SELF-PERFORMED CALCULATIONS.pdf
PDF 119 KB Posted
- Attached to
- Y1DA--549-19-190 Correct Electrical Deficiencies Phase I Federal contract opportunity
- Solicitation number
- 36C25722B0011
About this file
This document provides instructions for a federal solicitation seeking electrical upgrade services at a Veterans Affairs medical center in Dallas, Texas. The solicitation requires upgrading utility power and associated electrical systems to accommodate future projects, including adding circuit breakers and transformers, upgrading to a split bus configuration, and integrating a future generator. The selected contractor must provide all labor, materials, and equipment to complete upgrades shown in the drawings and specifications, including concrete pads and underground feeders. The contractor must also submit performance and payment bonds, proof of insurance, a project schedule, quality control and safety plans, operations and maintenance manuals, and conduct training. The period of performance is 365 calendar days with a three-year warranty. The solicitation specifies documentation, screening, and other COVID-19 requirements for contractor employees accessing VA facilities.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW
“Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________
c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)