This document is Amendment 0001 to Solicitation 36C25626R0035, issued by the Department of Veterans Affairs Network Contracting Office 16 on April 28, 2026, for Project 580-23-108 B100 Sewer Replacement. The amendment provides clarifications to the original solicitation and is addressed to all offerors and bidders. The proposal due date and time remain unchanged.

The clarifications address 14 key questions regarding project scope and requirements. Notable clarifications include: no firestopping specifications will be provided as no firewall penetrations are expected; sanitary sewer piping replacement is limited to interstitial areas only; any wall or ceiling damage caused by the contractor during installation must be repaired; there is no asbestos in Building 100, but any hazardous materials encountered will be treated as differing site conditions requiring contract modifications; a superintendent may serve dual or triple roles covering Site Safety and Health Officer (SSHO) and Quality Assurance/Quality Control (QA/QC) requirements; the issued drawing set is confirmed as the latest and complete set meeting current VA Technical Information Letter guidelines; Past Performance Questionnaires (PPQs) are not required but if submitted will count toward page limits; the laydown yard will be located within the VA site with flexibility for contractor material storage in the interstitial; and replacement piping slopes shall follow International Plumbing Code (IPC) guidelines with minimum slopes of 1/4 inch per foot for pipes 2.5 inches or smaller, 1/8 inch per foot for pipes 3 to 6 inches, and 1/16 inch per foot for pipes 8 inches or larger.

View the file

Other files

File Type Posted
36C25626R0035 0002.pdf PDF
580-23-108 Sign In Sheet Sewer Lines.pdf PDF
36C25626R0035_1.docx DOCX document
580-23-108 Project Drawings.pdf PDF
580-23-108 Statement of Work.docx DOCX document
36C25626R0035_1.docx DOCX document
SF24 Bid Bond.pdf PDF
DOL Wage Determinations TX20260253 dated 1-2-26.pdf PDF
580-23-108 Project Specifications.pdf PDF
36C25626R0035.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0001 05-12-2026

580-23-108

Department of Veterans Affairs Network Contracting Office 16 5075 Westheimer Road, Suite 750

Houston TX 77056-5643

Department of Veterans Affairs Network Contracting Office 16 5075 Westheimer Road, Suite 750

Houston TX 77056-5643

To all Offerors/Bidders

36C25626R0035

04-28-2026

X

X X

X one (1)

RE: 580-23-108 B100 Sewer Replacement

Clarifications start on page 2. Proposal due date and time are unchanged.

Tabitha Contreras Contracting Officer

VA-VHA-2020-FB33BFA2

36C25626R0035 0001

Clarifications are as follows:

1. Question: Will specifications for firestopping be provided?

Answer: No, no penetrations through firewall expected.

2. Question: Is the replacement of the sanitary sewer piping limited to only the interstitial areas or will the repairs extend into any of the walls on the occupied floors?

Answer: Interstitial area only.

3. Question: Are wall or ceiling repairs expected as part of the installation of new sanitary sewer piping?

Answer: Any wall or ceiling that is damaged by the contractor during installation shall be repaired.

4. Question: If asbestos containing materials are encountered, please confirm that testing/remediation will be treated as a modification to the contract.

Answer: There is no asbestos in Building 100; however, if any hazardous material is found, it will be treated as a differing site condition and a contract modification would be negotiated.

5. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?

Answer: Yes

6. Question: If no to the question above, will the SSHO need to be full-time for this project?

Answer: N/A

7. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?

Answer: Yes

8. Question: If no to the question above, will the QA/QC need to be full time for this project?

Answer: N/A

9. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and

QA/QC?

Answer: Yes.

10. Question: Please confirm the issued drawing set is the latest and complete set.

Answer: Yes.

11. Question: Please confirm the current design documents meet current VA TIL guidelines.

Answer: Correct

12. Question: Past Performance: If we have a PPQ, requested for another opportunity, that is less than 12 months old, can we use it within our proposal? Or will a new PPQ need to be requested?

Answer: PPQs are not required to be submitted with your proposal. Should you choose to submit one, the page(s) will count towards your page limit.

36C25626R0035 0001

13. Question: Please clarify the location of the laydown yard.

Answer: Laydown yard will be within VA site, at this time there is no specific location. Contractor can also store materials being used in the interstitial.

14. Question: The project plans say replacement piping must match existing slope per VA design standards; however, existing slopes are not provided. Will the VA provide existing slope data?

Answer: Shall follow IPC slope guidelines

• Pipes 2 1/2 inches or smaller: minimum 1/4 inch per foot (about 2% slope).

• Pipes 3 inches to 6 inches: minimum 1/8 inch per foot (about 1% slope).

• Pipes 8 inches or larger: minimum 1/16 inch per foot (about 0.5% slope).