATING REQUIRED.
N. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-
LISTED FOR INSTALLATION IN THE ASSEMBLY OR SHALL
BE INSTALLED SUCH THAT THE FIRE-RATING IS NOT
COMPROMISED.
O. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF ALL APPLICABLE CODES. AREA
SHALL BE SEPARATED FROM THE REMAINDER OF THE
BUILDING BE CONSTRUCTION CAPABLE OF RESISTING
THE PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE OF THE
FLOOR OR ROOF ASSEMBLY ABOVE. DOORS SHALL BE
SELF OR AUTOMATIC CLOSING. DOORS SHALL NOT
HAVE AIR TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE PERMITTED
WITH ACCORDANCE TO NFPA 80.
P. STORAGE OF MATERIAL, INCLUDING FLAMMABLE OR
COMBUSTIBLE LIQUIDS IS UNDERSTOOD TO NOT BE
WITHIN THE BUILDING. STORAGE OF ANY MATERIAL IS
TO BE IN COMPLIANCE WITH ALL APPLICABLE CODES
AND AUTHORITIES HAVING JURISDICTION.
POLICE
CHECK
IN
WOMENS
LOCKER
4D
SECURITY
EQUIPMENT
ROOM
4I
OPERATIONS
4A
INTERVIEW
ARMORY
4E
HOLDING
4F
SHARED
OFFICE
1E
CORRIDOR
1A
STORAGE
1C
DEPUTY
CHIEF
1B
CHIEF
1D
EVIDENCE
4C
SECURITY
CONTROL
CENTER
4H
ELEVATOR
LOBBY
VESTIBULE
MAIN
LOBBY
MENS
LOCKER
4B
CORRIDORCORRIDOR
M A
T C
H L
IN
E
M A
T C
H L
IN
E
IT
ELEC
ELEC
CAPACITYCLR
EXIT
68" 340
GL102
Engineers Architects
Revisions: Date
Drawing Title
POC/COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JONATHAN SCHMIDT
CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
/1
/2
:1
:0
P
M C
U s e rs
\b n e e d h a m
\R e v it F ile B a c k u p s \A
-V A
B ig
S p ri n g R e n o v P o lic e b n e e d h a m
H L
.r v t
GL101
OVERALL FIRST FLOOR LIFE SAFETY
PLAN
5 6BN
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720 DECEMBER 13, 2024
100% CONSTRUCTION DOCUMENTS
519-17-80020-372-Q22
JAB
PROPOSED USE:
OWNED BY: FEDERAL GOVERNMENT
CODE ENFORCEMENT JURISDICTION: FEDERAL
GENERAL CODE INFORMATION:
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
SPRINKLERED
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
IB
HEALTH CARE
BUSINESS
Relevant Code Goes Here
RENOVATE POLICE AREA
GEORGE H. O'BRIEN, JR VAMC
300 WEST VETERANS BOULEVARD
BIG SPRING, TX 79720
WEST TEXAS VA HEALTH CARE SYSTEM
CODE INFORMATION
N O R
TH
0 2010 40
LIFE SAFETY LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
LIFE SAFETY GENERAL NOTES
NFPA 101 - CHAPTER 43
BUILDING REHABILITATION
43.1.1 CLASSIFICATION OF REHABILITATION WORK -
RENOVATION
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT
DOES NOT CHANGE OR ALTER EXISTING
OCCUPANT LOAD OR MEANS OF EGRESS. THE
EGRESS CAPACITY SHALL HAVE BEEN
PREVIOUSLY APPROVED AS BEING ADEQUATE.
THE DEAD END CORRIDOR DISTANCE HAS BEEN WAIVED
BY THE VA BASED ON THE EXISTING SYSTEM WIDE
EQUIVALENCY RULE FOR THIS STATION.
Scale: 1" = 20'-0"
FIRST FLOOR POLICE AREA LIFE SAFETY PLAN
IF SPACE REMAINS OCCUPIED DURING PHASING
ACTIVITIES, CONTRACTOR SHOULD ALWAYS
PROVIDE A SAFE MEANS OF EGRESS TO THE
NEAREST POINT OF EXITING
S
S
S S
S S
S
S
S S
S S
H
I
J
20 69…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .