AMENDMENT 0003 DRAWING Addendum 67121144 7th Floor Roof Addendum No1.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25722B0041
About this file
This document is an amendment to drawings for a federal construction contract opportunity to replace the 7th floor roof of an Audie L. Murphy VA facility located in San Antonio, Texas. The amendment deletes a roof keynote, adds notes to details, and lightning protection lines on drawings AD1.0, A1.0, and A2.0. It also provides project information including the solicitation number 36C25722B0041 to replace the 7th floor roof at a cost of $6.1 million. The opportunity is a construction contract through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17, with bids due by October 28, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0041 A00003.docx | DOCX document | |
| AMENDMENT 0003 Roof Core Sample Photo.jpg | JPG image | |
| AMENDMENT 0003 05 117 7th Floor Roof Drawing Set.pdf | ||
| S06 - SIGN-IN SHEET - Repl. 7th Floor Roof - Site Visit.pdf | ||
| 36C25722B0041 A00002.docx | DOCX document | |
| 36C25722B0041 A00001.docx | DOCX document | |
| S02 - Specifications - 671-21-144-VA-SA-Replace 7th Floor Roof-100CD.pdf | ||
| P09 - StatementOfWork Final.pdf | ||
| 36C25722B0041_1.docx | DOCX document | |
| P07 - WAGE DETERMINATION - BEXAR COUNTY.pdf | ||
| S02 - Drawings - 671-21-144-VA-SA-Replace 7th Floor Roof-100CD.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELK Consortium + WestEast Design Group JV, LLC 2797 Valencia Lane Schertz, Texas 78154 M 940.642.9158
Addendum PROJECT Replace 7th Floor Roof
Audie L. Murphy 671-21-144
PROJECT No. WestEast Design Group, LLC:
21200
TO COR, Rodrick Thomas 7400 Merton Minter St., San Antonio, TX 78229
210.617.5300 EXT. 16554
ADD No. 001
ISSUE DATE 10/14/2022
ISSUED FOR: Bidding
VIA EMAIL
FROM Jon Quebe West East Design Group, LLC 200 E. Grayson Street, Suite 207 San Antonio, TX 78215 210.530.0755
This addendum shall be considered part of the Contract Documents and is issued to change or delete from or otherwise explain the drawings and specifications. Where provisions of this addendum differ from those of the original contract documents, this addendum shall have precedence over the original drawings and specifications and shall govern.
Bidders are hereby notified that they shall incorporate this addendum in their bids, and it shall be construed that the Contractor's Bid shall reflect with full knowledge, all items, changes and modifications to the contract documents herein specified. Bidders shall acknowledge receipt of this addendum in the space provided on the contractor’s bid form.
Description Delete roof keynote, add notes to details, and lightning protection lines.
DRAWINGS
1. AD1.0 (10-14-2022) – DEMOLITION ROOF PLAN
2. A1.0 (10-14-2022) – ROOF PLAN
3. A2.0 (10-14-2022) – ROOF DETAILS
END OF ADDENDUM No.1
10/14/2022
DEMOLITION ROOF PLANF1
N.I.C.
DEMOLITION LEGEND
GENERAL DEMOLITION NOTES
DEMOLITION KEY NOTES
N.I.C.N.I.C.
PENTHOUSE
PENTHOUSE
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT: 671 -21-144
Management
MAR. 29, 2022 6
100% CD SETCONSULTANTS:
Office of Facilities
JQ03/29/2022
Replace 7th Floor Roof I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Architectural Firm www.westeastdesign.com
ROOF PLANF1
LEGEND
GENERAL NOTES
KEY NOTES
N.I.C.
N.I.C.
N.I.C. PENTHOUSE
PENTHOUSE
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT: 671 -21-144
Management
MAR. 29, 2022 6
100% CD SETCONSULTANTS:
Office of Facilities
JQ03/29/2022
Replace 7th Floor Roof I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
ALUMINUM METAL FASCIA SECTIONB1 ALUMINUM METAL FASCIAB4
PENTHOUSE BASE FLASHINGD2 METAL WALL PANEL FLASHINGD4
VENT THRU ROOF DETAIL - TYPICALF2 TIE-IN ROOF DETAILF4
EQUIPMENT CURB DETAILB7
EQUIPMENT SUPPORT STAND LEG DETAILC7
PIPE SUPPORT DETAIL - TYPICALD7
ROOF DRAIN DETAILF7
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT: 671 -21-144
Management
MAR. 29, 2022 6
100% CD SETCONSULTANTS:
Office of Facilities
JQ
03/29/2022
Replace 7th Floor Roof I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
| 67121144-AD1.0 Demo Roof Plan-AD1.0.pdf |
| Sheets and Views |
| AD1.0 |
File details come from the government source that posted it. Updated .