This is a surety form (Exhibit E) that must be completed by a contractor's surety company and submitted as part of the technical proposal package for VA project #502-17-102 to replace roof and HVAC systems in Building 9. The form requests basic information about both the contractor and surety company, including contact details, length of bonding relationship, contractor's rating, single project bonding limit, and aggregate bonding amount. It also includes yes/no questions about whether the surety has had to complete projects for the contractor, if liability insurance has been refused, if there have been complaints of non-payment by subcontractors/suppliers, and if the surety has had to pay subcontractors/suppliers.

The form is part of solicitation #36C25625R0001 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The file itself is marked as "FOR OFFICIAL USE ONLY Source Selection Sensitive Information" and serves as a template to collect bonding information, rather than providing specific details about the scope of work or evaluation criteria.

View the file

Other files

File Type Posted
36C25625R0001 0006.docx DOCX document
36C25625R0001 0005.docx DOCX document
M-803.pdf PDF
M-112.4.pdf PDF
GI001.pdf PDF
232113 02-2020 Hydronic Piping.pdf PDF
M-801.pdf PDF
M-802.pdf PDF
36C25625R0001 0004.docx DOCX document
000115 07-2015 List of Drawing Sheets.pdf PDF
502-17-102 Running RFI Register 01152025 v2.docx DOCX document
232213 02-2020 Steam and Condensate Heating Piping.pdf PDF
36C25625R0001 0003.docx DOCX document
36C25625R0001 0002.docx DOCX document
502-17-102 Site Visit Sign in Sheet.jpg JPG image
36C25625R0001 0001.docx DOCX document
36C25625R0001 Drawing 1 - Copy.pdf PDF
36C25625R0001 RFP.docx DOCX document
36C25625R0001 Drawing M111.4 - Copy.pdf PDF
36C25625R0001 EXHIBIT B.docx DOCX document
36C25625R0001 Drawing M404 - Copy.pdf PDF
36C25625R0001 Drawing 3 - Copy.pdf PDF
36C25625R0001 Drawing 2 - Copy.pdf PDF
36C25625R0001 EXHIBIT D.docx DOCX document
36C25625R0001 EXHIBIT C.docx DOCX document
36C25625R0001 Drawing M502 - Copy.pdf PDF
36C25625R0001 Brand Name JA 10182024 Signed v2_Redacted.pdf PDF
36C25625R0001 Drawing M501 - Copy.pdf PDF
36C25625R0001 Drawing 9 - Copy.pdf PDF
36C25624R0001 WD LA30240051 Mod 2 07192024.pdf PDF
36C25625R0001 Drawing 5 - Copy.pdf PDF
36C25625R0001 Drawing M401 - Copy.pdf PDF
36C25625R0001 Drawing M402 - Copy.pdf PDF
36C25625R0001 EXHIBIT A.docx DOCX document
36C25625R0001 EXHIBIT F.docx DOCX document
36C25625R0001 Drawing 8 - Copy.pdf PDF
36C25625R0001 SOW 11222024 - Copy.docx DOCX document
36C25625R0001 Specifications 06192024 .pdf PDF
36C25625R0001 Drawing M403 - Copy.pdf PDF
36C25625R0001 Drawing M405 - Copy.pdf PDF
36C25625R0001 Drawing 7 - Copy.pdf PDF
36C25625R0001 Drawing 6 - Copy.pdf PDF
36C25625R0001 Drawing 4 - Copy.pdf PDF
36C25625R0001 PRA - Copy.pdf PDF
36C25625R0001 Drawing 10 - Copy.pdf PDF
36C25625R0001 Drawing M122.3 - Copy.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 502-17-102 Replace Roof & HVAC BLDG 9 36C25625R0001

EXHIBIT E

SURETY FORM

OFFEROR INSTRUCTIONS: To be completed by Surety and SUBMITTED BY OFFEROR AS A PART OF THE TECHNICAL PROPOSAL PACKAGE.

Contractor Name:

Address:

Telephone: Email:

Please complete below and return no later than:

Surety Name:

Surety Address:

POC:Title:
Telephone:Email:

How long have you provided bonding for the above contractor? YEARS What is the contractor’s rating?

Bonding Limit for a single project?$
Aggregate amount?$

Have you ever had to complete a project for the contractor? [ ] YES [ ] NO Has liability insurance ever been refused? [ ] YES [ ] NO Have there been complaints of non-payment by subcontractor/suppliers? [ ] YES [ ] NO Has the surety had to pay subcontractors/suppliers? [ ] YES [ ] NO

File details come from the government source that posted it. Updated .