This document is an Infection Prevention & Control Class IV Precautions document for the Overton Brooks VA Medical Center, specifically detailing minimum required infection control precautions for installing isolation valves on the domestic water system in Building 1, dated February 6, 2025. The document provides comprehensive, detailed guidelines for construction work in a medical facility, focusing on preventing dust and contaminant spread during and after construction activities. Key requirements include constructing NFPA 241 compliant barriers, maintaining negative air pressure, using HEPA filtration, containing construction waste, managing worker clothing and shoe covers, and implementing strict cleaning protocols before, during, and after work completion. The precautions emphasize controlling dust, monitoring air quality, and ensuring no contamination enters occupied medical spaces during the installation of isolation valves.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project 667-25-190 Install Isolation Valves, B1 (Con), newest first.
File Type Posted
36C25625R0126 0002.docx DOCX document
RFI Register 667-25-190_Install Iso Valves 090225.docx DOCX document
Sign in Sheet 667-25-190.pdf PDF
36C25625R0126 0001.docx DOCX document
36C25625R0126 667-25-190 Combined Specs 02102025.pdf PDF
36C25625R0126 EXHIBIT E.docx DOCX document
36C25625R0126 EXHIBIT F.docx DOCX document
36C25625R0126 EXHIBIT C.docx DOCX document
36C25625R0126 EXHIBIT A.docx DOCX document
36C25625R0126 667-25-190 BLDG 1 Asbestos Report.pdf PDF
36C25625R0126 667-25-190 ICRA - ISO Valves.pdf PDF
36C25625R0126 667-25-190 SOW 02102025 .doc DOC document
36C25625R0126.docx DOCX document
36C25625R0126 667-25-190 ISO Valves - Drawings.pdf PDF
36C25625R0125 WD LA20250031 070425.pdf PDF
36C25625R0126 EXHIBIT D.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VA Medical Center Infection Prevention & Control Class IV Precautions

Minimum Required Infection Control Precautions Required for Install Isolation Valves on Domestic Water System Building 1

Date: February 6, 2025

C L

A S

S I V

P R

E C

A U

T

IO

N S

Before and During Work Upon Completion

1. Construct NFPA 241 compliant barriers extending to the ceiling or if ceiling tile is removed, to the deck above.

2. Perform plastic/hard barrier construction with minimal dust release. Affix plastic barriers without gaps to the floor, walls, & ceiling using tape that will not leave a residue.

3. Seal all penetrations in barriers, including floors and ceiling, using approved materials (i.e., UL schedule firestop).

4. Containment units/environmental containment units (ECUs) with HEPA filtered exhaust are approved for Class IV precautions in small areas that can be totally contained.

5. Remove/isolate return air diffusers.

6. Remove/isolate supply air diffusers to prevent positive pressure of the space.

7. Maintain negative pressure and airflow for the area:

A. Airflow from entry → anteroom → construction area.

B. HEPA filter outdoor exhaust UNLESS the exhaust is >25 feet from entrances, air intakes, or open windows then HEPA filtration of exhaust is not required.

C. HEPA filter indoor exhaust AND prior to start of work, conduct particulate measurement to verify > 99.97% efficiency and confirm no change of airflow/pressure relationships in adjacent areas.

D. DO NOT exhaust into shared or recirculating HVAC systems, or other systems (e.g., bathroom exhaust).

E. Install device (e.g., magnehelic, manometer, or digital monitoring) outside the work site to continually monitor negative pressure. DO NOT use “ball in the wall” or similar apparatus.

8. Construction Waste:

A. Contain all trash and debris in the work area.

B. Transport container should be nonporous/smooth, cleanable and have a hard lid.

C. Containers must be damp-wiped clean and free of visible dust/debris before leaving the work area.

D. Use the designated route to the outside waste area.

E. If an exterior debris/trash chute is used, the receptacle must be covered to minimize dust generation. Cover any air intakes <25 feet from the chute or receptacle.

1. Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

2. Work Area Cleaning:

A. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

B. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

3. Removal of Critical Barriers:

A. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

B. All (plastic or hard) barrier removal activities below must be completed in a manner that prevents dust release.

1) Remove screws & painter tape.

Use hand-held HEPA vacuum if there is dust.

2) No drywall cutting during removal process.

3) Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

4) Erect a plastic barrier if dust could be generated.

4. Negative Air Requirements:

A. The use of negative air must be designed to remove contaminates from the work area.

B. Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

Overton Brooks VA Medical Center Infection Prevention & Control Class IV Precautions

9. Install a sticky (dust collection) mat at the entrance of the work area. Change mat routinely and when visibly soiled.

10. Worker activities and clothing:

A. Clothing must be clean and visibly dust free before leaving the work area. HEPA vacuuming or use of cover suites is acceptable.

B. Shoe covers are required when entering the work area, changed prior to exiting the anteroom into the non-work area, and change damaged shoe covers immediately.

11. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

5. HVAC systems:

A. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

B. Verify that HVAC systems are clean and operational.

C. Verify the HVAC systems meets original airflow and air exchange design specifications.