This document package includes an amendment to a federal solicitation for roof replacement work at a Department of Veterans Affairs medical center, along with questions and answers from prospective offerors.
The amendment provides clarified roof plans, details revisions to keynotes and notes, and indicates lightning protection lines. It deletes one roof keynote and responds to contractor questions on topics such as existing roof conditions, hazard exhaust, crane usage, and bid procedures. The related solicitation seeks offers for a roof replacement project at the Audie L. Murphy VA Medical Center in San Antonio, Texas, with bids due on November 4, 2022. The work includes replacement of the 7th floor roof and options to replace roof curbs and parts of the lightning protection system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0003 Roof Core Sample Photo.jpg | JPG image | |
| AMENDMENT 0003 05 117 7th Floor Roof Drawing Set.pdf | ||
| AMENDMENT 0003 DRAWING Addendum 67121144 7th Floor Roof Addendum No1.pdf | ||
| 36C25722B0041 A00003.docx | DOCX document | |
| S06 - SIGN-IN SHEET - Repl. 7th Floor Roof - Site Visit.pdf | ||
| 36C25722B0041 A00001.docx | DOCX document | |
| S02 - Specifications - 671-21-144-VA-SA-Replace 7th Floor Roof-100CD.pdf | ||
| 36C25722B0041_1.docx | DOCX document | |
| P07 - WAGE DETERMINATION - BEXAR COUNTY.pdf | ||
| S02 - Drawings - 671-21-144-VA-SA-Replace 7th Floor Roof-100CD.pdf | ||
| P09 - StatementOfWork Final.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00002 Project 671-21-144 Network Contracting Offices, NCO17 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple
TX
76504 Network Contracting Office NCO17 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple
TX
76504 To all Offerors/Bidders
36C25722B0041 09-29-2022
X X
X one (1) AMENDMENT A00002 is hereby executed to address timely submitted RFI concerns. Please see attached clarifications and site visit, sign-in sheet.
GAILA P. LOWE
CONTRACTING OFFICER
CONTINUATION PAGE
PROJECT NAME: PROJECT #671-21-144 REPLACE 7th FLOOR ROOF, SAN ANTONIO, VAMC (RFIs DUE 10-14-22 by 4:00 P.M.)
SOLICITATION NUMBER: #36C25722B0041/36C257-22-B-0041
BIDs DUE: FRIDAY, NOVEMBER 4, 2022 @ 3:00 P.M., CST
36C25722B0041, REPLACE 7TH FLOOR ROOF, PROJECT 671-21-144; QUESTIONS #1 - #28, McGOLDRICK CONSTRUCTION:
1. Please provide as-built drawings of the existing roof including the architectural roof plan and cut sections. Response: See Attached is what we have available.
2. Is the slope of the roof built into the existing concrete to remain? If it is, is tapered insulation required? Response: Refer to as-builts
3. What is the existing to remain concrete elevation at: Response: Refer to as-builts
a. ridge line?
b. roof drain?
c. Edge of Roof?
d. Penthouse?
4. What is the thickness of the existing rigid insulation at: Response: Refer to as-builts
a. ridge line?
b. roof drain?
c. Edge of Roof?
d. Penthouse?
5. None of the provided roof details show tapered insulation but tapered is mentioned in keynote 1/A1.0. Is keynote 1 a typo? If tapered insulation is required, please clarify to all bidders by providing revised roof details by amendment (showing tapered insulation where applicable). Response: Not a typo. Detail F7/A2.0 indicates tapered insulation. Due to unknown existing tapering. Tapered insulation maybe required.
6. We understand that R8 is the total rigid insulation requirement for the new roof system per GN6/A1.0. Response: Where we have crickets and ridges then it will be more than R8 minimum.
7. Keynote 17/A1.0 Horizontal Fall Protection System is used in specific locations on the roof. The cable system is not shown. The identified post locations (KN17) and the locations of the existing penthouses preclude the use of cabling between all posts. If horizontal cabling is required, please provide a layout of where cabling is required and between which posts. Response: See amendment drawing, (refer to question #1).
8. Do the horizontal fall protection post base plates screw to the concrete deck? Please provide plan detail by amendment. Response: Use manufacturer’s standard details.
9. Will TB tests for each onsite worker be required for this project? Response: Yes At mechanical penthouse louvers, there were signs that read “Warning – Biohazard”, “Caution – Radiation Area”, and “Chemical Hazard”.
a. What type of biohazards, radiation and chemical hazards exist near the louvers of the mechanical penthouses? Response: This is old signage. Functions for the areas those exhaust servers have changed. There should be no hazard exhaust coming from these louvers, so it is currently believed at this time that those exhaust can be shut down when work is being performed in this immediate area.
b. Is working in the vicinity of these louvers safe? Response: Yes, see above.
c. Will VA turn off the biohazard/radiation/chemical generating equipment while construction workers are present on that side of the penthouse? Response: See above. We should be able to shut them down if need be.
10. If any biohazards, radiation, or chemical hazards exist with the roof top mounted exhaust fans, including the ones with very tall stacks labeled “Vector”, please indicate what the hazards are and if they are safe to work on by amendment. Response: This is Chemotherapy exhaust. Because of the tall stacks it should be safe to work on.
11. Alternate #2 scope of work includes survey and replacement of damaged parts of the lightning protection system up to and including the complete system. We understand that if the lightning protection system contractor determines that the complete system does not require replacement in Alternate #2, then only specific parts will be replaced. If this is not a correct understanding, please clarify to all by amendment. Response: That is correct, but the entire system will still need to be re-certified for the replaced parts as stated in Gen. Note #8.
12. If Alternate #2 is intended to include Lightning Protection work in Not in Contract (NIC) areas of roof, please clarify by amendment. Response: See Question #12 response
13. Will crane use be allowed during normal working hours during the week? Response: No, weekends only.
14. Can the dumpster be located at the loading dock? Can the dumpster location be identified by amendment? Response: A dumpster location in the loading dock area should not be an issue, however an exact location cannot be determined at this time.
15. Please confirm that roof exhaust fans requiring any repair to their curbs will be shut down during that period. Is there a maximum number of days for the outage and will the outage be performed during standard working hours or after hours? Response: If curb repairs are required, shutdowns will need to take place on the weekend when the service is closed. They cannot be shut down during the week.
16. We understand that wood blocking referred to in keynotes 3/AD1.0 and 3/A1.0 is existing wood blocking to remain. If this is not a correct understanding and new wood blocking is required at these specific locations, please clarify otherwise by amendment. Response: See amendment drawing. (refer to question #1).
17. Per the site visit, we understand that cranes can be set up in the loading dock area. Response: Yes, on the weekend only.
18. Is the existing light weight concrete over metal decking a structural light weight concrete or an insulating light weight concrete? Response: VA to provide existing test core analysis done on the adjacent roof work.
19. What is the psi of the existing light weight concrete? Response: VA to provide existing test core analysis done on the adjacent roof work.
20. We assume any repair of any encountered failed or failing lightweight concrete in metal deck will be handled as a differing site condition once demolition of the roof has been accomplished (if encountered). Response: Patch and repair will be negotiated.
21. General Note 5 on AD1.0 indicates to remove any rusted bolts and replace with galvanized bolts. What bolts might these be? Response: In general roof curb bolts at exhaust fans, lightning rods & cables, roof drains, and prefabricated metal stairs.
22. General note 2 on A1.0 indicates “In the event of a broken lighting cable, contractor is to bring it to the attention of the resident engineer before reinstallation of cable.” Please clarify what lighting cable is being referred to. Response: See Keynote #16 referenced Gen. Note #8 survey, replace damaged parts ALL 7th Floor roof lightning protection systems.
23. If a specific paint is required for painting of the red safety line, please provide specification or basis of design by amendment to all bidders. Response: See Section 09 91 00 Painting for basis of design product and submittal requirements.
24. If VA requires new roof curbs at the existing electrical disconnects, please clarify by amendment. Response: If the roof curbs are discovered to be rotted during the removal of old roofing system; then, they are to be replaced with new roof curbs. This will need to be reported to the VA.
25. Keynote 4/AD1.0 “Remove base flashing, cant, sealant and counterflashing” is shown in the Not in Contract Section of the roof. We understand this is a typo and the keynote should be located on the other side of the penthouse where the new roofing is required. If this is not a correct understanding, please clarify otherwise to all bidders by amendment.
Response: Keynote 4 has been deleted. See amendment drawing. (refer to question #1).
26. We request a copy of the site visit attendees list. VA Contracting: The sign-in sheet is provided with this amendment.
27. We request a telephone number or a zoom link by amendment so that contractors can participate in a traditional bid opening while maintaining COVID distancing procedures. This has been provided by other federal agencies and seems to work well.
VA Contracting: Contracting shall conduct submission of bids/offers, as indicated in the solicitation.
36C25722B0041, REPLACE 7TH FLOOR ROOF, PROJECT 671-21-144; QUESTIONS #1 - #28, 10/10/2022 @ 4:55 PM, CDT:
1. Add Alternate #1 states “REPLACE ROOF CURBS. REPLACE EXISTING ROOF CURBS WITH NEW CURBS WHERE DAMAGED, OR IN POOR CONDITION, OR HEIGHT BELOW MINIMUM CODE REQUIREMENTS.” What is the minimum roof curb height per code requirements? Response: Minimum is 8”.
1. What is the thickness of the existing lightweight concrete? Response: Refer to as-builts
1. 3M Fall Protection is one of the bases of design manufacturers for Section 11 81 29 Horizontal Fall Protection. 3M sales rep indicates they do not provide project specific shop drawings, certification of installation, and other specification requirements. The other manufacturer listed in the specs appears to meet much more of the requirements. Please clarify if 3M Fall Protection should be deleted from specification paragraph 2.1.A.1 as an acceptable manufacturer as they do not meet important specification requirements. Response: Use other acceptable manufacturer.
1. We request the deadline of questions be extended until a week after VA responses are provided to contractor questions as there are sometimes questions that arise from answers provided. VA Contracting: CO shall not extend any deadline for submission and response to timely submitted RFIs.
See attached document: S06 - SIGN-IN SHEET - Repl. 7th Floor Roof - Site Visit.
image1.emf
67121144-7th Floor Roof-Addendum No1.pdf
ELK Consortium + WestEast Design Group JV, LLC 2797 Valencia Lane Schertz, Texas 78154 M 940.642.9158
Addendum PROJECT Replace 7th Floor Roof
Audie L. Murphy 671-21-144
PROJECT No. WestEast Design Group, LLC:
21200
TO COR, Rodrick Thomas 7400 Merton Minter St., San Antonio, TX 78229
210.617.5300 EXT. 16554
ADD No. 001
ISSUE DATE 10/14/2022
ISSUED FOR: Bidding
VIA EMAIL
FROM Jon Quebe West East Design Group, LLC 200 E. Grayson Street, Suite 207 San Antonio, TX 78215 210.530.0755
This addendum shall be considered part of the Contract Documents and is issued to change or delete from or otherwise explain the drawings and specifications. Where provisions of this addendum differ from those of the original contract documents, this addendum shall have precedence over the original drawings and specifications and shall govern.
Bidders are hereby notified that they shall incorporate this addendum in their bids, and it shall be construed that the Contractor's Bid shall reflect with full knowledge, all items, changes and modifications to the contract documents herein specified. Bidders shall acknowledge receipt of this addendum in the space provided on the contractor’s bid form.
Description Delete roof keynote, add notes to details, and lightning protection lines.
DRAWINGS
1. AD1.0 (10-14-2022) – DEMOLITION ROOF PLAN
2. A1.0 (10-14-2022) – ROOF PLAN
3. A2.0 (10-14-2022) – ROOF DETAILS
END OF ADDENDUM No.1
10/14/2022
DEMOLITION ROOF PLANF1
N.I.C.
DEMOLITION LEGEND
GENERAL DEMOLITION NOTES
DEMOLITION KEY NOTES
N.I.C.N.I.C.
PENTHOUSE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT: 671 -21-144
Management
MAR. 29, 2022 6
100% CD SETCONSULTANTS:
Office of Facilities
JQ03/29/2022
Replace 7th Floor Roof I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Architectural Firm www.westeastdesign.com
ROOF PLANF1
LEGEND
GENERAL NOTES
KEY NOTES
N.I.C. PENTHOUSE
JQ03/29/2022
ALUMINUM METAL FASCIA SECTIONB1 ALUMINUM METAL FASCIAB4
PENTHOUSE BASE FLASHINGD2 METAL WALL PANEL FLASHINGD4
VENT THRU ROOF DETAIL - TYPICALF2 TIE-IN ROOF DETAILF4
EQUIPMENT CURB DETAILB7
EQUIPMENT SUPPORT STAND LEG DETAILC7
PIPE SUPPORT DETAIL - TYPICALD7
ROOF DRAIN DETAILF7
JQ
03/29/2022
67121144-AD1.0 Demo Roof Plan-AD1.0.pdf