P11 - Q_A Site Visit OR lights 9 July 2020 (002).docx

DOCX document 13 KB Posted

Attached to
6515--756-20-2-960-0201 OR LED Exam Lights
Solicitation number
36C25720Q0406
Issued by

About this file

This document contains a solicitation for surgical lights from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation seeks quotes for the purchase of 10 dual surgical LED lights, 10 surgical lights and visualization systems, and the removal and disposal of existing lights, as well as installation of the new lights, at various medical facilities. Responses are due by June 30, 2020 at 0800 AM Central Time and should be emailed to rolando.pasayan@va.gov. This is a set-aside solicitation for Service Disabled Veteran Owned Small Businesses with 500 employees or fewer. Brand name or equal items will be considered if they meet or exceed the capabilities of the listed equipment.

View the file

Other files

File Type Posted
P01 - OR LED Exam Light SOW rev 4 072120 (002).pdf PDF
36C25720Q0406 0007.docx DOCX document
JANS QUESTION 0721 (003).pdf PDF
36C25720Q0406 0006.docx DOCX document
P01 - OR LED Exam Light SOW rev 3 071320.doc DOC document
P11 - BLUE PRINT CEILING MOUNT.docx DOCX document
36C25720Q0406 0005.docx DOCX document
36C25720Q0406 0004.docx DOCX document
36C25720Q0406 0003.docx DOCX document
36C25720Q0406 0002.docx DOCX document
Question and Answers.pdf PDF
Photo 6.jpg JPG image
IMG_0094.jpg JPG image
IMG_0096.jpg JPG image
Photo 5.jpg JPG image
36C25720Q0406_2.pdf PDF
Photo 8.jpg JPG image
Photo 4.jpg JPG image
36C25720Q0406_3.docx DOCX document
Photo 9.jpg JPG image
Photo 10.jpg JPG image
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions/Concerns

1. Vendor requesting height of the ceiling. Room dimensions. Ceilings are 10ft and room dimensions are all different.

2. Is the extra light (non-Steris) going to be included? Yes

3. Is a re-wire going to be needed from panel to lights? No. There is existing wiring available.

4. Length of the “All Thread” from ceiling. The All Threads are 20” long ASTM A193 Class B7.

5. Will drywall need to be removed/worked on? No.

6. How many rooms will be planned to be worked in a day? At least 2 per day

File details come from the government source that posted it. Updated .