This is a List of Drawing Sheets (Section 00 01 15) for VA Project No. 502-17-102 to replace the roof and HVAC system in Building 9 at the Alexandria VA Health Care System in Pineville, LA. The document was issued as part of bid documents dated 08/10/20 with Addendum #1 dated 01/10/2025.
The drawing list details a comprehensive set of construction drawings organized into five main disciplines: General (3 sheets covering logistics and infection control), Structural (8 sheets including framing plans for all floors), Architectural (20 sheets detailing demolition and new work across multiple phases), Fire Protection (5 sheets), Mechanical (39 sheets covering HVAC modifications, controls, and associated details), and Electrical (13 sheets). The drawings indicate a phased approach to construction with work occurring across multiple floors (1st through 3rd floors, attic, and roof) and includes temporary provisions to maintain building operations during construction.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs VA Project No. 502-17-102 Alexandria VA Health Care System Replace Roof and HVAC System in Bldg. 9 Pineville, LA Bid Documents: 08/10/20 Addendum #1: 01/10/2025
07-01-15
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER SHEET & DRAWING INDEX
GI002 CONSTRUCTION LOGISTICS PLAN
GC101 INFECTION CONTROL & PHASING PLAN
STRUCTURAL
S-001 ABBREVIATIONS & NOTES
SF111 FRAMING PLAN 1ST FLOOR
SF121 FRAMING PLAN 2ND FLOOR
SF131 FRAMING PLAN 3RD FLOOR
SF141 FRAMING PLAN ATTIC
SF151 FRAMING PLAN ROOF
S-501 SECTIONS & DETAILS
S-502 SECTIONS & DETAILS
ARCHITECTURAL
A-001 SYMBOLS, ABBREVIATIONS, & WALL TYPES
AD111.1 PHASE 1 – COORDINATION PLAN 1ST FLOOR
AD121.1 PHASE 1 – COORDINATION PLAN 2ND FLOOR
AD131.2 PHASE 2 – DEMOLITION PLAN 3RD FLOOR
AD132.2 PHASE 2 – DEMOLITION CEILING PLAN 3RD FLOOR
AD141.2 PHASE 2 – DEMOLITION PLAN ATTIC
AD151.2 PHASE 2 – DEMOLITION PLAN ROOF
AD121.3 PHASE 3 – DEMOLITION PLAN 2ND FLOOR
AD122.3 PHASE 3 – DEMOLITION CEILING PLAN 2ND FLOOR
AD111.4 PHASE 4 – DEMOLITION PLAN 1ST FLOOR
AD112.4 PHASE 4 – DEMOLITION CEILING PLAN 1ST FLOOR
00 01 15 - 2
AS131.2 PHASE 2 – FLOOR PLAN 3RD FLOOR & FINISH SCHEDULE
AS132.2 PHASE 2 – CEILING PLAN 3RD FLOOR
AS141.2 PHASE 2 – ATTIC PLAN
AS151.2 PHASE 2 – ROOF PLAN
AS121.3 PHASE 3 – FLOOR PLAN 2ND FLOOR
AS122.3 PHASE 3 – CEILING PLAN 2ND FLOOR
AS111.4 PHASE 4 – FLOOR PLAN 1ST FLOOR
AS112.4 PHASE 4 – CEILING PLAN 1ST FLOOR
A-301 EXTERIOR ELEVATIONS
A-401 ENLARGED SHAFT DETAILS
A-501 ROOF DETAILS
FIRE PROTECTION
F-001 DETAILS, GENERAL NOTES & LEGEND
FX111 PLAN 1ST FLOOR
FX121 PLAN 2ND FLOOR
FX131 PLAN 3RD FLOOR
FX141 PLAN ATTIC
MECHANICAL
M-001 ABBREVIATIONS, NOTES, & SYMBOLS
M-011.1 PHASE 1 - TEMPORARY DUCTWORK & PIPING PLAN 1ST FLOOR
M-021.1 PHASE 1 - TEMPORARY DUCTWORK & PIPING PLAN 2ND FLOOR
M-301.1 PHASE 1 - TEMPORARY DUCTWORK & PIPING DIAGRAM
M-301.2 PHASE 2 - DUCTWORK & PIPING DIAGRAMS
M-301.3 PHASE 3 - DUCTWORK & PIPING DIAGRAMS
M-301.4 PHASE 4 - DUCTWORK & PIPING DIAGRAMS
MD131.2 PHASE 2 - DEMOLITION DUCTWORK & PIPING PLAN 3RD FLOOR
MD132.2 PHASE 2 - DEMOLITION DUCTWORK & PIPING PLAN 3RD FLOOR
MD133.2 PHASE 2 - DEMOLITION PLAN 3RD FLOOR SHAFT WORK
MD141.2 PHASE 2 - DEMOLITION DUCTWORK & PIPING PLAN ATTIC
MD142.2 PHASE 2 - DEMOLITION DUCTWORK & PIPING PLAN ATTIC
MD121.3 PHASE 3 - DEMOLITION DUCTWORK & PIPING PLAN 2ND FLOOR
00 01 15 - 3
MD122.3 PHASE 3 - DEMOLITION DUCTWORK & PIPING PLAN 2ND FLOOR
MD123.3 PHASE 3 - DEMOLITION PLAN 2ND FLOOR SHAFT WORK
MD111.4 PHASE 4 - DEMOLITION DUCTWORK & PIPING PLAN 1ST FLOOR
MD112.4 PHASE 4 - DEMOLITION DUCTWORK & PIPING PLAN 1ST FLOOR
M-131.2 PHASE 2 - PARTIAL DUCTWORK & PIPING PLAN 3RD FLOOR
M-132.2 PHASE 2 - PARTIAL DUCTWORK & PIPING PLAN 3RD FLOOR
M-141.2 PHASE 2 - PARTIAL DUCTWORK & PIPING PLAN ATTIC
M-142.2 PHASE 2 - PARTIAL DUCTWORK & PIPING PLAN ATTIC
M-121.3 PHASE 3 - PARTIAL DUCTWORK & PIPING PLAN 2ND FLOOR
M-122.3 PHASE 3 - PARTIAL DUCTWORK & PIPING PLAN 2ND FLOOR
M-111.4 PHASE 4 - PARTIAL DUCTWORK & PIPING PLAN 1ST FLOOR
M-112.4 PHASE 4 - PARTIAL DUCTWORK & PIPING PLAN 1ST FLOOR
M-401 ENLARGED PLANS
M-402 ENLARGED PLANS
M-403 ENLARGED PLANS
M-404 ENLARGED PLANS
M-405 SECTIONSM-501
M-501 DETAILS
M-502 DETAILS
M-503 DETAILS
M-504 DETAILS
M-505 DETAILS
M-701 SCHEDULES
M-702 SCHEDULES
M-703 SCHEDULES
M-801 CONTROLS ABBREVIATIONS, NOTES, & SYMBOLS
M-802 CONTROLS AIR HANDLING UNIT DIAGRAM
M-803 CONTROLS HYDRONIC SYSTEMS DIAGRAM
ELECTRICAL
E-001 ABBREVIATIONS & SYMBOLS
E-002 NOTES
ED111 DEMOLITION PLAN 1ST FLOOR
ED121 DEMOLITION PLAN 2ND FLOOR
00 01 15 - 4
ED131 DEMOLITION PLAN 3RD FLOOR
ED141 DEMOLITION PLAN ATTIC
ED151 DEMOLITION PLAN ROOF
E-111 PLAN 1ST FLOOR
E-121 PLAN 2ND FLOOR
E-131 PLAN 3RD FLOOR
E-141 PLAN ATTIC
E-151 PLAN ROOF
E-501 DETAILS
E-601 SINGLE LINE DIAGRAM
E-701 SCHEDULES
E-702 SCHEDULES
- - - E N D - - -