AMENDMENT 0003 DRAWING Addendum 67121144 7th Floor Roof Addendum No1.pdf

PDF 1 MB Posted

Attached to
Z2DZ--671-21-144 Replace 7th Floor Roof - Construction
Solicitation number
36C25722B0041
Issued by

About this file

This document is an amendment to drawings for a federal construction contract opportunity to replace the 7th floor roof of an Audie L. Murphy VA facility located in San Antonio, Texas. The amendment deletes a roof keynote, adds notes to details, and lightning protection lines on drawings AD1.0, A1.0, and A2.0. It also provides project information including the solicitation number 36C25722B0041 to replace the 7th floor roof at a cost of $6.1 million. The opportunity is a construction contract through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17, with bids due by October 28, 2022.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELK Consortium + WestEast Design Group JV, LLC 2797 Valencia Lane Schertz, Texas 78154 M 940.642.9158

Addendum PROJECT Replace 7th Floor Roof

Audie L. Murphy 671-21-144

PROJECT No. WestEast Design Group, LLC:

21200

TO COR, Rodrick Thomas 7400 Merton Minter St., San Antonio, TX 78229

210.617.5300 EXT. 16554

ADD No. 001

ISSUE DATE 10/14/2022

ISSUED FOR: Bidding

VIA EMAIL

FROM Jon Quebe West East Design Group, LLC 200 E. Grayson Street, Suite 207 San Antonio, TX 78215 210.530.0755

This addendum shall be considered part of the Contract Documents and is issued to change or delete from or otherwise explain the drawings and specifications. Where provisions of this addendum differ from those of the original contract documents, this addendum shall have precedence over the original drawings and specifications and shall govern.

Bidders are hereby notified that they shall incorporate this addendum in their bids, and it shall be construed that the Contractor's Bid shall reflect with full knowledge, all items, changes and modifications to the contract documents herein specified. Bidders shall acknowledge receipt of this addendum in the space provided on the contractor’s bid form.

Description Delete roof keynote, add notes to details, and lightning protection lines.

DRAWINGS

1. AD1.0 (10-14-2022) – DEMOLITION ROOF PLAN

2. A1.0 (10-14-2022) – ROOF PLAN

3. A2.0 (10-14-2022) – ROOF DETAILS

END OF ADDENDUM No.1

10/14/2022

DEMOLITION ROOF PLANF1

N.I.C.

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

DEMOLITION KEY NOTES

N.I.C.N.I.C.

PENTHOUSE

PENTHOUSE

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-144

Management

MAR. 29, 2022 6

100% CD SETCONSULTANTS:

Office of Facilities

JQ03/29/2022

Replace 7th Floor Roof I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Architectural Firm www.westeastdesign.com

ROOF PLANF1

LEGEND

GENERAL NOTES

KEY NOTES

N.I.C.

N.I.C.

N.I.C. PENTHOUSE

PENTHOUSE

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-144

Management

MAR. 29, 2022 6

100% CD SETCONSULTANTS:

Office of Facilities

JQ03/29/2022

Replace 7th Floor Roof I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

ALUMINUM METAL FASCIA SECTIONB1 ALUMINUM METAL FASCIAB4

PENTHOUSE BASE FLASHINGD2 METAL WALL PANEL FLASHINGD4

VENT THRU ROOF DETAIL - TYPICALF2 TIE-IN ROOF DETAILF4

EQUIPMENT CURB DETAILB7

EQUIPMENT SUPPORT STAND LEG DETAILC7

PIPE SUPPORT DETAIL - TYPICALD7

ROOF DRAIN DETAILF7

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT: 671 -21-144

Management

MAR. 29, 2022 6

100% CD SETCONSULTANTS:

Office of Facilities

JQ

03/29/2022

Replace 7th Floor Roof I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

67121144-AD1.0 Demo Roof Plan-AD1.0.pdf
Sheets and Views
AD1.0

File details come from the government source that posted it. Updated .