Qlean Air Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25725R0052
About this file
These documents are architectural and mechanical design plans for the Central Texas Veterans Health Care facility in Temple, Texas, focusing on a pharmacy and cleanroom area. The area plan (AP1) shows a detailed floor layout spanning approximately 15,604 square feet, with various rooms including offices, storage areas, a pharmacy, break room, restrooms, and a dedicated cleanroom location. The schematic plan (A1) provides a more detailed view of the technical work areas, including hazardous sterile and drug storage compartments, an anteroom, and a sterile compounding space.
The mechanical notes (MN1 and MN2) outline extensive technical specifications, including power requirements for multiple fan filter units and LED ceiling panels, ranging from 170 watts at 120 volts to 36 watts for ceiling panels. The design includes precise mounting details for sinks, electrical outlets, and panels, with specific requirements for cleanroom construction such as phenolic panels, integral cove bases, and seamless flooring. The detailed drawings (MD1) show mechanical infrastructure like HVAC ductwork, return/exhaust air channels, and structural elements such as QAS trusses and aluminum wall panels, indicating a highly specialized medical facility design with rigorous environmental and technical standards.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q
S
T
U
V
W
X
Y
G
F
E
K
H
R L
J
94 SF
CHIEF OF
PHARMACY
94 SF
AO
93 SF
OFFICE
170 SF
CONFERENCE
RM.
30 SF
STOR.
103 SF
IDF
239 SF
BREAK
RM.
115 SF
OFFICE
103 SF
AO
109 SF
OFFICE
94 SF
OFFICE
130 SF
GROUP
OFFICE
144 SF
LOBBY
108A 108B
43 SF
ELECTRICAL
145 SF
MEN'S RR
144 SF
WOMEN'S
RR
56 SF
VESTIBULE
3735 SF
PHARMACY
105??
100 SF
OFFICE
103 107
MSD & E
PURCHASERS
BC104
IDF
BC103
HAC
BC105
ELECT.
RM.
BC106
Q2 Q2 A4
A3
A3A3
A3
A3
A3
A3 E3
E3 A3
A3
E3 A3
E3 E3
A3
E3
B3
A3
B3 B3
B3
B3 B3
C3
B3
UP
E3
E3
E3E3
Q2
E1 E1
A3
A3
A3 A3
A3
B3
B3 B3
A3
A3
A3
G3
86 SF
OFFICE
94 B3
B3
B3
A3
A3
E3
E3E3
A3
A-114 B2
A-114 E3
84 SF
RECEPT.
40 SF
HAC
878 SF
CORRIDOR
380 SF
VAULT
322 SF
RECEIVING
87 SF
STORAGE
23 SF
STOR.
100 SF
OFFICE
A4
C O
N N
EC
T-
R X
C
AR
O U
SE
L
,6
L
BS
PNEUMATIC
TUBE
SYSTEM
XR2
4 BAY
20,581 LBS
CART MODULE ACCESS
155 SF
COVID
WORK
ROOM
C O
N N
EC
T-
R X
C
AR
O U
SE
L
,6
L
BS
PHARMACY WORK AREA
4'
0"
25' - 0"
8' - 8"
6'
0"
7' - 2 3/4"
C O
N N
EC
T-
R X
C
AR
O U
SE
L
,6
L
BS
10' - 0"
TECH WORK AREA
N.T.S.
AREA PLANA
AP1
2212 CTV
AREA PLAN
CHIEF OF
TECH WORK AREA
1/4" = 1'-0"
SCHEMATIC PLAN1
AREA: 790.39 SQ. FT.
A1
SCHEMATIC PLAN
CHIEF OF
TECH WORK AREA
1/4" = 1'-0"
MECHANICAL NOTES1
MN1
2212 CTV
MECHANICAL NOTES
1/2"- 1'-0"
F.F.U. THIMBLE2
1 1/2" = 1'-0"
JUNCTION BOX MOUNT3
1/4" = 1'-0"
MECHANICAL NOTES MN2
2212 CTV
MECHANICAL NOTES
3/8" = 1'-0"
SINK MOUNT ELEVATION2
3/4" = 1'-0"
SINK MOUNT SECTION4
1 1/2" = 1'-0"
PANEL FLOOR DETAIL3
3/4" = 1'-0"
DETAILS1 MD1
DETAILS
File details come from the government source that posted it. Updated .