A501.pdf
PDF 192 KB Posted
- Solicitation number
- 36C25624R0073
About this file
This document appears to be a set of architectural plans and details related to a roof renovation project for Buildings 190 and 191 at the VA LETC (Learning Education Training Center) in North Little Rock, Arkansas. The project is solicitation number 36C25624R0073, titled "Z1AA--598-23-140 | CON | B190/191 Roof Renovations LETC".
The plans and details cover various aspects of the roof renovation, including new cricket installation, existing roof slope and ridge line, composition shingle roofing, flashing, parapets, soffits, and other related construction elements. The solicitation has a site visit scheduled for 3-7-2024, with RFIs due by 3-12-2024 and proposals due by 3-27-2024, unless changed by amendment. The project is being procured by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 598-23-140 Site Visit 2 sign in 031824.pdf | ||
| 200086-EJ3.pdf | ||
| LETCA6.pdf | ||
| 598-23140 - SITE VISIT 1 SIGN IN.pdf | ||
| A501 old wing.pdf | ||
| 36C25624R0073 0002_1.docx | DOCX document | |
| 174REJ7.pdf | ||
| 598-23-140 - PRE-BID RFIs COMPLETE.docx | DOCX document | |
| 2886a201.pdf | ||
| A201 old wing.pdf | ||
| A202 old wing.pdf | ||
| 2886a501.pdf | ||
| 36C25624R0073 0002.docx | DOCX document | |
| A201.pdf | ||
| 36C25624R0073 0001.docx | DOCX document | |
| 36C25624R0073 0001_1.docx | DOCX document | |
| VA LR AND NLR INSPECTION REPORT AND OHM TEST RESULTS 2019.pdf | ||
| SOW B190 191 Roof Renovations.pdf | ||
| 36C25624R0073 - SOLICITATION.docx | DOCX document | |
| CONTRACTOR EVALUATION FORM.docx | DOCX document | |
| WAGE DETERMINATION AR20240032 01-05-2024.pdf | ||
| 36C25624R0073_1.docx | DOCX document | |
| Past and Present Performance Questionnaire.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VI
1.1
1.2 new cricket @ 3 in 12 valley flashing exist. roof slope exist. roof slope ridge line composite shingles @ 8 in 12 asphalt shingles @ 8 in 12 asphalt shingles @ 8 in 12
K1 A501
J8 A501
P1 A501
P1 A501
A1 A501
A1 A501 metal coping on parapet wall metal coping on parapet wall valley flashing hip roof at entry valley flashing hip roof at entry
J13 A501 exist. roof slope
VTRVTR
VTR VTR
1.2
Attic 544' - 4"
Composition Shingles on Felt on Plywood Decking
Precast Concrete
Textured Paint
5/8" Gyp. Bd. Furr Dn. on 6" Met. Stud Framing
Aluminum Storefront System
Sprayed on Insulation
1 1/2" Rigid Insulaiton
Metal Fascia
2 x Framing
Vented Aluminum Soffit
1' - 4"
Alum. Soffit Trim
Painted Steel Lintel Angle
Thru Wall Flashing
2 x Blocking
Attic 544' - 4"
Face Brick
Sealant
Stepped Counter Flashing
Roof Cricket
Fastener
Rake Flashing
Composition Shingles on Roofing Felt
Plywood Roof Decking
Attic 544' - 4"
EIFS Panel
2 x Framing
Sprayed on Insulation
T.O.S.
546' - 0 1/2"
Metal Fascia Attached to cont. 1 x Fascai Plate
Steel Beam - Ref: Structural
SealantCaulk
5/8" Gyp. Bd. on 2x4 Studs @ 16" o.c.
1 1/2"3/4"
6"
1 1/2"
8" 2'
0"
3/ 4"
1' - 4"1' - 0"
5/8" Gyp. Bd. on sloped 2 x 6 Rafters
Composition Shingles on Plywood Deck
2 x Framing
2 x Blocking
Metal Fascia Attached to cont. 1 x Fascia Plate
1 x Blocking
6" Batt Insulation
Center line of column
Ref: Det. K1 This Sht. For Flashing Notes Face Brick
2" Rigid Insulation
8" C.M.U.
Ceiling Framing - Ref. Structural
5/8" Gyp. Bd. on 2 x Ceiling Joists
5/8" Gyp. Bd. on 3 5/8" Met.
Studs @ 16" o.c.
Brick Ties @ 16" o.c.
1' - 2"
1' - 2"
1" 4"
Prefinished (Powder Coated) Aluminum Coping
2 Layers 2 x Blocking
Reinforcing @ 16" o.c.
Composition Shingles on Felt on Plywood Decking
1 1/2" Rigid Insulaiton
Metal Fascia
2 x Framing
Vented Aluminum Soffit
Alum. Soffit Trim
Sprayed on Insulation
Brick Ties @ 16" o.c.
NO. C-6
ARCHITECTS
REGISTERED
S U
C T
A R K NA S
S S
K A
AI
OC
T E S
T
S
SA
T C
E
R
I H
C
A
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
REVISIONS DATE
APPROVED: Medical Center Director
APPROVED: Associate Director
APPROVED: Assistant Director
APPROVED: Chief of Staff
APPROVED: Facility Planner
APPROVED: Chief Engineer
APPROVED: Service Chief
APPROVED: Service Chief
APPROVED: Service Chief
DRAWING TITLE
ARCHITECTS
PROJECT TITLE
BUILDING NUMBER CHECKED DRAWN
LOCATION
DATE
PROJECT NUMBER
DRAWING NO.
Dwg. of 47
D
EP
AR
TM
EN
T
O F
VE
TE
R
AN
A
FF
AI
R
S
Offic e o f F ac iliti es
8/
/2
:2 9:
A
M
North Little Rock, AR
8-1-08
2.3597.08
Security Training Dormitory
A501
MD, RC GC, KW
Roof Plan
Roof General Notes
A CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND REPORT ANY
DISCREPANCIES
B UNLESS OTHERWISE NOTED, ANY NOTE, DETAIL OR FEATURE INDICATED FOR
ONE CONDITION SHALL BE APPLICABLE FOR ALL ALIKE AND SIMILAR CONDITIONS.
C THE APPROXIMATE LOCATION OF ROOF DEVICES AND PENETRATIONS ARE
SHOWN ON THE PLANS FOR INFORMATION ONLY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR UNDERSTANDING THE ACTUAL LOCATION OF THESE AND ALL
OTHER ITEMS PRIOR TO BEGINNING CONSTRUCTION.
D DO NOT APPLY ROOFING SYSTEM TO WET, DAMP OR FROZEN DECK.
E PROTECT EXISTING ROOFING SYSTEM IN ACCORDANCE WITH EXISTING ROOFING
SYSTEM MANUFACTURER'S RECOMMENDATIONS. PROTECT ROOF THROUGHOUT
DURATION OF EXTERIOR DEMOLITION AND CONSTRUCTION WORK.
F MAINTAIN EXISTING BUILDING WEATHERPROOFING AT ALL TIMES. SCHEDULE
AND REGULATE ALL ACTIVITIES IN ORDER TO COMPLETE EACH DAYS WORK IN
WEATHER-TIGHT CONDITION. PROTECT ALL PENETRATIONS THROUGH EXISTING
ROOF AT ALL TIMES. CONTRACTOR TO KEEP ROOF AND BUILDING
WEATHER-TIGHT DURING COURSE OF WORK.
G REMOVE ONLY THAT PORTION OF THE EXISTING ROOFING SYSTEM NECESSARY
TO ACCOMMODATE NEW CONSTRUCTION. INSTALL ROOFING MANUFACTURER'S
TERMINATION SYSTEM AS A MEANS TO PROTECT EXISTING ROOFING SYSTEM.
REMOVE ONLY THAT PORTION OF THE EXISTING ROOFING SYSTEM NECESSARY
TO ACCOMMODATE NEW CONSTRUCTION. INSTALL ROOFING MANUFACTURER'S
TERMINATION SYSTEM AS A MEANS TO PROTECT EXISTING ROOFING SYSTEM.
H THERE SHALL BE NO TRAFFIC ON EXISTING ROOF EXCEPT OVER ROOF
PROTECTION CONSISTING OF 1/2" CDX PLYWOOD OVER 1/2" BLACKBOARD
(INSULATION).
1/8" = 1'-0" A8 Roof Plan
1 1/2" = 1'-0" A1 Fascia Detail
1 1/2" = 1'-0" K1 Flashing Detail @ Existing Roof
1 1/2" = 1'-0" J8 Fascia at Sun Room
1 1/2" = 1'-0" F1 Flashing Detail
1 1/2" = 1'-0" P1 Coping Detail
1 1/2" = 1'-0" J13 Roof Overhang Detail @ Rake
| Sheets and Views |
| A501-Layout1 |
File details come from the government source that posted it. Updated .