36C25625R0108 ICRA - Fisher House.pdf
PDF 155 KB Posted
- Solicitation number
- 36C25625R0108
About this file
This document is an Infection Prevention & Control (ICRA) matrix for a Site Preparation project at the Overton Brooks VA Medical Center for the Fisher House, dated 05/23/2025. The document provides a comprehensive framework for managing construction and renovation activities across four risk types (Type A-D) and four patient risk groups (Low, Medium, High, Highest Risk).
The matrix details specific precautionary classes based on the construction project type and patient risk group, with detailed guidelines for different levels of invasive work. For this specific project, the construction type is classified as Type C (large-scale, long-duration activities with moderate dust and debris), and the risk group is identified as Low Risk, resulting in a Class II Precaution level. The document is digitally signed by Carol Phillips and is associated with VA solicitation number 36C25625R0108 for Fisher House Site Prep Construction, involving the Veterans Health Administration's Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25625R0108 0002.docx | DOCX document | |
| 36C25625R0108 RFI Registrar 667-23-113 081425.pdf | ||
| 36C25625R0108 0001.docx | DOCX document | |
| 36C25625R0108 Sign in Sheet 667-23-113.pdf | ||
| 36C25625R0108 Combined Drawings.pdf | ||
| 36C25625R0108 EXHIBIT F.docx | DOCX document | |
| 36C25625R0108 EXHIBIT B.docx | DOCX document | |
| 36C25625R0108 EXHIBIT A.docx | DOCX document | |
| 36C25625R0108.docx | DOCX document | |
| 36C25625R0108 WD LA20250031 022825.pdf | ||
| 36C25625R0108 SPECIFICATIONS FISHER HOUSE OVERTON BROOKS VAMC 6-26-2025.pdf | ||
| 36C25625R0108 EXHIBIT E.docx | DOCX document | |
| 36C25625R0108 EXHIBIT D.docx | DOCX document | |
| 36C25625R0108 EXHIBIT C.docx | DOCX document | |
| 36C25625R0108 SOW - Fisher House 062325.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VA Medical Center
Infection Prevention & Control
Project: Site Prep for Fisher House Date: 05/23/2025
Type A
Inspection and non-invasive activities. Includes but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile/50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type B
Small-scale, short duration activities; minimal dust and debris. Includes but not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection/repair of firewalls and barriers, install conduit/cabling, & access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Type C
Large-scale, long duration activities; moderate amount of dust and debris. Includes but not limited to:
• Removal of preexisting floor covering, walls, casework, or other building components.
• New drywall placement.
• Renovation work in a single room.
• Non-existing cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Type D
Major demolition and construction activities. Includes but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Step Two: Circle the Risk Group(s) affected. Select the higher group, when more than one group will be affected.
Low Risk* Medium Risk High Risk Highest Risk
*Not in patient care areas
• Public hallways & gathering areas
• Office areas
• Breakrooms
• Bathrooms or locker rooms
• Mechanical rooms
• EMS closets
• Waiting areas
• Clinical engineering
• Materials management.
• SPS Decon area
• Kitchen, cafeteria, gift shop, coffee shop, food kiosks.
• Patient care rooms/clinics
• All acute inpatient units
• Emergency department
• Occupation Health
• Pharmacy general areas
• Medication, clean utility & sterile supply rooms
• Imaging/diagnostic suites
• Laboratory.
• All transplant & ICUs
• All oncology units.
• OR suites & restricted areas.
• Procedural suites.
• Pharmacy compounding areas
• SPS: Prep and HLD areas
• Transfusion services.
• Dedicated isolation wards/units.
• Invasive imaging suites:
Step Three: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk.
Construction Project Type
Patient Risk Group Type A Type B Type C Type D
IC
M a tr ix LOW Risk Group1 I II II III
MEDIUM Risk Group1 I II III2 IV2
HIGH Risk Group1 I III IV2 V2
HIGHEST Risk Group1 III IV2 V2 V2
1. Amend as follows for environmental conditions that could affect human health (i.e., sewage, mold, asbestos, gray water, and black water). Class IV Precautions for LOW and MEDIUM Risk Groups and Class V Precautions for HIGH and HIGHEST Risk Groups.
2. Infection Control documents required for Class III Precautions in Type C projects and all Class IV & V Precautions.
| 2025-05-28T10:00:22-0500 | |
| CAROL PHILLIPS |
File details come from the government source that posted it. Updated .