S05 Vendor Questions-3-AE and VA Response.pdf

PDF 284 KB Posted

Attached to
Z2DZ--549-21-210 Correct Site Deficiencies Herzog MRCC Bldg.
Solicitation number
36C25723B0065
Issued by

About this file

This document contains questions and answers regarding Request for Information #3 for Invitation for Bid 36C25723B0065 to complete corrective work at a Department of Veterans Affairs facility in Big Spring, Texas. The questions and answers clarify that high-security fencing is not required, only high-security gates. Additionally, 24-gauge decking is confirmed as acceptable for the canopy roof, rather than the 20-gauge specified, as 24-gauge is the industrial standard and can be validated by the PEMB manufacturer's engineer.

View the file

Other files

File Type Posted
36C25723B0065 0011.docx DOCX document
36C25723B0065 0010.docx DOCX document
36C25723B0065 0009.docx DOCX document
36C25723B0065 0008.docx DOCX document
S05 Vendor Questions-2-AE and VA Response REVISED.pdf PDF
Attachment 5 549-21-210 Specifications Divisions 26 and 28.pdf PDF
36C25723B0065 0007.docx DOCX document
36C25723B0065 0006.docx DOCX document
36C25723B0065 0005.docx DOCX document
36C25723B0065 0004.docx DOCX document
Herzog Asbestos Documents.pdf PDF
36C25723B0065 0003.docx DOCX document
S05 Vendor Questions-2-AE and VA Response.pdf PDF
Attachment 1 SOW 549-21-210 11-29-23.pdf PDF
36C25723B0065 0002.docx DOCX document
S05 Vendor Questions-AE and VA Response.pdf PDF
S06 VADAHerzogLot-Geotechnical Report.pdf PDF
36C25723B0065 0001.docx DOCX document
S04 Pre-Bid Site Visit Sign In Sheet 10-6-23.pdf PDF
Attachment 3 549-21-210 Specifications.pdf PDF
Attachment 2 549-21-210 Drawings.pdf PDF
Attachment 1 SOW 549-21-210.pdf PDF
Attachment 4 Wage Determination Dallas County.pdf PDF
36C25723B0065_1.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information #3

Invitation For Bid 36C25723B0065

Project 549-21-210

1. Q: GC is required to provide allowance for commissioning of PIV and electrical work. Section 01

45 00-3.5 calls for "Section 01 91 00 General Commissioning Requirements included in the contract, ", and this section is not included in the project specs sent out.

A: Please see screenshot of paragraph. The reference states “When Section 01 91 00 General

Commissioning Requirements is included in the contract, …” The section is not included in the contract; therefore, the requirements do not apply.

2. Q: We have the question of the discrepancy between the note on CS104 and CS116 which both conflict with the note on ES101:

Please confirm that no high-security fencing will be in this SOW, only high-security gates.

A: High-security fencing is not in this SOW only the high-security gates.

3. Q: We have three (3) PEMB Manufacturers to tell us that 20-gauge is not available (or custom) for the roof panels. It is typically used as metal decking under elevated concrete slabs. For metal roof decking, 22-gauge and 24-gauge are available, and 26-gauge is standard. The Specifications delegate the design to a licensed manufacturer with a registered Engineer but in another

Section, the Specifications indicate a 20-gauge roof panel that would be custom. Can you please clarify?

A: Our architect researched and determined that the 24-gauge decking seems reasonable, and he also found that to be the industrial standard. Our recommendation would be for the contractor to use 24-gauge for the roof decking for the canopy. Of course, the engineer from the PEMB manufacturer will be responsible for validating the connects/supports/etc. for the canopy structure are as required to accommodate the 24-gauge deck. And the contractor will, of course, submit shop drawings of the canopy for VA approval before installation.