S06 RFIs 04-10-2025.pdf
PDF 25 KB Posted
- Solicitation number
- 36C25625R0002
About this file
This document is a Request for Information (RFI) for the Building 55 Accessibility Ramp project (667-24-255) with an RFP closing date of 04-25-2025. The RFI contains four questions and answers addressing project-specific details, including topographical survey information, geotechnical reporting, and personnel role requirements. Key clarifications include that the owner will provide limited topography/grading information which the contractor must verify, no geotechnical report will be provided, and the VA specifically requires dedicated personnel for Site Supervisor, Safety and Health Officer (SSHO), and Quality Control Manager (QCM) positions, prohibiting dual role assignments due to issues in previous contracts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 Cancel RFP 36C25625R0002 0002_2.docx | DOCX document | |
| P07 WD LA20250001 05-02-2025.pdf | ||
| S02 RFP Phase II 36C25625R0002 0002 06-06-2025.pdf | ||
| S06 667-24-255 Topography-Grading_RFI Answer.pdf | ||
| S06 36C25625R0002 0001.pdf | ||
| S02 Wage Determination 667-24-255 -01-03-2025.pdf | ||
| EXHIBIT C.docx | DOCX document | |
| S02 2016-03-21 Utilities Drawing.pdf | ||
| S02 SOW 10-03-2024.pdf | ||
| EXHIBIT E.docx | DOCX document | |
| EXHIBIT B.docx | DOCX document | |
| EXHIBIT D.docx | DOCX document | |
| EXHIBIT F.docx | DOCX document | |
| EXHIBIT A.docx | DOCX document | |
| S02 RFP 36C25625R0002_1 03-25-2025.pdf | ||
| S02 B55 Ramp-Existing Drawing.pdf | ||
| P09 2016-03-21 Utilities Drawing.pdf | ||
| P09 Statement of Work_Bldg 55 Ramp 08-14-2024.docx | DOCX document | |
| P09 B55 Ramp-Existing Drawing.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
667-24-255 Bldg. 55 Accessibility Ramp RFI’s RFP closes on 04-25-2025
Q1: Will the owner provide a topographic survey for the existing grading and ramp elevations. This is typically provided by the owner prior to a design.
A1: Attached you will find the only topography/grading information that we have for this area.
Contractor will have to verify accuracy.
Q2: Proposal RFI #2 – Will there be a geotech report by the owner. This may not be needed, being a ramp, but it would be good to know the soil composition and if it's very expansive soil. This is also typically provided by the owner.
A2: No, not deemed necessary.
Q3 –
Will the Site Supervisor be allowed to hold dual roles as SSHO and/or QCM?
A3: No, due to issues with previous contracts where contractors held multiple positions, the VA requires dedicated personnel for each individual positions.
Q4 - will the SSHO act as QCM?
A4: No, see A3.