A501.pdf

PDF 192 KB Posted

Attached to
Z1AA--598-23-140 | CON | B190/191 Roof Renovations LETC
Solicitation number
36C25624R0073
Issued by

About this file

This document appears to be a set of architectural plans and details related to a roof renovation project for Buildings 190 and 191 at the VA LETC (Learning Education Training Center) in North Little Rock, Arkansas. The project is solicitation number 36C25624R0073, titled "Z1AA--598-23-140 | CON | B190/191 Roof Renovations LETC".

The plans and details cover various aspects of the roof renovation, including new cricket installation, existing roof slope and ridge line, composition shingle roofing, flashing, parapets, soffits, and other related construction elements. The solicitation has a site visit scheduled for 3-7-2024, with RFIs due by 3-12-2024 and proposals due by 3-27-2024, unless changed by amendment. The project is being procured by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
598-23-140 Site Visit 2 sign in 031824.pdf PDF
200086-EJ3.pdf PDF
LETCA6.pdf PDF
598-23140 - SITE VISIT 1 SIGN IN.pdf PDF
A501 old wing.pdf PDF
36C25624R0073 0002_1.docx DOCX document
174REJ7.pdf PDF
598-23-140 - PRE-BID RFIs COMPLETE.docx DOCX document
2886a201.pdf PDF
A201 old wing.pdf PDF
A202 old wing.pdf PDF
2886a501.pdf PDF
36C25624R0073 0002.docx DOCX document
A201.pdf PDF
36C25624R0073 0001.docx DOCX document
36C25624R0073 0001_1.docx DOCX document
VA LR AND NLR INSPECTION REPORT AND OHM TEST RESULTS 2019.pdf PDF
SOW B190 191 Roof Renovations.pdf PDF
36C25624R0073 - SOLICITATION.docx DOCX document
CONTRACTOR EVALUATION FORM.docx DOCX document
WAGE DETERMINATION AR20240032 01-05-2024.pdf PDF
36C25624R0073_1.docx DOCX document
Past and Present Performance Questionnaire.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VI

1.1

1.2 new cricket @ 3 in 12 valley flashing exist. roof slope exist. roof slope ridge line composite shingles @ 8 in 12 asphalt shingles @ 8 in 12 asphalt shingles @ 8 in 12

K1 A501

J8 A501

P1 A501

P1 A501

A1 A501

A1 A501 metal coping on parapet wall metal coping on parapet wall valley flashing hip roof at entry valley flashing hip roof at entry

J13 A501 exist. roof slope

VTRVTR

VTR VTR

1.2

Attic 544' - 4"

Composition Shingles on Felt on Plywood Decking

Precast Concrete

Textured Paint

5/8" Gyp. Bd. Furr Dn. on 6" Met. Stud Framing

Aluminum Storefront System

Sprayed on Insulation

1 1/2" Rigid Insulaiton

Metal Fascia

2 x Framing

Vented Aluminum Soffit

1' - 4"

Alum. Soffit Trim

Painted Steel Lintel Angle

Thru Wall Flashing

2 x Blocking

Attic 544' - 4"

Face Brick

Sealant

Stepped Counter Flashing

Roof Cricket

Fastener

Rake Flashing

Composition Shingles on Roofing Felt

Plywood Roof Decking

Attic 544' - 4"

EIFS Panel

2 x Framing

Sprayed on Insulation

T.O.S.

546' - 0 1/2"

Metal Fascia Attached to cont. 1 x Fascai Plate

Steel Beam - Ref: Structural

SealantCaulk

5/8" Gyp. Bd. on 2x4 Studs @ 16" o.c.

1 1/2"3/4"

6"

1 1/2"

8" 2'

0"

3/ 4"

1' - 4"1' - 0"

5/8" Gyp. Bd. on sloped 2 x 6 Rafters

Composition Shingles on Plywood Deck

2 x Framing

2 x Blocking

Metal Fascia Attached to cont. 1 x Fascia Plate

1 x Blocking

6" Batt Insulation

Center line of column

Ref: Det. K1 This Sht. For Flashing Notes Face Brick

2" Rigid Insulation

8" C.M.U.

Ceiling Framing - Ref. Structural

5/8" Gyp. Bd. on 2 x Ceiling Joists

5/8" Gyp. Bd. on 3 5/8" Met.

Studs @ 16" o.c.

Brick Ties @ 16" o.c.

1' - 2"

1' - 2"

1" 4"

Prefinished (Powder Coated) Aluminum Coping

2 Layers 2 x Blocking

Reinforcing @ 16" o.c.

Composition Shingles on Felt on Plywood Decking

1 1/2" Rigid Insulaiton

Metal Fascia

2 x Framing

Vented Aluminum Soffit

Alum. Soffit Trim

Sprayed on Insulation

Brick Ties @ 16" o.c.

NO. C-6

ARCHITECTS

REGISTERED

S U

C T

A R K NA S

S S

K A

AI

OC

T E S

T

S

SA

T C

E

R

I H

C

A

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

REVISIONS DATE

APPROVED: Medical Center Director

APPROVED: Associate Director

APPROVED: Assistant Director

APPROVED: Chief of Staff

APPROVED: Facility Planner

APPROVED: Chief Engineer

APPROVED: Service Chief

APPROVED: Service Chief

APPROVED: Service Chief

DRAWING TITLE

ARCHITECTS

PROJECT TITLE

BUILDING NUMBER CHECKED DRAWN

LOCATION

DATE

PROJECT NUMBER

DRAWING NO.

Dwg. of 47

D

EP

AR

TM

EN

T

O F

VE

TE

R

AN

A

FF

AI

R

S

Offic e o f F ac iliti es

8/

/2

:2 9:

A

M

North Little Rock, AR

8-1-08

2.3597.08

Security Training Dormitory

A501

MD, RC GC, KW

Roof Plan

Roof General Notes

A CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND REPORT ANY

DISCREPANCIES

B UNLESS OTHERWISE NOTED, ANY NOTE, DETAIL OR FEATURE INDICATED FOR

ONE CONDITION SHALL BE APPLICABLE FOR ALL ALIKE AND SIMILAR CONDITIONS.

C THE APPROXIMATE LOCATION OF ROOF DEVICES AND PENETRATIONS ARE

SHOWN ON THE PLANS FOR INFORMATION ONLY. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR UNDERSTANDING THE ACTUAL LOCATION OF THESE AND ALL

OTHER ITEMS PRIOR TO BEGINNING CONSTRUCTION.

D DO NOT APPLY ROOFING SYSTEM TO WET, DAMP OR FROZEN DECK.

E PROTECT EXISTING ROOFING SYSTEM IN ACCORDANCE WITH EXISTING ROOFING

SYSTEM MANUFACTURER'S RECOMMENDATIONS. PROTECT ROOF THROUGHOUT

DURATION OF EXTERIOR DEMOLITION AND CONSTRUCTION WORK.

F MAINTAIN EXISTING BUILDING WEATHERPROOFING AT ALL TIMES. SCHEDULE

AND REGULATE ALL ACTIVITIES IN ORDER TO COMPLETE EACH DAYS WORK IN

WEATHER-TIGHT CONDITION. PROTECT ALL PENETRATIONS THROUGH EXISTING

ROOF AT ALL TIMES. CONTRACTOR TO KEEP ROOF AND BUILDING

WEATHER-TIGHT DURING COURSE OF WORK.

G REMOVE ONLY THAT PORTION OF THE EXISTING ROOFING SYSTEM NECESSARY

TO ACCOMMODATE NEW CONSTRUCTION. INSTALL ROOFING MANUFACTURER'S

TERMINATION SYSTEM AS A MEANS TO PROTECT EXISTING ROOFING SYSTEM.

REMOVE ONLY THAT PORTION OF THE EXISTING ROOFING SYSTEM NECESSARY

TO ACCOMMODATE NEW CONSTRUCTION. INSTALL ROOFING MANUFACTURER'S

TERMINATION SYSTEM AS A MEANS TO PROTECT EXISTING ROOFING SYSTEM.

H THERE SHALL BE NO TRAFFIC ON EXISTING ROOF EXCEPT OVER ROOF

PROTECTION CONSISTING OF 1/2" CDX PLYWOOD OVER 1/2" BLACKBOARD

(INSULATION).

1/8" = 1'-0" A8 Roof Plan

1 1/2" = 1'-0" A1 Fascia Detail

1 1/2" = 1'-0" K1 Flashing Detail @ Existing Roof

1 1/2" = 1'-0" J8 Fascia at Sun Room

1 1/2" = 1'-0" F1 Flashing Detail

1 1/2" = 1'-0" P1 Coping Detail

1 1/2" = 1'-0" J13 Roof Overhang Detail @ Rake

Sheets and Views
A501-Layout1

File details come from the government source that posted it. Updated .