36C25625R0126 667-25-190 ISO Valves - Drawings.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--Project 667-25-190 Install Isolation Valves, B1 (Con) Federal contract opportunity
- Solicitation number
- 36C25625R0126
About this file
These are design drawings for a Veterans Affairs (VA) project to install isolation valves on the domestic water system at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves installing Class IV ICRA (Infection Control Risk Assessment) containment and isolation valves across multiple floors of Building 1, including the sub-basement, basement, second and third floors, eighth floor, and eighth and ninth floors. Additional requirements include abating asbestos piping at certain locations, performing air monitoring during abatement, reinstalling insulation, core drilling for new piping, and connecting new hot water return (HWR) piping. The project number is 667-25-190, and the drawings provide detailed floor plans, valve locations, and specific installation instructions for each floor level.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25625R0126 0002.docx | DOCX document | |
| RFI Register 667-25-190_Install Iso Valves 090225.docx | DOCX document | |
| 36C25625R0126 0001.docx | DOCX document | |
| Sign in Sheet 667-25-190.pdf | ||
| 36C25625R0126 667-25-190 BLDG 1 Asbestos Report.pdf | ||
| 36C25625R0126 667-25-190 ICRA - ISO Valves.pdf | ||
| 36C25625R0126 667-25-190 SOW 02102025 .doc | DOC document | |
| 36C25625R0126.docx | DOCX document | |
| 36C25625R0126 667-25-190 Combined Specs 02102025.pdf | ||
| 36C25625R0126 667-25-190 Class IV Precautions - ISO Valves .pdf | ||
| 36C25625R0126 EXHIBIT E.docx | DOCX document | |
| 36C25625R0126 EXHIBIT F.docx | DOCX document | |
| 36C25625R0126 EXHIBIT C.docx | DOCX document | |
| 36C25625R0126 EXHIBIT A.docx | DOCX document | |
| 36C25625R0125 WD LA20250031 070425.pdf | ||
| 36C25625R0126 EXHIBIT D.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
COVER SHEET
U.S. Department of Veterans Affairs
VETERANS
HEALTH
ADMINISTRATION
INSTALL ISOLATION VALVES ON DOMESTIC
WATER SYSTEM, B1
OVERTON BROOKS VA MEDICAL CENTER
SHREVEPORT, LA
SHEET NO. SHEET NAME
GENERAL
G-001 COVER SHEET
PLUMBING
P-001 SUB BASMENT
P-002 BASEMENT
P-003 SECOND AND THIRD FLOOR
P-004 EIGHTH FLOOR
P-005 EIGHTH AND NINTH FLOOR
G-001
S -B
-1 A
S-B-7
S
TA
IR
S -B
-6
ENG.SVC
ST
O
RA
GE
S-B-4
S-B-5
S-B-4A
EQUIPMENT ROOM
EM
S ENG.SVC
ENG.SVC
DIRTY L
INEN
STORAGE
FUEL TANK
CONTROL PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
1. Install isolation valves at designated locations.
2. Reinsulate all piping insulation removed for new work.
3. Cleanup and provide supervision.
SUB BASEMENT
P-001
AutoCAD SHX Text
22-SUB-2
AutoCAD SHX Text
21-SUB-1
AutoCAD SHX Text
25-SUB-5
AutoCAD SHX Text
26-SUB-6
AutoCAD SHX Text
23-SUB-3
AutoCAD SHX Text
24-SUB-4
AutoCAD SHX Text
SUB BASEMENT - KEY NOTES
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 S-B-4
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-001
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 S-B-7
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-001
AutoCAD SHX Text
25-SUB-5
AutoCAD SHX Text
25-SUB-6
AutoCAD SHX Text
24-SUB-4
AutoCAD SHX Text
23-SUB-3
AutoCAD SHX Text
21-SUB-1
AutoCAD SHX Text
22-SUB-2
B-N-6
B-N-9A
B-N-17
B- N-
B-N-40
B -N
-2
B -N
-3 5B-N-20
C D
E F
B-N-16
NFS
EMS
ENG
NFSNFS
B-N-8
EMS
PHARMACY STORAGE
B-N-34
B -W
-2
SPD
B-E-27
B-E-27B
27C
B-E-32
30A
A
OFFICE
OFFICE
3SPD
SPD
SPD
17F
17G
BE23A
ENG.
ENG.
BE-24
ENG.
SPD
A/H UNIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
BASEMENT
1. Install Class IV ICRA containment in each valve location.
2. Abate asbestos piping necessary for valve installation (40 linear feet).
3. Perform air monitoring during abatement.
4. Install isolation valves at designated locations.
5. Reinsulate all abated piping (40 linear feet).
6. Cut up to 46” x 46” wall openings (128 sq. ft., a mix of drywall and plaster)
7. Patch wall openings and install up to 24” x 24” access panels (128 sq. ft.).
8. Cleanup and provide supervision.
1. Install Class IV ICRA containment in each valve location.
2. Abate asbestos piping necessary for valve installation (10 linear feet in BN8).
3. Perform air monitoring during abatement.
4. Install isolation valves at designated locations.
5. Reinsulate all piping insulation removed for new work.
6. Cleanup and provide supervision.
P-002
AutoCAD SHX Text
1-BN16-1
AutoCAD SHX Text
2-BN20-1
AutoCAD SHX Text
3-BN8-1
AutoCAD SHX Text
4-BN8-2
AutoCAD SHX Text
20-BE27-2
AutoCAD SHX Text
19-BE27-1
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 BE27
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-002
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 BASEMENT NORTH
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-002
AutoCAD SHX Text
BE27 - KEY NOTES
AutoCAD SHX Text
BN16, BN20, AND BN8 - KEY NOTES
AutoCAD SHX Text
1-BN16-1
AutoCAD SHX Text
2-BN20-1
AutoCAD SHX Text
20-BE27-2
19-BE27-1
3-W-72
3-W-71A
ENG
ENG
EMS
3-W-77
ELEVATOR
LOBBY
3-W-10
ELEV. ELEV. ELEV.
3-E-34
3W17A3W68ROOF
3W70
2-W-29
2-W-31
-W
-3
2-W-40
2-W-39
S
TA
IR
35 6
3 2 1
HOOD
HOOD
37A
2-W-37C
40A
40B
2-W-29A
C A N
TE
EN
S
V C
CANTEEN SVC.
ENG. ENG.
KITCHEN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
SECOND AND THIRD FLOOR
1. Install Class IV ICRA containment in each valve location.
2. Install isolation valves at designated locations.
3. Reinsulate all piping insulation removed for new work.
4. Cleanup and provide supervision.
P-003
AutoCAD SHX Text
1" HW
AutoCAD SHX Text
3/4" CW,HW
AutoCAD SHX Text
1" CW
AutoCAD SHX Text 16-3W70-1
AutoCAD SHX Text 18-3W70-3
AutoCAD SHX Text 17-3W70-2
AutoCAD SHX Text 27-2W29-1
AutoCAD SHX Text
3/4" HW
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 3W70
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-003
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 2W29
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-003
AutoCAD SHX Text
2ND AND 3RD FLOOR - KEY NOTES
AutoCAD SHX Text 16-3W70-1
AutoCAD SHX Text 18-3W70-3
17-3W70-2
8-W-57
8-W-60 8-W-58
-W
-5
8-E-33 8-E-1 8-E-2
8-E-31 8-E-30
8-N-18
8-N-12
8-N-14
8-N-16
8-N-15
3 2 1
S
TA
IR
35 6
8 9 10
58A
60E
60D
60C 60B 60A
2A 3A
8-E-500
8-E-500A
8-W-4
8-W-1
A
B
C
618W
ENG
ENG
ENG
M
ED
IC
A L
S
ER
V
IC
E
MED. SVC.
MED. SVC.
MED. SVC.
MED. SVC.
OFFICE
OFFICE
OFFICES
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MED. SVC.
O
FF
IC
E
O
FF
IC
E
A
8W21
8W22
8W2021A
8W23 23A 8W24
20A
24A 8W25
19A 8W19
BED
BED
BED
BED
8W11
8W10A 8W9A
10B 9B
8W8
8-W-738
BED
BED BED
STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
EIGHTH FLOOR
1. Install Class IV ICRA containment in each valve location.
2. Install isolation valves at designated locations.
3. Cleanup and provide supervision.
1. Install Class IV ICRA containment in each valve location.
2. Install isolation valves at designated locations.
3. Remove existing HW piping at each point of connection (POC).
Install new piping and reinsulated.
4. Cleanup and provide supervision.
P-004
AutoCAD SHX Text 5-8Central-1
AutoCAD SHX Text 6-8Central-2
AutoCAD SHX Text 7-8Central-3
AutoCAD SHX Text 8-8Central-4
AutoCAD SHX Text 14-8W59-4
AutoCAD SHX Text 15-8N1-1
AutoCAD SHX Text
2 1/2" CW,HW
AutoCAD SHX Text
2 1/2" CW,HW
AutoCAD SHX Text 8W59-1
AutoCAD SHX Text 8W59-2
AutoCAD SHX Text 8W59-3
AutoCAD SHX Text 8W59-6
AutoCAD SHX Text 8W59-7
AutoCAD SHX Text 8W59-5
AutoCAD SHX Text 8W59-4
AutoCAD SHX Text 8W59-8
AutoCAD SHX Text
2 1/2" CW,HW
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
2 1/2" CW,HW
AutoCAD SHX Text 11-8W59-1
AutoCAD SHX Text 12-8W59-2
AutoCAD SHX Text 13-8W59-3
AutoCAD SHX Text 14-8W59-4
AutoCAD SHX Text E
AutoCAD SHX Text
3" CW 2 1/2" HW
AutoCAD SHX Text 9-8W22-1
AutoCAD SHX Text 10-8W22-2
AutoCAD SHX Text
1/2" CW,HW
AutoCAD SHX Text
1/2" CW,HW
AutoCAD SHX Text
2 1/2" CW
AutoCAD SHX Text
1 1/2" HW
AutoCAD SHX Text 25'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8WEST
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-004
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8W59
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-004
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8W59
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-004
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8W22
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-004
AutoCAD SHX Text
EIGHTH FLOOR - KEY NOTES
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8W10
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-004
AutoCAD SHX Text
8W10 - KEY NOTES
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8W59
AutoCAD SHX Text
NTS
AutoCAD SHX Text
P-004
9E-17 9E-15 9E-16A
9E-16 9E-15A
FEDF
9E-11 9E-12 9E-13
9E-14
BED BED
BEDBED
8-E-20
20A 20B
20C
20E 20D
OFFICE
MEDICAL
OFFICE
OFFICE
OFFICE
CHIEF
SVC.
OFFICE
OFFICE
20C-1
20C-2
AO/MED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-190
BLDG 1 - MAIN HOSPITAL
Install Isolation Valves on Domestic Water System, B1
JM
EIGHTH AND NINTH FLOOR
1. Install Class IV ICRA containment in each valve location.
2. Abate asbestos piping necessary for valve installation (above 8E ceiling) 20 feet.
3. Install isolation valves at designated locations.
4. Install new HWR piping from POC to new core drill location.
5. Core drill at this location to provide new 3/4'' copper tubing, type K pipe riser to 8th floor.
6. Install and connect new HWR piping on 8th. Tie-in new piping to existing horizontal run.
7. Cleanup and provide supervision.
P-005
AutoCAD SHX Text 27-8Central-5
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 9EAST NEW WORK
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-005
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 8EAST NEW WORK
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text P-005
8East and 9East - KEY NOTES
| Sheets and Views |
| Iso Valve - Project-General |
| Iso Valve - Project-S-B |
| Iso Valve - Project-BASEMENT |
| Iso Valve - Project-2ND AND 3RD |
| Iso Valve - Project-EIGHTH |
| Iso Valve - Project-NINTH |
File details come from the government source that posted it. Updated .