AMENDED SCHEDULE.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25625Q0479
About this file
The document is an Amended Schedule for a VA solicitation (36C25625Q0479) detailing a water processing system procurement and maintenance contract for the Veterans Health Administration. The primary scope involves installing an Evoqua M41RGP RO or equivalent water processing system for SPS and Endoscopy Reprocessing, capable of producing 65 gallons per minute and delivering 480 gallons per hour to specific rooms (BB260 and BB-231). System requirements include RO/DI system with gray SCH80 PVC piping, micron and carbon filters, water softener, UV and endotoxin filtration, and service deionization tanks.
The contract spans five years with a base period from April 2025 to May 2025 for installation, followed by four consecutive one-year option periods (May 2025-April 2030) for monthly equipment maintenance and functionality testing. Each year includes two line items: monthly maintenance of installed equipment and monthly testing of equipment functionality and water hardness. The total contract is structured with 11 contract line items (CLINs) covering installation, maintenance, and testing, with pricing to be determined by the offeror. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, specifically within Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIS COMPLETED 3.docx | DOCX document | |
| 36C25625Q0479 0004.docx | DOCX document | |
| AMENDMENT 36C25625Q0479 0003.docx | DOCX document | |
| RFIS COMPLETED 2.docx | DOCX document | |
| AMENDMENT 36C25625Q0479 0002.docx | DOCX document | |
| HST-100-0BAR.pdf | ||
| 2380D8R5 1 drawings.pdf | ||
| RO AND DI WATER SYSTEM - PRE-BID RFIs- COMPLETE.docx | DOCX document | |
| AMENDMENT 36C25625Q0479 0001.docx | DOCX document | |
| Service Contract Act WD 2015-5233.txt | TXT text file | |
| WAGE DETERMINATION - TX20250253 01-03-2025 - CONSTRUCTION.txt | TXT text file | |
| 36C25625Q0479 - SOLICITATION.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| The general contractor and sub-contractors shall furnish all labor, materials, equipment, supervision, and all other necessary provisions to install an Evoqua M41RGP RO or Equal water processing system for SPS, Endoscopy Reprocessing equipment and a critical water loop. The proposed system must produce delivery rate of 65 gallons per minute and deliver at least 480 gallons per hour to the equipment located in room BB260 and BB-231 Endoscopy Reprocessing. All components for this system must fit into approximately 150 square feet area. The New RO/DI System requirements and piping requirements: a. RO system and DI distribution loop; gray SCH80 PVC piping and fusion-welded polypropylene, approximately 450 feet of pipping. b. Micron, Carbon filters and Water softener c. UV Filtration and Endotoxin filters d. Service Deionization tanks e. Recirculation process to reserve tank with both secondary UV and endotoxin filtration. *includes initial start-up and water testing* |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Contract Period: Base POP Begin: 04-01-2025 POP End: 05-01-2025
| 0002 |
| MAINTENANCE OF INSTALLED EQUIPMENT AS PER SOW |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
| 0003 |
| MONTHLY TESTING OF EQUIPMENT FUNCTIONALITY AND WATER HARDNESS |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
| 0004 |
| MAINTENANCE OF INSTALLED EQUIPMENT AS PER SOW |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
| 0005 |
| MONTHLY TESTING OF EQUIPMENT FUNCTIONALITY AND WATER HARDNESS |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
| 0006 |
| MONTHLY MAINTENANCE OF INSTALLED EQUIPMENT AS PER SOW |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
| 0007 |
| MONTHLY TESTING OF EQUIPMENT FUNCTIONALITY AND WATER HARDNESS |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
| 0008 |
| MONTHLY MAINTENANCE OF INSTALLED EQUIPMENT AS PER SOW |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 3 POP Begin: 05-01-2028 POP End: 04-30-2029
| 0009 |
| MONTHLY TESTING OF EQUIPMENT FUNCTIONALITY AND WATER HARDNESS |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 3 POP Begin: 05-01-2028 POP End: 04-30-2029
| 0010 |
| MONTHLY MAINTENANCE OF INSTALLED EQUIPMENT AS PER SOW |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 4 POP Begin: 05-01-2029 POP End: 04-30-2030
| 0011 |
| MONTHLY TESTING OF EQUIPMENT FUNCTIONALITY AND WATER HARDNESS |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Contract Period: Option 4 POP Begin: 05-01-2029 POP End: 04-30-2030
| GRAND TOTAL |
| __________________ |