36C25625R0108.docx
DOCX document 138 KB Posted
- Solicitation number
- 36C25625R0108
About this file
This is a Request for Proposals (RFP) for site preparation construction for a Fisher House at the Overton Brooks VA Medical Center. The procurement is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated project value between $1,000,000 and $2,000,000, specifically for Project #667-23-113 located in Caddo Parish, Louisiana.
Key details include a 270-calendar day performance period, with contractors required to begin work within 10 days of receiving the notice to proceed. Offerors must be registered and certified as an SDVOSB in the SBA Dynamic Small Business Search site, with a mandatory site visit scheduled for 07/31/25 at 9AM CST. Proposals are due by 08/25/2025 at 2:00 PM CDT, and the solicitation emphasizes strict compliance with subcontracting limitations, with specific requirements that no more than 75% of the contract amount can be paid to non-SDVOSB firms for special trade construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25625R0108 0002.docx | DOCX document | |
| 36C25625R0108 RFI Registrar 667-23-113 081425.pdf | ||
| 36C25625R0108 0001.docx | DOCX document | |
| 36C25625R0108 Sign in Sheet 667-23-113.pdf | ||
| 36C25625R0108 Combined Drawings.pdf | ||
| 36C25625R0108 ICRA - Fisher House.pdf | ||
| 36C25625R0108 EXHIBIT F.docx | DOCX document | |
| 36C25625R0108 EXHIBIT B.docx | DOCX document | |
| 36C25625R0108 EXHIBIT A.docx | DOCX document | |
| 36C25625R0108 EXHIBIT C.docx | DOCX document | |
| 36C25625R0108 WD LA20250031 022825.pdf | ||
| 36C25625R0108 SPECIFICATIONS FISHER HOUSE OVERTON BROOKS VAMC 6-26-2025.pdf | ||
| 36C25625R0108 EXHIBIT E.docx | DOCX document | |
| 36C25625R0108 EXHIBIT D.docx | DOCX document | |
| 36C25625R0108 SOW - Fisher House 062325.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5.
REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL
SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25625R0108 X 07-24-2025
TBD
667-25-3-1461-0469 667-23-113 00520 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 Alexis Meyers 228-523-5000X38663 This procurement is a total Service Disabled Veteran Owned Small Business (SDVOSB) set-aside under Public Law 109-461.
Offerors must be registered and certified as a SDVOSB in the SBA Dynamic Small Business Search (DSBS) site at https://dsbs.sba.gov/search/. Proposals received from contractors who are not certified as a SDVOSB at the SBA site shall not be considered for evaluation and award. This includes Joint Ventures. Joint Venture Agreements must be submitted with proposal to be considered. Contract award shall not be delayed due to loss of SDVOSB certification.
Verification showing seal shall be included with proposal (pricing volume).
SEE BLOCK 13A FOR SOLICITATION CLOSING DATE.
BASE OFFER ITEM: FURNISH ALL LABOR, TOOLS, MATERIALS, EQUIPMENT AND SUPERVISION NECESSARY TO PERFORM ALL WORK
ASSOCIATED WITH PROJECT 667-23-113; SITE PREP FOR FISHER HOUSE LOCATED AT
THE O
verton Brooks VA Medical Center
VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award.
PER VAAR 836.204 THE ESTIMATED MAGNITUDE OF THIS PROJECT ISBETWEEN $1,000,000 AND $2,000,000
IN NEGOTIATED SOLICITATIONS “BID” AND “BIDDER” MEAN “OFFER”AND “OFFEROR”
NAICS CODE: 238910 SIZE STANDARD: $19M
GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED:
CADDO PARISH
, LA.
SITE VISIT: AN ORGANIZED SITE VISIT WILL BE HELD AT THE DATE/TIME/LOCATION SHOWN IN FAR 52.236-27 SITE VISIT.
(CONSTRUCTION) ALTERNATE I. THIS WILL BE THE ONLY SITE VISIT CONDUCTED FOR THIS PROCUREMENT.
INFORMATION PROVIDED AT THE SITE VISIT SHALL NOT ALTER THE TERMS AND CONDITIONS OF THE SOLICITATION. TERMS OF THE SOLICITATION REMAIN UNCHANGED UNLESS THE SOLICITATION IS AMENDED IN WRITING. CONTRACTORS ARE REQUIRED TO SUBMIT ALL QUESTIONS IN WRITING, USING EXHIBIT F, (EMAIL IS ACCEPTABLE) TO THE CONTRACT SPECIALIST SHOWN ABOVE NO LATER
THAN
NOON CT 14 CALENDAR DAYS PRIOR TO THE DATE/TIME SET FOR RECEIPT OF PROPOSALS.
This project is not tax exempt.
X X 52.211-10 X One (1) Email 14:00
CDT
08-25-2025 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b.
SIGNATURE
20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c U.S.C. 8127 (d
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Please see Schedule of Offer Items & Continuation of SF 1442 (Divisions) located in sections A.3 and A.4 X Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 invoice must be submitted electronically 1-877-489-6135 X JB Herbst VA-VHA-RPOC-2023-0125 Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 6 |
| ITEM INFORMATION | 6 |
| A.4 CONTINUATION OF SF 1442 BLOCK # 17 | 7 |
| A.5 GENERAL PROPOSAL INFORMATION | 8 |
| A.6 Proposal Preparation | 11 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 18 |
| 2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 18 |
| 2.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 18 |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 18 |
| 2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 19 |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 20 |
| 2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 20 |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 21 |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 21 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 21 |
| 2.10 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 22 |
| 2.11 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020) | 22 |
| 2.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 23 |
| 2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 24 |
| 2.14 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 25 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025) | 25 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 29 |
| 3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 31 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 33 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 34 |
| GENERAL CONDITIONS | 37 |
| 4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 37 |
| 4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 37 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 39 |
| 4.4 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 42 |
| 4.5 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALTERNATE I (DEC 2007) | 47 |
| 4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 47 |
| 4.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 48 |
| 4.8 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 51 |
| 4.9 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 51 |
| 4.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 51 |
| 4.11 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 52 |
| 4.12 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 52 |
| 4.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 52 |
| 4.14 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 55 |
| 4.15 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 57 |
| 4.16 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 57 |
| 4.17 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 58 |
| 4.18 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 59 |
| 4.19 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 59 |
| 4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 62 |
| 4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 63 |
| 4.22 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 64 |
| 4.23 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 64 |
| 4.24 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 65 |
| 4.25 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 66 |
| 4.26 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 66 |
| 4.27 Contractor Performance Assessment Reporting System (CPARS) | 68 |
| 5.0 List of Attachments | 69 |
| See attached document: 36C25625R0108 EXHIBIT A. | 69 |
| See attached document: 36C25625R0108 EXHIBIT B. | 69 |
| See attached document: 36C25625R0108 EXHIBIT C. | 69 |
| See attached document: 36C25625R0108 EXHIBIT D. | 69 |
| See attached document: 36C25625R0108 EXHIBIT E. | 69 |
| See attached document: 36C25625R0108 EXHIBIT F. | 69 |
| See attached document: 36C25625R0108 SOW - Fisher House 062325. | 69 |
| See attached document: 36C25625R0108 SPECIFICATIONS FISHER HOUSE OVERTON BROOKS VAMC 6-26-2025. | 69 |
| See attached document: 36C25625R0108 ICRA - Fisher House. | 69 |
| See attached document: 36C25625R0108 WD LA20250031 022825. | 69 |
| See attached document: 36C25625R0108 Combined Drawings. | 69 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
The Base Offer for CLIN 0001 includes all labor, tools, materials, equipment and supervision necessary to complete the Site Prep for Fisher House; #667-23-113.
PRINCIPAL NAICS CODE: 238910 – Site Preparation Contractors PRODUCT/SERVICE CODE: Y1NZ : Construction of Other Utilities
| GRAND TOTAL |
| __________________ |
A.4 CONTINUATION OF SF 1442 BLOCK # 17
Offerors must complete the divisional breakdown provided below and provide enough detail in their price proposals to allow the government to review and make an informed decision, ensuring the prices are fair and reasonable. The price proposals should include detailed pricing that makes up the entire division price.
| MATERIAL |
| LABOR |
| EQUIPMENT |
| TOTAL |
| DIVISION 01: |
| GENERAL REQUIREMENTS |
| DIVISION 02: |
| EXISTING CONDITIONS |
| DIVISION 03: |
| CONCRETE |
| DIVISION 04: |
| MASONRY |
| DIVISION 05: |
| METALS |
| DIVISION 06: |
| WOOD, PLASTICS & COMPOSITES |
| DIVISION 07: |
| THERMAL & MOISTURE PROTECTION |
| DIVISION 08: |
| OPENINGS |
| DIVISION 09: |
| FINISHES |
| DIVISION 10: |
| SPECIALTIES |
| DIVISION 11: |
| EQUIPMENT |
| DIVISION 12: |
| FURNISHINGS |
| DIVISION 13: |
| SPECIAL CONSTRUCTION |
| DIVISION 14: |
| CONVEYING EQUIPMENT |
| DIVISION 21: |
| FIRE SUPPRESSION |
| DIVISION 22: |
| PLUMBING |
| DIVISION 23: |
| HVAC |
| DIVISION 25: |
| INTEGRATED AUTOMATION |
| DIVISION 26: |
| ELECTRICAL |
| DIVISION 27: |
| COMMUNICATIONS |
| DIVISION 28: |
| ELECTRONIC SAFETY AND SECURITY |
| DIVISION 31: |
| EARTHWORK |
| DIVISION 32: |
| EXTERIOR IMPROVEMENTS |
| DIVISION 33: |
| UTILITIES |
| DIVISION 34: |
| TRANSPORTATION |
| DIVISION 48: |
| ELECTRICAL POWER GENERATION |
SUBTOTAL COST:
GENERAL LIABILITY / INSURANCE:
OVERHEAD & PROFIT:
BOND:
PROJECT TOTAL COST:
A.5 GENERAL PROPOSAL INFORMATION
1. JOINT VENTURE: Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.
1. VETS-4212: Title 38, USC Section 4212(d), and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS-4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.
2. Past Safety Record: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION requires that Contracting Officers evaluate and consider past safety records of prospective contractors in awarding contracts. OFFERORS SHALL SUBMIT EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE PRICE PROPOSAL.
All offerors shall submit, as part of their price proposal, information pertaining to their past Safety and Environmental record using Exhibit D. The information must show that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA violation(s) in the past three years. If those totals are exceeded, the offeror shall attach an explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the offeror lacks insurance history, offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned offeror a Unity Rating of 1.0.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
OFFERORS WHO FAIL TO SUBMIT EXHIBIT D AND EXHIBIT E (SURETY FORM) (AND THE ASSOCIATED ADDITIONAL REQUIRED INFORMATION) AS A PART OF THEIR PROPOSAL PACKAGE WILL BE RATED LOWER THAN AN OFFEROR THAT DOES PROVIDE.
1. Site Visit: An organized site is scheduled as shown in clause 52.236-27 (Alternate I). Only one site visit will be conducted. Attendance at the site visit is not mandatory, but highly suggested for proper proposal preparation.
1. Requests for Information (RFIs): RFI’s are due, utilizing Exhibit F, no later than (NLT) 12:00 PM CST 14 calendar days prior to the date set for receipt of proposals or as amended and will not be accepted after this date. RFI’s should be submitted by email to the Contracting Officer, Alexis Meyers at alexis.meyers@va.gov. Responses will be provided by amendment to the solicitation in a question and answer format. Example: Subject Line of the RFI e-mail should be as follows: Company Name, RFI #1, 36C25625R0108 and Project #667-23-113.
1. Proposal Due Date: Proposals and Bid Bonds are due NLT the date/time shown in Block 13a of Standard Form (SF) 1442. All proposals will be submitted by E-Mail (all volumes & a copy of the Bid Bond) and received NLT date/time shown in Block 13A:
NOTE: Bid Bond signatures should be wet signed and there should be no white out corrections. Impressions from Notary must be clearly visible.
1. Magnitude of Construction: Pursuant to VAAR 836.204 the magnitude of construction is between $1,000,000.00 and $2,000,000.00.
1. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 238910 Site Preparation Contractors. The Small Business size standard is $19 Million.
1. Wage Determination (WD): The applicable Davis Bacon WD for this solicitation is incorporated as an attachment to this solicitation.
1. Period of Performance: The successful offeror shall begin performance within 10 calendar days after receiving the notice to proceed and complete all work within the time specified in the award. All punch list items must be completed during the established period of performance.
1. Funding: Award is contingent upon the availability of appropriated funds. The Government does not compensate vendors for proposal development and submission.
1. Superintendence: The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated and assigned to this project while work is being performed on site. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.
12. Holidays: The following federal holidays are observed:
| New Year's Day | Martin Luther King Jr.’s Birthday | President's Day |
| Memorial Day | Independence Day | Labor Day |
| Columbus Day | Veterans Day | Thanksgiving Day |
| Christmas Day | Juneteenth Independence Day |
Any other holiday proclaimed by the President as a Federal Holiday.
When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed by U.S. Government agencies.
A.6 Proposal Preparation
This part describes the precise mechanism for evaluating and selecting offers for this procurement for:
Project #667-23-113 Site Prep for Fisher House
A. COMPLIANCE REVIEW
The Contract Specialist and/or SSA will undertake the following steps:
· Review Proposals: Verify each proposal’s adherence to proposal instructions.
· FAR/VAAR Clause Certification/Verification: Verify that the Federal Acquisition Regulation (FAR) and Veterans Affairs Acquisition Regulation (VAAR) clause certifications/verifications are completed and returned. (i.e. VAAR 852.219-75 as an example)
· SDVOSB Verification: Confirm that each Service-Disabled Veteran-Owned Small Business (SDVOSB) is verified in Sam.gov and the SBA Dynamic Small Business Search database.
· Notification of Non-Compliance: Notify offerors immediately, in writing, if their proposal is determined not in compliance with proposal instructions. Such proposals will not be considered for award.
Requirements:
· Timely and Equitable Evaluation: Proposals must be complete, self-sufficient, and respond directly to the solicitation requirements.
· Government Discretion: The Government reserves the right to make a final determination on a proposal’s acceptability based solely on the submitted proposal without requesting additional information.
· Proposal Removal: Failure to meet any requirement may result in the proposal being removed from consideration.
Proposal Submission Guidelines:
· Provide all requested information for each factor.
· Address each element of the factors as applicable.
· Highlight factor headings in yellow or bold text.
· Ensure the proposal is in the proper format, clear, and free of ambiguities.
· Submit the best terms from a price standpoint.
· Format the proposal as specified in the instructions.
· Resolve minor or clerical errors without constituting discussions. The Contracting Officer reserves the right to award a contract without requesting revisions or discussions.
B. EVALUATION CRITERIA
The evaluation process is detailed in the solicitation section titled “PROPOSAL PREPARATION AND EVALUATION INFORMATION”. In case of any ambiguity between the solicitation and the SSEP, the solicitation prevails.
Evaluation Process:
· Best Value Determination: The Government will award a contract to the offeror whose proposal conforms to the solicitation and is determined to be “Best Value”.
· Tradeoff Strategy: Evaluation of all acceptable offers against the source selection criteria in the solicitation.
· Evaluation Factors: Offers will be evaluated using the specified evaluation factors.
· Offer Completeness: Ensures the completeness of the proposal. The SSEB will evaluate only the information provided in the initial proposal without assuming any capability not explicitly identified within it.
C. COMMUNICATION AND COMPETITIVE RANGE
In accordance with FAR 15.306(b)(1)(i):
· Pre-Establishment Communications:
· Communications may be held with offerors if past performance information is the determining factor preventing them from being within the competitive range.
· Establish Competitive Range:
· The Contracting Officer will establish a competitive range of the most highly rated proposals.
· Negotiations and Final Proposal Revisions:
· Enter into negotiations with offerors within the competitive range.
· Allow for Final Proposal Revisions as specified.
· Submission Deadline:
· Final Proposal Revisions will be due at a time and place to be determined.
D. PROPOSAL FORMAT AND EVALUATION
Proposal size will be limited as shown and font/size shall be Arial 11. Title pages, headers, and exhibits do not count towards the page limitations. If these page limits are exceeded, the pages in excess of the limit will not be read or considered.
Offerors shall submit 1 (one) email. Email shall include a consolidated PDF file, no larger than 10mb, as an attachment, outlining each factor, as listed below:
· Email Requirements:
· Subject Line: Company Name, 36C25625R0108, and Project # 667-23-113
· See Proposal Submission Requirements in the table below.
| VOL |
| FACTOR |
| PROPOSAL SUBMISSION REQUIREMENTS |
| I |
| Factor 1 |
| Submission Requirement: |
1) Material to satisfy Subfactor 1a criteria outlined below.
2) Material to satisfy Subfactor 1b criteria outlined below.
3) Material to satisfy Subfactor 1c criteria outlined below.
| Factor 2 |
| Submission Requirement: |
1) Material to satisfy subfactor 2a criteria outlined below.
2) Exhibit C – Shall be used to satisfy subfactor 2b and should be consistent with submission criteria below.
| Factor 3 |
| Submission Requirement: |
1) Offeror Shall provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity, and scope to this project.
2) Exhibit A – Offeror shall provide a completed Exhibit A to satisfy evaluation criteria below or may be used for consideration of current project examples (the form must clearly annotate what it is being used for).
3) Exhibit B –This exhibit is to be completed by an end user and submitted to contracting separately from an offeror’s proposal. Exhibits received will be used for as part of the evaluation – If Exhibit B is not received by an end user, offerors will not be penalized.
4) Exhibit C – (if applicable) to be used for subcontractor past performance if the prime intends to use subcontractor past performance to support this evaluation.
| Factor 4 |
| Submission Requirement: |
1) Signed 1442 and Amendments
2) Completed Schedule of Offer Items
3) Completed Continuation of 1442 (Divisional Price Distribution Sheet)
4) Completed Exhibit D (EMR) & Exhibit E (Surety)
5) Legible Bid Bond (impressions from notary must be clearly visible)
6) Completed VAAR Clause 852.219-75
7) 52.204-8 Annual Representations and Certifications
8) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
9) 52.209-7 Information Regarding Responsibility Matters (if applicable)
10) 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (if applicable)
11) 52.219-28 Post-Award Small Business Program Representation
12) 52.225-9 Buy American – Construction Materials (Oct 2022)
Definitions:
Recent - with in past five (5) years from the date of solicitation issuance Relevant - for purposes of this evaluation, a relevant project is defined as “construction completed in a clinical, hospital or other medical related use space similar in size and scope to this project.”
E. EVALUATION FACTORS
Factor I (Approach – Schedule – Quality Management Technical Factor), Factor II (Professional Qualifications & Specialized Experience Technical Factor), and Factor III (Past Performance) are equal in importance. Factors I, II, and III, when combined, are approximately equal in importance to Factor IV (Price).
FACTOR 1 – APPROACH – SCHEDULE– QUALITY MANAGEMENT TECHNICAL FACTOR
SUBFACTORS:
· Subfactor 1a – Management Approach Narrative
· Subfactor 1b – Schedule
· Subfactor 1c – Quality Management
Subfactor 1a – Management Approach Narrative:
Instructions:
· Offeror shall demonstrate/explain how this project will be accomplished, based on the offeror’s best interpretation of the solicitation documents.
· Offeror shall provide a phasing plan and sequencing of work in an effort to minimize impacts to patient care.
· Offeror shall provide techniques for maintaining on-time schedule performance and provide a detailed explanation as to how the project will be implemented and managed to ensure compliance with all OSHA Construction Standards, Fire and Life Safety Issues, and Security Measures.
Subfactor 1b – Schedule:
Instructions:
· Offeror shall provide a draft project schedule, with a 06/31/2025 Notice to Proceed fictitious start date (for purposes of the proposed draft schedule only). The provided schedule shall be all inclusive from the pre-construction conference, pre-construction period to include submittal #1 (detailed in SOW), construction period of preparation of the site & mobilization, critical milestones of completing the project, punch list items, demobilization, to closeout while adhering to the period of performance.
· The provided schedule shall be consistent with subfactor 1a (i.e., how the project will be accomplished & phasing).
Subfactor 1c – Quality Management:
Instructions:
· Offeror shall specify the roles/positions responsible for quality management & explain the authority those individual(s) have to ensure quality work is provided.
· Offeror shall provide a detailed explanation of proposed quality control techniques for compliance with the solicitation requirements.
· Offeror shall provide a narrative on how quality issues are managed and resolved for construction projects.
Evaluation Methodology: The VA will evaluate Management Approach, Schedule, and Quality Management to determine if the offeror understands the complexity and risk mitigation of performing all the required tasks included in this construction project. This technical factor will be evaluated for the offeror’s interpretation of the solicitation technical areas outlined in the drawings, specifications, SOW, and evaluation factor criteria. The offeror’s narratives should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.
FACTOR 2 – PROFESSIONAL QUALIFICATIONS & EXPERIENCE TECHNICAL FACTOR
SUBFACTORS:
· Subfactor 2a. Key Prime Contractor Staff
· Subfactor 2b. Subcontractors Subfactors are listed in descending order of importance
Subfactor 2a – Key Prime Contractor Staff:
Instructions:
· Provide the names of staff on an organizational chart (structured with the proposed subcontractors staff) and resumes of the offeror’s proposed project management personnel (i.e., Site Superintendent, Project Manager, Quality Control Manager, etc.). A narrative description of the individual’s management and construction capabilities, and how they will be best utilized to obtain successful project completion with the proposed subcontractors.
· Project Manager and Site Superintendent shall each have a minimum of five (5) years of experience managing or supervising multiple projects of similar size, scope, and complexity (or greater).
· Note: If the person listed as proposed Project Manager or Site Superintendent is not a current employee of the offeror but intends to become one upon award of the contract, OFFEROR SHALL SUBMIT A COPY OF A COMMITMENT LETTER FROM THAT PERSON AS A PART OF THE TECHNICAL PROPOSAL to verify offeror will be hiring him/her and he/she intends to accept the position.
Offerors are encouraged to demonstrate their experience as a prime contractor on respective resumes, likewise offerors who fail to demonstrate their experience as a prime contractor may be rated less favorably.
Advisory Note: if key personnel change, post award, that were originally evaluated during this source selection - replacement personnel qualifications and experience must meet or exceed what was originally evaluated and will need to be approved by the COR and the CO prior to work being performed.
Subfactor 2b – Subcontractors:
Instructions:
· Identify the key subcontractors and its associated socioeconomic status for the chosen project. Submit no more than five (5) Subcontractor Consent Forms (Exhibit C) for each key subcontractor. Each consent form shall have a narrative consisting of:
· Locality
· Experience with construction at medical centers
· Resumes of the subcontractors proposed staff
If an offeror intends to self-perform, then the offerors proposal must clearly annotate this intent defining which roles they intend to complete while self-performing.
Evaluation Methodology: The VA will evaluate the experience and qualifications of key personnel and subcontractors to ensure they posses the needed expertise, technical proficiency, and industry knowledge to successfully execute this project. This assessment will focus on an offeror’s ability to handle the specific type, trade, and complexity of work required; ensuring that all aspects of the project are managed/executed by skilled and competent professionals.
FACTOR 3— PAST PERFORMANCE
Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors.
Project(s) shall have a minimum construction value of between $1,000,000 and $2,000,000 and be 100% completed/or ongoing (>50% complete).
The offeror’s submission should include at a minimum:
· Project Title
· Project Location (Physical Address)
· Contract Type (Example: Design-Build, Design-Bid-Build)
· Project Owner’s Name & Current Contact Information
· Brief Description of the Scope of Work (highlight recent/relevant factors)
· Identify Project Prime Contractor and Major Subcontractors
· Project Start & Completion Date
· Project Original Contract Award Amount & Final Award Amount For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather offerors shall submit the work performed under a single task order as a project to demonstrate recent/relevancy.
If the offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared past performance, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit past performance for all Joint Venture partners may be rated lower.
Performance Relevancy Survey (Exhibit A):
Instructions:
· The offeror shall demonstrate completed/or ongoing (>50% complete) recent and relevant projects at a hospital/ medical center (Federal or other than Federal) project of this same size, scope, and complexity (or greater).
· Note: Clearly identify those examples where an offeror’s proposed subcontractor was the prime (or the subcontractor) on the project examples if utilizing Subcontractor Construction Project Capability.
Past Performance Questionnaire (PPQ-Exhibit B):
Instructions:
· Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by Offeror and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY.
· Exhibit B includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance and the Past and Present Performance Questionnaire for use in evaluating Past Performance.
· PPQ may have been completed be no later than one (1) year prior to the effective date of this action
· If an offerors Exhibit B is not received by the Contracting Officer, offerors will not be penalized.
An offeror with limited or no past performance may receive a rating based on the evaluation of its subcontractors and/or key personnel, provided an EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT FORM has been executed and included in the proposal for proposed subcontractors and/or potential key personnel not employed by the offeror. These ratings shall have the same weight as the ratings of the offeror. Offerors without a record of relevant past performance will be assigned a neutral rating in accordance with FAR 15.305(a)(2)(iv). However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.
Evaluation Methodology: Past performance will be evaluated based on the projects provided by the offeror, and performance information from government databases. Focus will be on recent and relevant construction contracts that are comparable in size, scope, and complexity.
The Intent of this evaluation is to evaluate the demonstrated ability to successfully complete comparable requirements, ensuring they have the experience and capability to deliver quality results on time, within budget, and incompliance with project specifications.
FACTOR 4— PRICE PROPOSAL REQUIREMENTS:
Evaluation Methodology: The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Price proposals will be evaluated to determine if the prices and support costs areas are:
· Complete – The proposal contains costs to perform all tasks required by the Scope of Work (SOW), specifications, and design drawings if provided.
· Reasonable – The price is determined fair and reasonable using cost or price analysis techniques described in FAR 15.404.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3M, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
JB Herbst Contracting Officer
Hand-Carried Address:
Network Contracting Office 16 Alexandria VA Health Care System 2495 Shreveport Hwy, 71N Pineville LA 71360 *Email is acceptable*
Mailing Address:
Network Contracting Office 16 Alexandria VA Health Care System 2495 Shreveport Hwy, 71N Pineville LA 71360 *Email is acceptable*
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
07/31/25 @ 9AM CST
(c) Participants will meet at— OBVAMC - BLDG 4 - Engineering Conference Room (End of Provision)
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/index.asp
(End of Provision)
2.10 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any VAAR Acquisition Regulation (48 CFR Chapter FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| NOV 2024 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.215-1 |
| INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION ALTERNATE I (OCT 1997) |
| NOV 2021 |
| 52.229-11 |
| TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION |
| JUN 2020 |
| 52.236-28 |
| PREPARATION OF PROPOSALS—CONSTRUCTION |
| OCT 1997 |
2.11 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)
(a) It is in the best interest of the Government to avoid situations which might create an organizational conflict of interest or where the Offeror’s performance of work under the contract may provide the Contractor with an unfair competitive advantage. The term ‘‘organizational conflict of interest’’ means that because of other activities or relationships with other persons, a person is unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or the person has an unfair competitive advantage.
(b) The Offeror shall provide a statement with its offer which describes, in a concise manner, all relevant facts concerning any past, present, or currently planned interest (financial, contractual, organizational, or otherwise) or actual or potential organizational conflicts of interest relating to the services to be provided under this solicitation. The Offeror shall also provide statements with its offer containing the same information for any consultants and subcontractors identified in its proposal and which will provide services under the solicitation. The Offeror may also provide relevant facts that show how its organizational and/or management system or other actions would avoid or mitigate any actual or potential organizational conflicts of interest.
(c) Based on this information and any other information solicited or obtained by the Contracting Officer, the Contracting Officer may determine that an organizational conflict of interest exists which would warrant disqualifying the Contractor for award of the contract unless the organizational conflict of interest can be mitigated to the Contracting Officer’s satisfaction by negotiating terms and conditions of the contract to that effect.