This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Department of Veterans Affairs project. Amendment 0003 for Solicitation Number 36C25725R0052 is dated 08-07-2025 and pertains to the Y1DA--Reconfigure Outpatient Rehab Medicine project (674-21-101) located at the Veterans Health Administration Veterans Integrated Service Network 17. The specific purpose of this amendment is to attach the Architect's Supplemental Instructions No. 1 (ASI), which includes drawings and specifications that were inadvertently omitted from the original solicitation. The amendment ensures all offerors have complete documentation for the project, with the attachment labeled ASI_01_COMPLETE_REV_01, and indicates that all other terms and conditions remain unchanged. The amendment was issued by Rhonda Richardson, Contracting Officer, from the Network Contracting Office located in Temple, TX.

View the file

Other files

File Type Posted
36C25725R0052 0005.docx DOCX document
36C25725R0052 0001.docx DOCX document
Qlean Air Drawings.pdf PDF
ATTACHEMNT K - CONTROLS SPEC.pdf PDF
36C25725R0052 0004.docx DOCX document
Contractor Site Visit Sign-In Sheet - Reconfigure Outpatient Rehab Medicine - 08.06.2025.pdf PDF
Consolidated Request for Information with responses.pdf PDF
ASI_01_COMPLETE_REV_01 003.pdf PDF
18708 Final Report Bldg 163.pdf PDF
36C25725R0052_2-Solicitation-Revision 1 8-7-25.docx DOCX document
36C25725R0052 0002.docx DOCX document
S02 36C25725R0052_2-Solicitation-Revision 1 8-7-25.docx DOCX document
S06 36C25725R0052 0002.docx DOCX document
S06 36C25725R0052 0001.docx DOCX document
S04 Contractor Site Visit Sign-In Sheet - Reconfigure Outpatient Rehab Medicine - 08.06.2025.pdf PDF
Attachment 8 Price Breakout.xlsx XLSX spreadsheet
Attachment 6 ASI 02 REV 02 REMOVE ALTERNATES.pdf PDF
Attachment 5 Specifications Volume 3-MEQ.pdf PDF
Attachment 2 Drawings.pdf PDF
Attachment 7 Wage Determination-Bell County.pdf PDF
Attachment 1 SOW Reconfigure Outpatient Rehab Medicine.pdf PDF
36C25725R0052_2.docx DOCX document
Attachment 4 Specifications Volume 2-MEP.pdf PDF
Attachment 3 Specifications Volume 1-Architecture.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08-07-2025

TBD

674-21-101

Department of Veterans Affairs Network Contracting Office NCO17

1901 Veterans Memorial Dr. Building #171 Temple TX 76504

Department of Veterans Affairs Network Contracting Office NCO17

1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders

36C25725R0052 07-25-2025

X x The purpose of this amendment is to attach the Architect's Supplemental Instructions No: 01 (ASI) to include drawings and specifications which were inadvertently omitted from the original solicitation.

All other terms and conditions remain unchanged.

Rhonda Richardson Contracting Officer

ATTACHMENTS

See attached document: ASI_01_COMPLETE_REV_01.

SOLICITATION-DESCRIPTION

Architect’s Supplemental Instruction (ASI) No. 1, which was unintentionally excluded from the initial solicitation.